HomeMy WebLinkAboutCO 7 CAG-15-025, CO #7-16 CiTY OF RENTON Community Servfces Department CONTRACT CHANGE ORDER AGREEMENT s/�o/xaie [ON7RACT: CityafRenton CAG-15-025 CON7RAGTOR: Rodarte Construction,Inc. CHANGE ORDER: No.7 5UMMARY QF PitOPOSED CHANGE: ReasonJlustiftcallon: 1. Prov,de outlet 6ox/cover on meter base,per City inspector Contratt Chan�e: f. Instal;outlet bax/cover an meter base dESCRtP710N: ltem � Qty. E Descr�ptian � Unit Price Amount rv�. f � . I w/wssr 1 1 �Install outlet boxitover on meter base �$ 1,023.72 �$ I,120.97 �� � � Total thts Change Order.�$ 1,120.97� ORtGIhdAICONTRACT CURREMC4MRACT HETCHANGE REVfSE0C0lVTRACf AMOUNT{W/WSST� I AMOUNT � THIS QRDER(Wf WSS7) TOTALAFTER CHANf�E $ 754.fi28.88 $780,233.30 $ 1,12Q.9T $ 781.354.27 Additional Calendar Days: 0 Working Days The pa�rnent specifled and agreed ta in this change order(nciudes every clatm by the contrador for any - extra payment with respect to the work destribed tn this change order. The work covered by thls change order rn�:5t be performed under the same terms and conditlons as that included in the orlginal agreement. All oP th,_other terms of the original agreement rem ect. SIGNATUAE5: Contraaor. ��� Date: �� � � ��! � - Project P�lanajer: /� c����7��/,��' 1-�` D�te ���(•�(P l �' Apgrova:d By: ��C������� Date: �����/✓ � I��r SerJlKs AamMht�aeorl RODARTE �ONSTRUCTlON, iNC. P.O. BOX 1875 AUBURN,WA 9$071-i875 ph 253-939-0532 fax 253-939•0557 Change Order ��,������� �� � � � ������������, ����� , � pR�POSAL „'� PG 9 Customer Name Todd Black Date 5��oi2o�s GompBny City of Renton Job Name: Riverview Park Bridge Address 1055 South Grady Way,Renton StBte WA Zlp 98057 Phone A25 430-65?'1 Fax We hereby submit speci6cations and esbmates for the following items ITEM, Descriptitin IQuanlity �Unii �UNIT PRICE I AMOUNi I 1 � I 1 � 1 � Install outlet bax and caver on meter base � 1 � LS � $ 834.73� $ 834.73 � 2 � General Coniractor Markup at 12°h � 1 i LS � $100.17 � $ 'i00.17 � 3 � WSST at 9.5°!0 � 1 � LS � $ 88.82 � $ 88.82 4 � 1 � 1 � TOTAI $ 1,023.72 NOTES: See attached break down(1 page) TRANSPORTATION SYSTEMS, Inc CHANGEREQUEST PROJECT NAME :Riverview Park-Renton,WA TRANSPORTATION SYSTEMS #:W75-021 REQUEST FOR CHANGE :002 DATE: 4/25/2016 RFP#: 2 instali Outiet required by City of Renton Electncai Inspector UNIT DESCRIPTION LABOR MATERIAL EQUIPMENT SUBCONTRACTOR UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL 1 Recipticle Outiet 4.00 4 $ $ - $ $ - 1 Outlet Box and Cover 2.00 2 $ 50.00 $ 50.00 $ $ 0 $ - $ 0 $ - $ 0 $ - 0 $ $ $ 0 $ - $ $ - $ 0 $ - $ $ $ 0 $ $ $ - $ 0 $ - 0 $ $ 0 $ $ 0 $ 4 Service Truck 0.02 0.08 $ - $ 33.00 $ 132.00 $ $ 0 $ $ $ - $ 0 $ $ $ 0 $ $ $ $ 6.08 $ 50.00 $ 732.00 $ - HOURS MULTIPLIED BY BURDENED RATE 378.35 $476.37 MARK UP APPLIED TO LABOR 29.00°/ 5138.15 'This proposal is based solely on the usual cost elements such as labor,material and normal markups and tices not include any amount for changes in the sequence TOTAL MATERIAL $50.00 of work,delays,disruptions,rescheduling,eutended overhead,acceleration and/or Material Tax 0.00% $0.00 impact costs,and the nght is expressly reserved to make claim for any antl all of these MARK UP APPLIED TO MATERIAL&TAX 21.00% $10.50 related items ot cost prior to any final settlement of this contract. TOTAL EQUIPMENT $132.00 MARK UP APPLIED TO EQUIPMENT 21.00% $27.72 TOTAL SUBCONTRACTOR $0.00 MARK UP APPLIED TO SUBCONTRACTOR 21.00% 50.00 SUB TOTAL $834.73 TOTAL OF CHANGE REQUEST $834.73