Loading...
HomeMy WebLinkAboutMFP23002727.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23002727 IVR Number: 23002727 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:05/23/2023Application Date:3345700220Parcel Number: 1825 NE 38TH ST Permit Type:06/26/2023Issue Date:Franchise Permit Work Class:06/25/2024Expiration Date:Minor Utility Job Number: 105096584Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO WORK IN TWO LOCATIONS. LOCATION 1: TRUCK TO PARK IN ROW AT EXISTING J01 (319457 130419). LOCATION 2: TRUCK TO PARK IN ROW ON LINCOLN AVE NE TO INSTALL 3 SERVICES AT EXISTING V01 (319451 166417). NO HS CUTS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105096584 1825 NE 38TH ST RANDY BLACKIE RANDY.BLACKIE@PSE.COM MFP23002727 Scott Warlick CED 6/26/2023 Monday - Friday 8:00AM - 3:00PM Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG J01 V01 NE 36TH ST LINCOLN CT NE NE 38TH ST LINCOLN AVE NELINCOLN AVE NELINCOLN AVE NELINCOLN AVE NE1616 16161010 991313 1414 1010STOP FLAGGER W20-7A100'ROAD WORKAHEAD W20-1W20-7A100'ROADWORKAHEADW20-1PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 01/25/2023 510548340 1 1825 NE 38th St, Renton. Flaviana Nunes 425-424-7386 Flaviana.rodriguesnunes@pse.com 1 OF 2 Puget Sound Energy Traffic Control Supervisor:Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP VAULTVault WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP23002727 J01 V01 NE 36TH ST LINCOLN CT NE NE 38TH ST LINCOLN AVE NELINCOLN AVE NELINCOLN AVE NELINCOLN AVE NE1616 16161010 991313 1414 1010STOP FLAGGER W20-7A STOP FLAGGER STOP FLAGGER STOP FLAGGER W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4X'X'X'USE MAXIMUM AVAILABLE SPACE FOR SIGNS W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROAD WORK AHEAD W20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1100'ROADWORKAHEADW20-1PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 01/25/2023 510548340 1 1825 NE 38th St, Renton. Flaviana Nunes 425-424-7386 Flaviana.rodriguesnunes@pse.com 2 OF 2 Puget Sound Energy Traffic Control Supervisor:Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP VAULTVault WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP23002727 N Vicinity Map 47.5252, -122.1937 Owner / Developer Contact Info officeATTN: GILL HOMES, LLC PO BOX 98468 DES MOINES, WA 98198 NAVDEEP S GILL 253.261.4455 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 510548340 105096584 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 510548341 107060457 N/A 106373694 N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA 10. 9. 8. 7. 6. 5. 4. 3. 2. 1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT 105096584107060457DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 2.8.21 S. JOHNSON 425.375.4185 2.8.21 S. JOHNSON 425.375.4185 2.8.21 S. JOHNSON .2.8.21 REDT # (RW-120836 )RENTON KP DEVELOPMENT 1Ø PRIMARY U/G LINE EXTENSION - 8 S/F LOTS 1825 NE 38TH ST, RENTON, WA 98056 PUGET SOUND ENERGY N/A IP 469-45 107060457 105096584 N/A 1 OF 2 KING 469E CIKNC QCSOKE 32NE-T24N-R05E 200.080 202.083 2405E125 2405E136 2405E125 HAZ-15 COMCAST TODD ZIMNY 360.507.0598 LUMEN TECH ALEX HARB 253.831.0395 RIGHT OF WAY FABIANA DODSON 425.456.2293 . . . 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:RANDY BLACKIE 425.457.2614 randy.blackie@pse.com x x x ... ... ... x NAVDEEPGILL@MSN.COM JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Gas 12" Min Horizontal Separation Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN SITE MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' VAULT DETAIL @ V01 & V02 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 TOP VIEW Excavation - 10-1/3 cubic yards SIDE VIEW Rock Crushed 6" 4'-4" 2" 8' 8' 4'-8" 3'-6" 4'-8" 6" VAULT DETAIL @ J01 H1A, H1B, H2A, H2B SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 J-BOX CABLE ENTRY DETAIL NOT TO SCALE Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW MFP23002727 NE 38TH ST Lincoln Ave NELincoln PL NEJOINT USE DRIVEWAY (ACCESS & UTILITY TRACT JOINT USE DRIVEWAY(ACCESS & UTILITY TRACTLOT 1 LOT 2 LOT 3LOT 6LOT 7LOT 8 LOT 5 LOT 4 FEEDHAZ 15 #4CUB#6CU#6CULINCOLN CT NE NE 38TH PL TYPICAL PSE EASEMENT STLT DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM V01 TO METER LOCATION FUSE @ 40T SW#TXXXXX 30' 25' B EXISTING 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 2.8.21 S. JOHNSON 425.375.4185 2.8.21 S. JOHNSON 425.375.4185 2.8.21 S. JOHNSON .2.8.21 REDT # (RW-120836 )RENTON KP DEVELOPMENT 1Ø PRIMARY U/G LINE EXTENSION - 8 S/F LOTS 1825 NE 38TH ST, RENTON, WA 98056 PUGET SOUND ENERGY N/A IP 469-45 107060457 105096584 1" = 50'2 OF 2 KING 469E CIKNC QCSOKE 32NE-T24N-R05E 200.080 202.083 2405E125 2405E136 2405E125 HAZ-15 COMCAST TODD ZIMNY 360.507.0598 LUMEN TECH ALEX HARB 253.831.0395 RIGHT OF WAY FABIANA DODSON 425.456.2293 . . . SITE PLAN ... ... ... SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: TBD 27 3,500 120 AMPS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) CONTRACTOR/OWNER TO COORDINATE WITH PSE ON EXCESSIVE GRADING ISSUES WITH PSE TRENCH ROUTE AND VAULT LOCATIONS DEVELOPER TO PROVIDE TYPICAL 10' PSE FRONTAGE EASEMENT FOR OPERATION AND MAINTENANCE OF PSE EQUIPMENT. EASEMENT TO BE CLEAR OF ALL BUILDING OVERHANGS AND FOUNDATION FOOTINGS Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Combustible walls using a reduced-flammability transformer. Gas service meter relief vent.3 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Generators, customer-owned transformers, fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and reduced flammability oil. 100 FT CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS -1 V01 1 1/ 0 STREET LIGHTS ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE DEDICATED FACILITIES SITE SPAN ADDITIONAL REMARKS LABOR UNITS #FROM TO FOOTAGE 2 V01 2 -UPGRADE 37.5KVA TO 50KVA 2 V02 6 -REDUCED FLAMMABILITY 3 V02 7 55 DED. CONDUIT & WIRE 2-36, 2-54A TOTAL FT=55 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 LOT 4 LOT 6 2 40 1 W 2 DB120 1 30 ( )'WCL GAS MAIN, PRIMARY X02 LOT 4 LOT 6 2 40 2 W 2 DB120 1 35 ( )'WCL GAS MAIN, PRIMARY X03 LOT 5 LOT 7 3 40 2 W 3 DB120 2 35 ( )'WCL GAS SVC, SECONDARY 2" PVC PLUG /CAPS = 6 2" YELLOW SCH 40 PVC = 95 FT 2" DB120 GREY PVC = 45 FT 2" PVC PLUG /CAPS = 4 4" PVC PLUG /CAPS = 0 4" YELLOW SCH 40 PVC = 95 FT 3" DB120 GREY PVC = 80 FT 3" PVC PLUG /CAPS = 4 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #ST. LIGHTS N/A N/A TBD N/A 1KW N/A 1.4 @ V01 1.3 @ V01 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HAZ-15 12.21.20 188 224 208 N/A 6 N/A 188 230 208 →SEE PSE HANDBOOKS← SEE 1218 (SF),1220 (MF), 6080, FOR TRENCH SEE 3061, 2809 Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 50kVA 0.5 2.34 26,700 AMPS 1.80 17,400 AMPS Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01 319451-166417 37.5kVA The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. GUARD POST INSTALLATION NOT TO SCALE 0700.1600-02 CONCRETE GUARD POST INSTALLATION MIN 6" PAINTED YELLOW MIN 2'-6" 6" 3'-6" 6'-0" LENGTH DEVELOPER NOTE: Developer to install bollards per this detail if transformers cannot be placed a minimum of 5' from drivable surfaces. GUARD POST LOCATIONS 10' MIN. REQUIRED ROAD OR PARKING AREA GUARD POSTS 5' MIN WORK SPACE 5' MAX 5' MAX 5' MAX 5' MIN 5' MIN CURB OR EDGE OF PAVEMENT CURB OR EDGEOF PAVEMENTPAD & FRONT GUARD XFMR 3' MIN TYPICAL MIN 18"18" MIN MIN 3' EX UNDERGROUND CIRCUIT MAP 2405E125 RESTORATION PER CITY OF RENTON STANDARDS MFP23002727 TYPICAL PSE EASEMENT STLT DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM V01 TO METER LOCATION EXISTING DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 2.8.21 S. JOHNSON 425.375.4185 2.8.21 S. JOHNSON 425.375.4185 2.8.21 S. JOHNSON .2.8.21 REDT # (RW-120836 )RENTON KP DEVELOPMENT 1Ø PRIMARY U/G LINE EXTENSION - 8 S/F LOTS 1825 NE 38TH ST, RENTON, WA 98056 PUGET SOUND ENERGY N/A IP 469-45 107060457 105096584 AS SHOWN 3 OF 3 KING 469E CIKNC QCSOKE 32NE-T24N-R05E 200.080 202.083 2405E125 2405E136 2405E125 HAZ-15 COMCAST TODD ZIMNY 360.507.0598 LUMEN TECH ALEX HARB 253.831.0395 RIGHT OF WAY FABIANA DODSON 425.456.2293 . . . ... ... ... EX OVERHEAD CIRCUIT MAP 2405E136 SCALE: 6" = 1 MILE NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE EX UNDERGROUND CIRCUIT MAP 2405E125 SCALE: NOT TO SCALE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit V01 LOT 1 350 75 3 65 2 1.4 1.5 V01 LOT 2 1/O 15 3 -1 2.3 2.4 V01 LOT 3 1/O 15 60 3 -1 2.2 3.3 V02 LOT 4 1/O 40 60 3 30 1 V02 LOT 5 1/O 40 60 3 30 1 2.0 2.9 V02 LOT 6 1/O 15 60 3 -1 2.0 2.8 V02 LOT 7 1/O 65 60 3 55 -2.3 3.3 V02 LOT 8 1/O 65 60 3 55 - 1/O UG Triplex (ft) =330 2" PVC & BENDS (ft)=0 0 0 0 0 0 4/O UG Triplex (ft) =0 3" PVC & BENDS (ft)=235 7 0 0 0 3.1 350 UG Triplex (ft) =0 TOTAL QTS OF GLUE 3.1 VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED EXISTING V01 312686 164612 42"X48"X38" UNISTRUT HH MATID: 7663001 37.5KVA RF MP 120/240 MATID: 9995528 2 - MINU1SR 6045.1010 BØ V02 312710 164625 42"X48"X38" UNISTRUT HH MATID: 7663001 37.5KVA RF MP 120/240 MATID: 9995528 1 1 MINU1SR 6045.1010 BØ Existing J01 312710 164625 42X48X38 UNISTRUT HH MATID: 7663001 COVER: 7662550 1PH J-BOX PM W/4 POS J-BUS MATID: 7662402 3 - JBE151 6055.1010 XØ CAP (7630600) PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL J01 V02 2 1 95 1 ---134 177 1/0 AL JKT 120 --EHT598 -1.6 2" PVC (FT) & BENDS =95 1 1 4 0 1/0 AL JKT TOTAL (FT) =120 TTL (GAL.) =3.1 NOT TO SCALE NEW CONDUIT DIAGRAM SITE NEW 1/O AL XXXXXX-BØ SECONDARY 2" SECONDARY 3" PRIMARY 2" CONDUIT LEGEND SITE MFP23002727 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 2.8.21 S. JOHNSON 425.375.4185 2.8.21 S. JOHNSON 425.375.4185 2.8.21 S. JOHNSON .2.8.21 REDT # (RW-120836 )RENTON KP DEVELOPMENT 1Ø PRIMARY U/G LINE EXTENSION - 8 S/F LOTS 1825 NE 38TH ST, RENTON, WA 98056 PUGET SOUND ENERGY N/A IP 469-45 107060457 105096584 AS SHOWN 4 OF 4 KING 469E CIKNC QCSOKE 32NE-T24N-R05E 200.080 202.083 2405E125 2405E136 2405E125 HAZ-15 COMCAST TODD ZIMNY 360.507.0598 LUMEN TECH ALEX HARB 253.831.0395 RIGHT OF WAY FABIANA DODSON 425.456.2293 . . . ... ... ... 1. 2. 3. 4. 5. ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD 6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL". ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE POLE. BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN 6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.) APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE REQUIRED. THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC (NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO AID IN THE INSTALLATION OF THE STREET LIGHTING POLES. THE DEVELOPER MUST ALSO SUPPLY THE REQUIRED 5/8" MINUS GRAVEL AT EACH STREET LIGHT LOCATION. IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE MUST BE LEVELED. DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET LIGHT TUBE. 6. NOT TO SCALE STREET LIGHT TUBE DETAIL Plan View Detail of Street Light Tube Wire Entrance Slot Street Light Tube Field Side Road Side Wire Entrance Slot 45° 45° Position 3" x 6" wire entrance slot 45 degrees left or right from a line perpendicular to road- way through center of tube. Field Side 3" x 6" Wire Entrance Slot 45° 45° Street light tube set 2" below grade. Road Side 18" - 24" Minimum Depending on Pole Type 5'-0" 20"26" CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) STREET LIGHT TABLE (BY INTOLIGHT) SITE # STATION OFFSET POLE LUMINAIRE TUBE WO # (INTOLIGHT) BILLING SCH.GRID #INTOLIGHT TAG #TYPE ARM MTG HT.WATTS STYLE TUBE LENGTH TUBE DIAMETER SL1 -XXXXX XXXXX ---------- SL2 -XXXXX XXXXX ---------- SL3 -XXXXX XXXXX ---------- SL4 -XXXXX XXXXX ---------- STREET LIGHT CIRCUITRY TABLE - 105X SITE #FROM CABLE INFO AS-BUILT REMARKSTYPELFTYPELENGTH FL1 -#6 CIC -- BY INTOLIGHT FL2 -#6 CIC -- BY INTOLIGHT SL1 -#6 CIC - SL2 -#6 CIC - SL3 -#6 CIC - SL4 -#6 CIC - TOTAL FT =###TOTAL FT = SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit V01 LOT 1 4/O 70 55 3 70 2 1 --1.9 3.5 V01 LOT 2 4/O 15 55 3 15 1 1 --1.9 3.1 V01 LOT 3 4/O 15 55 3 15 1 1 --2.4 3.1 V02 LOT 4 1/O 40 55 3 10 2 ---2.2 3.3 V02 LOT 5 1/O 45 55 3 15 2 ---2.4 3.3 V02 LOT 6 1/O 15 55 3 15 1 ---2.2 3.1 V02 LOT 7 1/O 70 55 3 70 1 ---2.5 3.6 V02 LOT 8 4/O 75 55 3 75 1 ---2.5 3.7 1/O UG Triplex (ft) =-2" PVC & BENDS (ft)=-0 0 0 0 0.1 4/O UG Triplex (ft) =-3" PVC & BENDS (ft)=-11 3 0 0 0.1 350 UG Triplex (ft) =-TOTAL QTS OF GLUE 0.2 MFP23002727