HomeMy WebLinkAboutCO 1 ' CAG-15-148, CO #1-16
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG-15-148 Maplewood Creek Stormwater Outfall Improvements Project C.O.# 1
SW P-27-3617
CONTRACTOR: Olson Bros. Excavating, tnc.
SUMMARY OF PROPOSED CHANGE:
Working Days Extension No Cost
Working days for the project were exceeded and stopped being counted in December 2015 and January 2016
due to the holidays and frequent rains that made some work impossible to perf'orm.
This change order adds working days to complete the remaining work for the project,starting on February 8,
2016, per the attached schedule. Some work such as installing concrete curb and gutter and asphalt paving is
weather dependant. The City may grant Non-Working Days when appropriate.
There are no additional costs for this change order.
TOTAL CHANGE ORDER COST= $0.00
Additional Working Days added to the Contract for this Change Order: 20 .
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT
THIS ORDER TOTALAFTER CHANGE
Saaa,00s.00 Saaa,00s.00 So.00 5aaa,00s.00
SIGNATURES:
���-��` — �� -� 12/15/16
Contractor: Date:
Project Engineer: � � Date: 2 "1 p'�6
Approved By: Date: �
rn�ey syrt. n��.�.)
Approved By: Date: �� �
/ Ik orksAdministotor�
\\RVFPS-02\Depts\PW\Fle Sys\5WP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\2736Z7 Maplewood Creek Basin Storm System
Improvements\1600 Construction\1606 Change Orders\CO-1 Working Days\2016-0210 CO-i Work Days.doc�DCad
---�
�� KEY
-
__..�_�
1 � B in S Sus d
X Available Oa I Intemiiltant
SROa.l�CJlV�T22ts iZfG D Dela C Com ete that Da
8622-112th St,E.•PUYAI.LUP,WA 98373•(233)770-3844 FAX(253)7J0-38A5 R Resume W Weather
Date:?1812016
PROJECT:Mapiewood Creek
Februre March
SUB/ $ M T W TH F S 8 Y T W TH F 5 9 M T W TH F S 3 M T W TH F S 3 M T W TH F S 3
WORKACTN�TY CPMx SUPPIIER i 2 s a s s � e 9 i0 �� i2 i3 ia is ts n ie ie 20 2� 22 23 za 25 2e 2� ze zs � z s a 5 s NOTES
Piace Curb&Outter X X Weather Permitting
Strip Curb&dutter X X X
ee�ru c�r�s a�ner x x x
Trench Patch X X X X X X X X Weather Permittk�g
AspheR drhding X Weather Permitting
Asphalt OveAay X X Weather Pertnitting
Cheh Ink Fence X X
Landsca e Restoratbn X X
Punchlis Corrections Finai Cieanu • X X X X X
'Revisbn by Cily. Added 5 days for Punchlst,Cieanup
N:\ix.svslcwr.swe.n w««rroJ«u\swr-n-swr,c.w.i«nol�fa�l\i�-xi7 n•a�.weoa u..k e..x�s�enn sYu.m lmwer.mMeslieoo cenx�.m�Uso�sdue�zoik-oxio a.riaw sa.dw.-n.vhwooa-ouer,u..iam