Loading...
HomeMy WebLinkAboutCO 5 CAG-15-025, CO #5-15 CITY OF RENTON Community Services Oepartment C�NTRACT tHANGE ORdER A6REEMENT 11/23/2415 CONTRAGT: City af Renton CAG-15-D25 CONTRACTOR: Rodarte Construction,Inc. GHANGf ORDER: No.5 SUMMARY OF PROPOSED CHANGE: Reasan/Justification: 1. Oesign modification to bridge base plate 2. Design change to electricai connection ta transformer Contract thange: 1. Modity bridge base plate 2. Add electrical wire and conduit dESCRIPTION: Item � Qty. �Description � Un'rt Price � Amount No. I � � I w/WSST i � 1 lModify bridge base piate �5 655,00�5 7I8.32 � 2 � 1 �Add electrtcai wire and conduit �S - �S - � � � � � Totai this Change Order.�$ 71832� ORIGlNAL{OfJTRA[T NRRENT CONTRACT NET tHANGE R�VlSEp CONTRACT AMOUNT(W/WSST) AM4UN7 THIS ORDfR(Wf WSST) TOTAL AFTER CHANGE $ 759,fi28.88 $775,142.30 � $ 718.32 $ 775,910.62 � Additlonal Calendar Oays: 0 Working Days The payment specified and agreed to in this change order includes every claim by the contraciar for any extra payment with respect zo the work described in this change order. 'fhe work covered by this thange order mast be performed under the same terms a�d conditions as that intluded in the original agreement, All of the other terms of the original agreement remain in efiect. 51GNATURES: tontractor. l�� Date: � ',,� l��/�1 7 � . Project Manager: ��G� / t�� Date ( �` Z � "�5 � `�l ._ Approved By: r-� �---'— L Date: t`��U � `} (Commnnity Services Adm niStratorJ