Loading...
HomeMy WebLinkAboutCO 6 CAG-15-025, CO #6-16 C1TY OF RENTC?N Community Services Departmeni CONTRACT CHAIYGE ORDER AGREEMENT i/zst:o�5 CONTRALT: Cily of Rentan CAG-15-025 CONTRAC'FOR: Rodarte Constructian,Inc. CHANGE pRpER: No.6 SUNEMARY OF PRQPi?SED tHANGE: ReasonJJustification: 1. Pravide pawer fram pedestai to heat trace wire Coniract Change: 1. Connect heat tape wire ta elecirical pedestai power DEStRIPT14N: Item � Qty. �Description � Unit Price ( Amaunt I No. E � � � w/WSST � � 1 � 1 (Connect heat tape wire to electrical pedestal power) $ 3,947,55 � $ A,322.68� � � � _ � � Tatal this Change Qrder:�$ 4,322�68� ORIGINAL CONTRAC7 CURiiENT CONTitACT N£T CHANGE REVtSED CONTRACf AMOIlNT(W/WSSTJ AMOUNT THIS OHDER(W/W55T} 70TA!AFfEH tHANGE $ T59,628_88 $775,910.62 $ 4.322.68 $ J8Q,233.30 Additionai Catendar days: 4 Working Days The payment spetifiet!antf agreed to in this change arder'tnciudes every ciaim by the tontractar fior any extre payment with respect t�the work descrihed in this change arder. The wark covered by this thange order must be performed under the same terms artd condi[ions as that included in the original a�reement. All af the other kerms of tE�e ariginal agreement remain in effect. SIGNATURES: �^�..-•—' Contractor: / `'""'^�--^" Date: ,�2 �,/ �"O�� Rroject Manager: /� G� Date (� � �`Q . v � ApprovedBy. �\� L f7ate: �/0�7 � i r9 � — ICoTr+unty Scrviccs ndm^+�ciratrr} . � R4DARTE CONSTRUCTION, INC. P.O.80X 1875 AUBURN,WA 98071-1875 ph 253-939-0532 fax 253-939-4557 Ghange Order PRoposac PG 1 i— Customer � � ♦ Name Tadd 81ack Daie u�s�zo�s Company Ciry of Renton Job Name: Riverview Park Bridge Address 1Q55 South Grady Way,Renlon St8t2 WA Zip 98057 ` Phane 425 430-&571 Fax � � � We hereby subm�l specficatians and estimafas for the fo�lowing items. ITEM, Description IQuantity �Unit �UNIT PRICE � AMOUNT 1 I I 1 1 � 1 { Electrical Con�ection for Pipe Heat Trace � 1 � LS � $ 3,524.69 {5 3,524.69 � 2 � general contractor mark up at 12% � 1 � LS � $422.96� S 422•96 � 3 � tax @9.5% � 1 � LS �$ 375.03 � $ 375.03 4 � � � ( � TOTAL $ 4,322.68 NOTES: Please see Transportation 5ystems attached quote. TRANSPORTATION SYSTEMS, Inc CHANGE RE�UEST PROJECTNAME :RiverviewPark-Renton,WA TRAN5PORTATION SYSTEMS#:W15-021 REQUEST FOR CHANGE :007 DATE: 111 812 01 6 RfP#: 1 In>tall Plrma Jun,hon Box for the In�?allation oi Heat Tracer under the Eridg� UNIT DESCRIPTION LABOR MATERIAL� EQUIPMENT���� SUBCONTRACTOR � � �� �� ���� UNIT TOTAL �������UNIT TOTAL UNIT TOTAL UNIT TOTAL I 1 INema 4X Box I 4.001 41 E iJ54.34 I 8 1,154.34 I I$ - I 5 - I$ - � I 1 I Nema 4X Box for Hardwve I 2 D0� 21$ 232 23�$ 232 23� I$ - � �$ - I 1 I Wirinq for the Outlet to the Elecirical Service Panel I 2 501 2-SI $ 95 001 S 95 00 I � I I$ - � 1 �Heat Tape Connections I 1 00� 1� $ 45 00�$ 45 00 � � � �$ - � � 1 �Caddy hangers and clips � 1 00� 1 I $ 100.001$ 100.00 � � ( � � I � IBreaker � 0251 025� $ 12651$ 12fi5 I I$ - I I 5 I 2 12 7/2 inch bushings and bck washers I 0 251 0 51 $ 11.00�$ 22 00 I I S - I$ - I S - � I I I I 01 I$ - I IS - IS - I$ _ � I I I I ol Is - I Is - 15 - I$ I I I I oi I$ - I I I I I I I I ol 15 - 1 IS - I I I I I I ol is - i la - I i 1 I I I I ol 15 - I I I I � � 9 �ServiceTruck � 0.021 018� �$ - �$ 3300�$ 297.00�$ - �$ - 1 � � � 1 0� �$ - � �$ - �$ - �$ - � I I I I 01 I I IS - IS - I$ - � I I i I o� Ib - I �S - I$ - I$ - I I I I I 1 I I I I I � ttaa s ,,ss,.zs a zezoo s - HOURS MULTIPLIED BY BURDENED RATE E78.35 5895.54 MARK UP APPLIED TO LABOR 29.00% 5259.71 'This proposal is based solely on the usual cost elemenls such as labor,matenal and rwrmal markups and tloes not include any amount tor changes in t�e sequence TOTAL MATERIAL E1,661.22 of vrork,delays,disruptmns,reschetlwmg,extended overhead,acceleratlon and/or MateflBl Tax 0.00% 50.00 impacl costs,and[he nght is expressly reserved to make daim for any and all of these MARK UP APPLIED TO MATERIAL 8 TAX 2'I.00% $348.86 related rtems oi cost pnor m any nnai settlement of this contract TOTAL E�UIPMENT 5297.00 MARK UP APPLIED TO EQUIPMENT 21.00% 562.37 TOTAL SUBCONTRACTOR 50.00 MARK UP APPLIED TO SUBCONTRACTOR 21.00% 50.00 SUB TOTAI 53,524.69 TOTAL OF CHANGE REQUEST 53,524.69