HomeMy WebLinkAboutCO 1 CAG-15-025 , CO #1-15
CITY OF RENTON
Community Services Department
CONTRACT CHANGE ORDER AGREEMENT
s124/201s
CONTRACT: City of Renton
CAG-15-025
CONTRACTOR: Rodarte Construction,Inc.
CHANGE ORDER: No.1
SUMMARY OF PROPOSED CHANGE:
Reason/Justification-
1.
eason/1ustification:1. Specified deck bridge grating needs to be heavier duty
Contract Change:
1. Install 1-3/4"thickness deck grating
DESCRIPTION:
Item Qty. Description Unit Price Amount
No. w/WSST
1 1 Install 1-3/4"thick aluminum deck grating $ 8,530.50 $ 9,340.90
Total this Change Order,1$ 9,340.90
ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT
AMOUNT(W/WSST) AMOUNT THIS ORDER(W/WSST) TOTAL AFTER CHANGE
$ 759,628.88 $ 759,628.88 $ 9,340.90 $ 768,969.78
Additional Calendar Days:
(0)Working Days
The payment specified and agreed to in this change order includes every claim by the contractor for any
extra payment with respect to the work described in this change order. The work covered by this change
order must be performed under the same terms and conditions as that included in the original agreement.
All of the other terms of the original agreement remain effect.
SIGNATURES: �)
Contractor: Date:
Project Manager: Date 2-4 +(S
Approved By: r✓ Date-
(community Services Administrator)
RODARTE CONSTRUCTION, INC.
P.Q. BOX 1875
AUBURN,WA 98071-1875
ph 253-939-0532 fax 253-939-0557 Change Order
PROPOSAL
PG 1
Customer
Name Todd Black Date 8,2412015
Company City of Renton Job Name: Riverview Park Bridge
Address 1055 South Grady Way.Renton State WA Zip 98057
Phone 425430-ss7a
Fax
We hereby submit specifications and estimates for the foil"Items:
ITEM Description Quantity Unit UNIT PRICE AMOUNT
1
Replace sed grati2g with i 3/4" tin 1 LS $ 7,050.00 $ 7,050.00
2 General Contractor Markup at 21% 1 LS $ 1,480.50 $ 1,480.50
3
4
TOTAL $ 8,530.50
NOTES.
Please see the attached 2 pages from Grating Pacific
►
► s
W�"QRXrINQ
PACIFIC `LC Toll Free
19411 661h Avenue S . Kent, WA 98032 . Fax 206.782.8833 800.243.3939
FAX 78MMMAL
Page 9 of 1
Date: June 29, 2015
To: Jim Guy @ Northwest Docks
From: Pat Frederickson
Grating Pacific—Kent, WA
Good Morning Jim,
It was good to see you yesterday and go over the different options for your
Riverview Park Bridge.
We quoted this particular job using,11 Spaced Aluminum Bar Grating (ADA
Compliant)with a 1" Depth which meets the loading for Pedestrian Traffic.
The cost for this option was$22,807.00
We were later informed that there would be minimal vehicular traffic on the Bridge
(not to exceed the weight of a%ton pickup truck). To achieve that loading we had
to increase the depth on the grating to 1 V.The cost for this option is$29,857.00
The difference is pricing is$7,050.00. If this is acceptable, please let us know and
we will proceed.
If there is any other information we can assist you with please let us know.
711ax lk Youl!
Pat Frederickson
www.gratingpaciflc.com Wr
Soo
E'O6RXrIN6 PACIFIC LLC Toll Free
19411— 66 Avenue S . Kent, WA 98032 a Fax 206.872.8833 800.243.3939
FAX 7R"SM/1TAL
Date: June 26,2015 Page 1 of 7
To: Jim Guy @ NW Docks
Phone: (206)372-4467
E Mail: nwdocksgmail.com
From: Pat Frederickson
Grating Pacific—Kent,WA
Re: Riverview Park Bridge Replacement
Aluminum Bar Grating Quotation
We would first like to thank you for requesting a quotation from us for Bar Grating.
We are pleased to offer the following quotation for your consideration:
Material: 11-SG1-4, 1 %"x%",Striated,Banded,Stainless Steel J Solt Assemblies,
Mill Finish, Meets NAAMM Standards for Vehicular Loading.
Informed that this bridge would receive very minimal usage with vehicles
and Is primarily used for pedestrian traffic.
• 1 Area @ 136'-4"x 8'-6"(span)
Total Price Delivered to NW Docks: $29,857.00
Lead Time: 4-5 Weeks
Material Weight: 6,415#
Notes: 1) State SaleslUse Taxes not included.
2) Delivery schedule based on current workload and inventory levels.
3) Materials, tolerances and fabrication per NAAMM standard
specifications.
4) Drawings for Approval would be provided.Please allow 5-7 Days for
Drawings.
5) Field measurements are not included.
6) Only materials listed above are included in our quotation.
7) Quotation is based on a single shipment of all materials.
8) Price will be held firm for acceptance of purchase order within 30 days
and release for fabrication with 60 days of the date of this quotation.
If you have any questions,or require additional information,please call.
Teti mk/Youl!
Pat Frederickson
t
www.gratingpacific.com - - . •