HomeMy WebLinkAboutCO 7 CAG-15-025, CO #7-16
CiTY OF RENTON
Community Servfces Department
CONTRACT CHANGE ORDER AGREEMENT
s/�o/xaie
[ON7RACT: CityafRenton
CAG-15-025
CON7RAGTOR: Rodarte Construction,Inc.
CHANGE ORDER: No.7
5UMMARY QF PitOPOSED CHANGE:
ReasonJlustiftcallon:
1. Prov,de outlet 6ox/cover on meter base,per City inspector
Contratt Chan�e:
f. Instal;outlet bax/cover an meter base
dESCRtP710N:
ltem � Qty. E Descr�ptian � Unit Price Amount
rv�. f � . I w/wssr
1 1 �Install outlet boxitover on meter base �$ 1,023.72 �$ I,120.97
�� � �
Total thts Change Order.�$ 1,120.97�
ORtGIhdAICONTRACT CURREMC4MRACT HETCHANGE REVfSE0C0lVTRACf
AMOUNT{W/WSST� I AMOUNT � THIS QRDER(Wf WSS7) TOTALAFTER CHANf�E
$ 754.fi28.88 $780,233.30 $ 1,12Q.9T $ 781.354.27
Additional Calendar Days:
0 Working Days
The pa�rnent specifled and agreed ta in this change order(nciudes every clatm by the contrador for any
- extra payment with respect to the work destribed tn this change order. The work covered by thls change
order rn�:5t be performed under the same terms and conditlons as that included in the orlginal agreement.
All oP th,_other terms of the original agreement rem ect.
SIGNATUAE5:
Contraaor. ��� Date: �� � � ��!
� -
Project P�lanajer: /� c����7��/,��' 1-�` D�te ���(•�(P
l �'
Apgrova:d By: ��C������� Date: �����/✓
� I��r SerJlKs AamMht�aeorl
RODARTE �ONSTRUCTlON, iNC.
P.O. BOX 1875
AUBURN,WA 9$071-i875
ph 253-939-0532 fax 253-939•0557 Change Order
��,������� �� � � � ������������, ����� , � pR�POSAL „'�
PG 9
Customer
Name Todd Black Date 5��oi2o�s
GompBny City of Renton Job Name: Riverview Park Bridge
Address 1055 South Grady Way,Renton StBte WA Zlp 98057
Phone A25 430-65?'1 Fax
We hereby submit speci6cations and esbmates for the following items
ITEM, Descriptitin IQuanlity �Unii �UNIT PRICE I AMOUNi
I 1 � I 1
� 1 � Install outlet bax and caver on meter base � 1 � LS � $ 834.73� $ 834.73
� 2 � General Coniractor Markup at 12°h � 1 i LS � $100.17 � $ 'i00.17
� 3 � WSST at 9.5°!0 � 1 � LS � $ 88.82 � $ 88.82
4 � 1 � 1 �
TOTAI $ 1,023.72
NOTES:
See attached break down(1 page)
TRANSPORTATION SYSTEMS, Inc
CHANGEREQUEST
PROJECT NAME :Riverview Park-Renton,WA
TRANSPORTATION SYSTEMS #:W75-021
REQUEST FOR CHANGE :002
DATE: 4/25/2016
RFP#: 2
instali Outiet required by City of Renton Electncai Inspector
UNIT DESCRIPTION LABOR MATERIAL EQUIPMENT SUBCONTRACTOR
UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
1 Recipticle Outiet 4.00 4 $ $ - $ $ -
1 Outlet Box and Cover 2.00 2 $ 50.00 $ 50.00 $ $
0 $ - $
0 $ - $
0 $ -
0 $ $ $
0 $ - $ $ - $
0 $ - $ $ $
0 $ $ $ - $
0 $ -
0 $ $
0 $ $
0 $
4 Service Truck 0.02 0.08 $ - $ 33.00 $ 132.00 $ $
0 $ $ $ - $
0 $ $ $
0 $ $ $ $
6.08 $ 50.00 $ 732.00 $ -
HOURS MULTIPLIED BY BURDENED RATE 378.35 $476.37
MARK UP APPLIED TO LABOR 29.00°/ 5138.15
'This proposal is based solely on the usual cost elements such as labor,material
and normal markups and tices not include any amount for changes in the sequence
TOTAL MATERIAL $50.00 of work,delays,disruptions,rescheduling,eutended overhead,acceleration and/or
Material Tax 0.00% $0.00 impact costs,and the nght is expressly reserved to make claim for any antl all of these
MARK UP APPLIED TO MATERIAL&TAX 21.00% $10.50 related items ot cost prior to any final settlement of this contract.
TOTAL EQUIPMENT $132.00
MARK UP APPLIED TO EQUIPMENT 21.00% $27.72
TOTAL SUBCONTRACTOR $0.00
MARK UP APPLIED TO SUBCONTRACTOR 21.00% 50.00
SUB TOTAL $834.73
TOTAL OF CHANGE REQUEST $834.73