HomeMy WebLinkAboutCO 1 ' CAG-15-148, CO #1-16 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG-15-148 Maplewood Creek Stormwater Outfall Improvements Project C.O.# 1 SW P-27-3617 CONTRACTOR: Olson Bros. Excavating, tnc. SUMMARY OF PROPOSED CHANGE: Working Days Extension No Cost Working days for the project were exceeded and stopped being counted in December 2015 and January 2016 due to the holidays and frequent rains that made some work impossible to perf'orm. This change order adds working days to complete the remaining work for the project,starting on February 8, 2016, per the attached schedule. Some work such as installing concrete curb and gutter and asphalt paving is weather dependant. The City may grant Non-Working Days when appropriate. There are no additional costs for this change order. TOTAL CHANGE ORDER COST= $0.00 Additional Working Days added to the Contract for this Change Order: 20 . ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTALAFTER CHANGE Saaa,00s.00 Saaa,00s.00 So.00 5aaa,00s.00 SIGNATURES: ���-��` — �� -� 12/15/16 Contractor: Date: Project Engineer: � � Date: 2 "1 p'�6 Approved By: Date: � rn�ey syrt. n��.�.) Approved By: Date: �� � / Ik orksAdministotor� \\RVFPS-02\Depts\PW\Fle Sys\5WP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\2736Z7 Maplewood Creek Basin Storm System Improvements\1600 Construction\1606 Change Orders\CO-1 Working Days\2016-0210 CO-i Work Days.doc�DCad ---� �� KEY - __..�_� 1 � B in S Sus d X Available Oa I Intemiiltant SROa.l�CJlV�T22ts iZfG D Dela C Com ete that Da 8622-112th St,E.•PUYAI.LUP,WA 98373•(233)770-3844 FAX(253)7J0-38A5 R Resume W Weather Date:?1812016 PROJECT:Mapiewood Creek Februre March SUB/ $ M T W TH F S 8 Y T W TH F 5 9 M T W TH F S 3 M T W TH F S 3 M T W TH F S 3 WORKACTN�TY CPMx SUPPIIER i 2 s a s s � e 9 i0 �� i2 i3 ia is ts n ie ie 20 2� 22 23 za 25 2e 2� ze zs � z s a 5 s NOTES Piace Curb&Outter X X Weather Permitting Strip Curb&dutter X X X ee�ru c�r�s a�ner x x x Trench Patch X X X X X X X X Weather Permittk�g AspheR drhding X Weather Permitting Asphalt OveAay X X Weather Pertnitting Cheh Ink Fence X X Landsca e Restoratbn X X Punchlis Corrections Finai Cieanu • X X X X X 'Revisbn by Cily. Added 5 days for Punchlst,Cieanup N:\ix.svslcwr.swe.n w««rroJ«u\swr-n-swr,c.w.i«nol�fa�l\i�-xi7 n•a�.weoa u..k e..x�s�enn sYu.m lmwer.mMeslieoo cenx�.m�Uso�sdue�zoik-oxio a.riaw sa.dw.-n.vhwooa-ouer,u..iam