HomeMy WebLinkAboutM_NPDES_20230621_V1
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47600, Olympia, WA 98504-7600 • 360-407-6000
June 20, 2023
William Andres
Coughlin Porter Lundeen
801 2nd Ave Ste 900
Seattle, WA 98104
RE: Coverage under the Construction Stormwater General Permit
Permit number: WAR312499
Site Name: Seattle Sounder FC Headquarters and Training Center
Location: 1901 Oakesdale Avenue SW
Renton County: King
Disturbed Acres: 13.15
Dear William Andres:
The Washington State Department of Ecology (Ecology) received your Notice of Intent for
coverage under Ecology’s Construction Stormwater General Permit (CSWGP). This is your
permit coverage letter. Your permit coverage is effective June 20, 2023.
Retain this letter as an official record of permit coverage for your site. You may keep your
records in electronic format if you can easily access them from your construction site. You can
get the CSWGP, permit forms, and other information at Ecology’s CSWGP eCoverage Packet
webpage1. Contact your Permit Administrator, listed below, if you want a copy of the CSWGP
mailed to you. Please read the permit and contact Ecology if you have any questions.
Electronic Discharge Monitoring Reports (WQWebDMR)
This permit requires you to submit monthly discharge monitoring reports (DMRs) for the full
duration of permit coverage (from the first full month of coverage to termination). Your first
sampling and reporting period will be for the month of July 2023 and your first DMR must be
submitted by August 15, 2023.
You must submit your DMRs electronically using Ecology’s secure online system, WQWebDMR.
To sign up for WQWebDMR go to Ecology’s WQWebPortal guidance webpage2. If you have
1 http://www.ecology.wa.gov/eCoverage-packet
2 https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality-permits-
guidance/WQWebPortal-guidance
William Andres
June 20, 2023
Page 2
questions, contact the portal staff at (360) 407-7097 (Olympia area), or (800) 633-6193/Option
3, or email WQWebPortal@ecy.wa.gov.
Appeal Process
You have a right to appeal coverage under the general permit to the Pollution Control Hearing
Board (PCHB). Appeals must be filed within 30 days of the date of receipt of this letter. Any
appeal is limited to the general permit’s applicability or non-applicability to a specific
discharger. The appeal process is governed by chapter 43.21B RCW and chapter 371-08 WAC.
“Date of receipt” is defined in RCW 43.21B.001(2). For more information regarding your right to
appeal, please reference Ecology’s Focus Sheet: Appeal of General Permit Coverage3.
Annual Permit Fees
RCW 90.48.465 requires Ecology to recover the costs of managing the permit program. Permit
fees are invoiced annually until the permit is terminated. Termination conditions are described
in the permit. For permit fee related questions, please contact the Water Quality Fee Unit at
wqfeeunit@ecy.wa.gov or (800) 633-6193/Option 2. You can also visit Water Quality Permit
Fees Webpage4 for more information.
Ecology Field Inspector Assistance
If you have questions regarding stormwater management at your construction site, please
contact your Regional Inspector, Luis Buen Abad of Ecology’s Northwest Regional Office in
Shoreline at luis.buenabad@ecy.wa.gov, or (425) 256-0891.
Questions or Additional Information
Ecology is here to help. Please review our Construction Stormwater General Permit webpage5 for more
information. If you have questions about the Construction Stormwater General Permit, please
contact your Permit Administrator, Stacey Britton at stacey.britton@ecy.wa.gov or (360) 764-3727.
Sincerely,
Jeff Killelea, Manager
Permit and Technical Services Section
Water Quality Program
3 https://apps.ecology.wa.gov/publications/summarypages/1710007.html
4 https://ecology.wa.gov/Water-Shorelines/Water-quality/Water-quality-permits/Fees
5 www.ecology.wa.gov/constructionstormwaterpermit