HomeMy WebLinkAboutCO 5 CAG-15-025, CO #5-15
CITY OF RENTON
Community Services Oepartment
C�NTRACT tHANGE ORdER A6REEMENT
11/23/2415
CONTRAGT: City af Renton
CAG-15-D25
CONTRACTOR: Rodarte Construction,Inc.
GHANGf ORDER: No.5
SUMMARY OF PROPOSED CHANGE:
Reasan/Justification:
1. Oesign modification to bridge base plate
2. Design change to electricai connection ta transformer
Contract thange:
1. Modity bridge base plate
2. Add electrical wire and conduit
dESCRIPTION:
Item � Qty. �Description � Un'rt Price � Amount
No. I � � I w/WSST
i � 1 lModify bridge base piate �5 655,00�5 7I8.32
� 2 � 1 �Add electrtcai wire and conduit �S - �S -
� � � � �
Totai this Change Order.�$ 71832�
ORIGlNAL{OfJTRA[T NRRENT CONTRACT NET tHANGE R�VlSEp CONTRACT
AMOUNT(W/WSST) AM4UN7 THIS ORDfR(Wf WSST) TOTAL AFTER CHANGE
$ 759,fi28.88 $775,142.30 � $ 718.32 $ 775,910.62
�
Additlonal Calendar Oays:
0 Working Days
The payment specified and agreed to in this change order includes every claim by the contraciar for any
extra payment with respect zo the work described in this change order. 'fhe work covered by this thange
order mast be performed under the same terms a�d conditions as that intluded in the original agreement,
All of the other terms of the original agreement remain in efiect.
51GNATURES:
tontractor. l�� Date: � ',,� l��/�1 7
� .
Project Manager: ��G� / t�� Date ( �` Z � "�5
� `�l ._
Approved By: r-� �---'— L Date: t`��U � `}
(Commnnity Services Adm niStratorJ