HomeMy WebLinkAboutAdden 1 � CAG-15-207 , Adden #1-17
Washington State
�� Department of Twansportation
Supplemental Agreement Organization and Address
Number 1 BergerABAM Inc.
Original Agreement Number 33301 Ninth Avenue S.,Suite 300
Federal Way,WA 98003
CAG-15-207
Phone: 206-431-2300
Project Number Execution Date Completion Date
TED4003843 06/28/2016 12/31/2018
Project Title New Maximum Amount Payable
NE 31st Street Bridge Replacement $329,204
Description of Work
Extend the contract completion date.
The Local Agency of Citv ofRenton
desires to supplement the agreement entered in to with Ber�erABA1v1�nc.
and executed on 06�2g�2oi6 and identified as Agreement No. Ca�-15-207
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
This Supplemental Agreement does not change the Scope of Work.
��
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
fOP C0171plet1011 Of the WOfk t0 I'@8d: Chanee contract comnletion date from December 31 2017 to December 31 2018
III
Section V, PAYMENT, shall be amended as follows:
This Supplemental Agreement does not change the maximum amount payable.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By; Ber erABAM Inc. gy; Greeg Zimmerman.Public Works Administrator
t��/ L � 1��----� �
Consultant Sign ure pro ' g Authority Signature
l � l
Date
DOT Form 140-063
Revised 09/2005