HomeMy WebLinkAboutCO 7 Revised CAG-15-025, CO #7-16 (REV) CITY OF RENTON Community Services Department CONTRACT CHANGE ORDER AGREEMENT s/xs/zois CONTRACT: City ot Renton CAG-15-025 CONTRACTOR: Rodarte Construction,Inc. CHANGE ORDER: No.7-Revised SUMMARY OF PROPOSED CHANGE: Reason/Justification: 1. Provide outlet box/cover on meter base,per Ciry inspector Contract Change: 1. Install outlet box/cover on meter base DESCRIPTION: Item Qty. Description Unit Price Amount No. w/WSST 1 1 Install outlet box/cover on meter base $ 934.90 $ 1,023.72 Total this Change Order: $ 1,023.72 ORIGINAL CONTRACT CURRENT CONTRAR NET CHANGE REVISEO CONTRACT AMOUNT(W/W55T) AMOUNT THIS ORDER(W/WSST) TOTAL AFTER CHANGE $ 759,628.88 $780,233.30 $ 1,023.72 $ 781,257.U2 Additional Calendar Days: 0 Working Days The payment specified and agreed to in this change order includes every ciaim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. SIGNATURES: Contrador: Date: 7/7'Z�� b Projed Manager: 4 ��-� Date �' �"� �l(� Ap roved By: �ate: �( ���/� P }v ( mu�iry5 'cesAdminishator)