HomeMy WebLinkAboutCO 4 �AG-15-025, CO #4-15
CITY OF RENTON
Community 5ervices Department
, CONTRACT CHANGE ORDER AGREEMENT'
ia13olYois
CONTRAGT: City r�f Rentan
CAG•15�025
CONTRACTOR: Radarte Canstruction,Inc.
CHANGE ORUEti: No.4
SUMMARY QF PROPOSED CHANGE:
Reason/J ustifi cation:
1. Owner request to defete sandblasting a�d add hand cleaning/finishing aF bridge
2. Contractor request to substitute 7x7 cabie for 1x19 cable for railing
Contract Change:
1. 5ubstitute hand cleaning/finishing of bridge at no cost
2. Tx7 Cable Substitution at reduced tost to tiri/
DESCRIPTI01+1:
I ltem f Qty. f description � Unit Frice � Amaunt
No. � � � � w/WSST
� i � 1 NHand cieanecf and finished aluminum �$ - � $ -
� z ! i ��z7 cable � 5 {sio.oa}i S (558.45)
I ! I ! �
Total this Change Order:�$ {558.A5})
ORIGINAL CONTitACT CURRENT[QNTRACT NET CHANGE REVISED CONTRAtT
AMOUNT{W/W55T} � AMOUNT I THi50HOfR,{W/WSST) I TUTALAPTERCHANGE
5 759,62$.$8 $775,T50.75 S (558.45J� $ 775,192.30
�
I
ARlditionaf Calendar Days:
0 Working Oays
The payment specified and agreed to in this change order intludes every claim by the contractor for any
extra payment with respett to the work described in this thange order. The work covered by this thange
order must be perfarmed under the same terms and conditions as that included in the originak agree�'nent.
All of the other terms of the orig(nal agreement remain in eRect.
SIGNATUR£5: -
Contraaar: �'1� Date: �� �!{/ t�
project Manager�j� � Date l „3
v -
� e �---''�' �V ��Q ���
Approved By; Qate:
� ;Ce*nm�nity ServKes Wroln�stratorj
� RODARTE C�NSTRUCTIQN, INC.
P.O.BOX 1875
AUBURN,WA 98071-1875
ph 253-939-Q832 f8x 253-939-0557 �#�an�,� prder
�Rd�'��A� �
' PG�
� Customer � � �
Name Leslie Betlach Date �azs�2ois
Company City ot Renton Jab Name: Rtverviow Park 8ridge
Address 1055 Soulh Grady Way,Renton StBt£WA Zip 98057
�
Phone 425 A34-6571 Fax � ` l
We hereby s�smit specificaiions and esiimates tar the lollowing items.
ITEMI Oescription ��uantity �Uni1 UNIT PRICE � AMOUNT
� 1 1 1 1
� � � delete sandblastinq and adtl hand cieaning and tinfshing af bridge � i � lS � $Q.00� $ -
� 2 ! creclit for using?x7 cable i�stead of 1 x19 cable for the railinq � 1 ' I.S � t�5 i OAO}� (�5 i 0.00}
� 3 � � ! I 1
41 � f I 1
TQTAL S (510•QO)
NOTES:
t page attached.Duoie from Bend Riggiag Supply to document the cost difference betwesn WR-il4x7x7SST316 cable and WR-
1/4x1 x19LRLT3i 6 cable
sales tax not
inciuded
BEND RIGGING SUPPLY, LLC
62930 BOYD ACRES ROAD DATE I QUOTE#
BEND,OREGON 97701
PHONE (541)318-8188 iois�2ois I ioos�
FAX (541)318- 1730 �
NAME/ADDRESS
NW DOCKS Q U OT E
JIM GUY
509 30TH STREET
Anacortes,WA 98221
REP PO NUMBER
AB
ITEM DESCRIPTION QTY COST TOTAL
WR-1/4X7X7SST316 114'STAINLESS STEEL 7 X 7 WIRE ROPE T316 5,100 0.615 3,136.50
WR-1/4X1X19LRLT316 1/4'X 1 X 19 LRL STAINLESS ST`EEL WIRE ROPE 5,100 0.715 3,646.50
T316
TOTAL $�.�g�.00