Loading...
HomeMy WebLinkAboutR-422943A PORTION OF THE NW 1/4 OF SECTION 19, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., KING COUNTY, WASHINGTON DocDSlgn Envelope ID: 3B1BMD3-TEOA-476C-AD03-4329FFEOCI08 SURFACE WATER STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT, THE APPLICANTOR OWNER, HEREBY REFERRED TO AS APPLICANT. MAW STRINE CUT IRRELEVANTH(,ITES IF NOT APPLICABLE TO THE PROJECT, HOWEVER, THE APPLHCANTT SHALLNNDT RENUMBER NOR EDTTTHE REMAINING NOTES_ IF ADDITIONAL NOTES ARE NEEDEDFOR SPECIFIC ASPECTS, THEY SHALLBE ADDED AFTER THE SURTAICE WATER STANDARD PLAN NOTES. 1 BEFORE ANYCONSTROCTION OR DEVELOPMENT ACTIVITY COXRS.A PREApDWSTRUCTIOM MEETINGSkAJA BE 141ELD AMONG THE CITY OF RENTON HEREBY REFERRED TD AS THE CRY. THE APPLICANT. AND THE APPLICANTS CONTRACTOR 2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE. AND FEDERAL PERMITS PRIOR TO CONSTRUCTION. 3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWUMI RENTON MUNACIPAL CODE 1RMCI, AND THE STAWMRO SPECIFICATIONS FUR ROAD. BRIDGE AND MUNICIPAL 0ONSTRu011bN PREPARED BY WSOOT AND THE AMEAICAH PUBLIC WORKSASSOCIATTON IAPWA]. IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT rb CORRECTANY ERROR, OMISSION. OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NC ADDITIONAL COST TO THE CITY, 4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOTCONNSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (EG. WATER, SEWER- GAS, ELECTRICAL. ETC.) PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE WNSTRUCTEDACCORDING TO THE APPROVED PLANS ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY. 5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. N. THE LOCATIONS OF ALL EIIISTUIG LITIUTIESSHOWN HEREON HAVE BEEN ESTAALISMEO BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROKIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT ANDTHE APPLICANTS CONTRACTOR TO INOEPENDENILY VERIFY THE ACCURACY OF ALL UTILITY LOCATICNS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER U71LITIES NOT $IHQWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. TIC APPLICANT $MALL RECORD ON THE AS -BUILT DRAwIHGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TDTHE APPROVED PUNS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF CONFLICTOUSTS. 7. VERTICAL DATUM SKNLI BE NAVD 08 AMC HORIZONTAL DATUM SHALL BE NAD B3 (WA STATE PLANE, NORTH). UNLESS OTHERWISE APPROVED BY THECITY. REFERENCE BENCFIMARK, DATUM. ANDEUE)'ATIONS SHALL BE NOTED ON THE PLANS. B. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 9S%MAxIMulm DAY DENSITY PER SECTION 2-W.N147D-COI AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPEO CATIONS. IN PERUSABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO LASE SMALL BE COMPACTED TO MORE THAN 92%OF MAXIMUM URY DENSITY. 9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUTSHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS. TO. ,ALL PIPE ANDSTRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TOTHE STARTOF CONSTRUCTION_ WHERE SHOW14ON THE PLANS OR WHERE DIPECTED BY THE CITY, THE EXISTING MANHOLES- CATCH BASINS. OR INLETS SHALL BE AO.AJSTED TO THE GRADE AS STAKED. 11 ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIORTO, OR IN CONJUKTIC"VM..ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY. 12. ALL PIPE ANDAPPURTENANCES WALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH TILE CURRENT $TATE OF WA$HINGTgN STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTICH_ THIS SHALL INCLUDE NECESSARY LEVFTINGOF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED DEDCING MATERIAL TO LNWORM GRADE 30 THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE. UNYIELDING BASE, ALL PIPE BEDDING AND BACKFILL GFL LL BE AS SHOWN ON THE CITY STANDARD PLAN 2NEWE 220,10, AND 22"0_ 13. STEEL PIPE MALL BE ALLLMINEED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR S INSIDE AND OUTSIDE. 1 ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED NTH DUCTILE IRON. BOLTLOCKOG UIDS PER THE CITY STANDARD PLAN 204..1 D, 23420, 204.30, 204.40, AND 2D4,60. STRUCTURES SHALL HAVE; • RECTANGULAR OR ROUND. SOLID LIDS WHEN NOT OOLLECTINO RUNOFF. AND OUTSICE OF THE ROADWAY • ROUND. SOLID LION WHEN NOTCULLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT ULTSIUE OF THE CURBJGUTTEH LINE. . ROUND, SOLID LIDS OISPLAYVNG THE CITY LOGO WHEN WITHIN THE PUBLIC MN fr-CIF-WAY OR IN AN EASEMENT TO THE CITY. PRIVArE STRUCTURE LIDS OUTSIDE PUBLIC RIC41T-OF-WAY AND CASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO. V, BUILLTN4ii$ AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4,1 EASEMENT WIDTHS AMDOVILOING SETBACKS LINES OF THE RE14TON 6WOM. 16. LIDS OF MANHOL>ESNCATCH BAMIN5 WITHIN PUBLIC RICW-QF-WAY SHALL NOT BE ADJUBTEC TO FINAL GRADE UNTIL AFTER PAVING, ALL MANHOLEJCATCH BASIN RIMS SMALL BE ADJUSTEO TO BE RUSH WITH FINAL FINISACD GRADES, UNLESS OTHER W IS€ SHOWN. 17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EOCE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH, UNLESS MHEMVIsE NdTEO, DRAWING CS not IL'• _ca-t I%l NI Admftk STD. PLM - 2671.00 PUBLIC WORKS SURFACE WATER STANDARD PLAN NMaTu�Oy' DEPARTMENT NOTES (1 OF 2) actin Pastucha8/13/2020 fajfi c. ;: u"Alk 18:48 DocuSlgn Envelope ID: 3B1B34D3-TEOA-476C-ADB3-4329FFEOCI08 SURFACE WATER STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALLDE INCORPORATED IN THE DRAINAGE PLAN SET.ALL THE NOTESON THE LISTMAY NOT PERTAIN TO EVERY PROJECT, THE, APPLICANT OR OWNER HEREBY REFERRED TO AS APPLICANT, MAY STMSE CUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT, HOWEVER, THE APPLICANT SHALLNDT RENLWBER NOR Mr -THE REMAINING NOTES. F ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE SURFACE WATER STANDARD PLAN NOTES. 18- ROD( FOR ERASION PROTECTION OF ROADSIDE DITCHES. WHERE REOIAIRED. SMALL BE Or SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS: • 4-5 INCH POCK 140-70%PASSING; • 2.4 INCNM ROC1:130.40% PASSING: AND • LESS THAN 24NCM ROCK N 10 - 2U% PASSING. 19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW COHTAOL FACILITY ON THE SITE. UNLESS APPROVED BY THE CITY. FOOTING DI SHALL NOT BE OOMINECTED TO ON -SITE IMPS, 20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A UEANOIJT TOPPED WITHA BOLT -LOCKING LID MkRKED'S70F[M' OR "DRAIN' SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION Of A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.09. 21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKW FOR LINE AND GRADE SY A SURVEYCR LECIENS601N WASHINGTON STATE. AND CUT SHEETS SHALL BE PROVIDED TO THE CRY PRIOR TO CONSTRUCTION_ 22- ALL NEV&Y.INSTALLED AND NEWLYACKABILITATEO (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 290.00. OGTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIORTO RECEIVING APPROVAL TO INSTALL PROJECT CURBS. GUTTERS ANWOR PAVIIII. 23. ALL STORM SYSTEMS AND CONNECTIONS TO EXIST1 NG MAINS SHALT BE TESTED 04 ACCORDANCE WITH SECTION 7-04.311) OF THE WSEOT STANDARD SPECIFICATIONS AND IN THE PRFSENOE OF A RFPRESENrATIVF OF THE CITY STORM DRAIN STUDS SHALL RE TESTED FOR ACCFPFANOE AT THE SAME TIME THE MAW. STORM IS TESTED. 24. FOR ALL DISTURBED PERVIOUS AREAS jCOMPACTED, GRADED. LANDSCAPED. ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOL EITHER STOCKPILE AND REDISTRIBUTE THE EIVSTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 2S4 00. 2n ISSUAWEOF THE BUILD MOOR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION A WOR LIABILITY CONNECTED WITH STCFUJWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION. 26. ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT.. FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SATINY OF THE PUBLIC AND TO PROTECT RTOPEnTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RFGHT-0E-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE ATRAFFICCUNTROL PLAN APPROVED BY THE CITY. ALL SECTIONSOF THE W$WT STANDARD SPECIFICATIONS 1.10 TEMPORARY TRAFFIC CONTROL SMALL APPLY. 27- PROJECTS LOCATED WITHIN THE CITYS AQUIFER PROTECTION AREA (APAI SHALL COMPLY WITH SPECIAL. REQUIREMENT MB OF THE RENTON SWDM AND AQUIFER PROTECTION REOULATIONO 4RMCA-5-Ml. M. PLACEMENT OF SURFACE APPURTENANCES (CATCH EASINLMANHOLE LIDS, CLEANOUTS. INLETS. ETC.) IN THE STREET TRAVEL LAME WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES. SIDEWALKS. AND CROWWALKS SHALL BE AVOIOEC WHENEVER POSSIBLE, ANY SURFACE APPURTENANCE PLACED IN A SICEIVALK CR CROSSWALK,%HALL OF FITTED WITH A NONSLIP OR NONSKED LID PER ADARPQUIREMENTS. 29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT. 30 MINIMUM CCVER OVER STORM CIRANA43E PIPE SHALL CONFORM TO TABLE 41.1A2 OF THE RENTON SWDM 31 CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SLRFACE HAS BEEN WETTED CONTINUCULISLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SMALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED CNTO THE PAVEMENT SURFACE ALL AT ONCE- IF ONLY A MINOR AMOUNT OF WAIER.PONDS OR RUNS OFF THE SURFACE. THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION, AT LEAST LINE TEST SHALL BE CONDUCTED PER 1,M6 SCUAAE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE„ THEN ANOTHER TEST PER ASTM C17D1 SHALL BE CONDUCTED. FOR LARGE AREAS 4E.G.. PARKING AREAS). TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST PERMEABLE PAVERS SHALL BE TESTED USING ASTM C77$1 UNI-MI RIHMW SE NUI ED, UKAWIILG. IS NOT II950ALE INI3I T0. PLAN - 26710 V*R]g� PUBLIC WORKS SURFACE WATER STANDARD PLAN W."Wo S W. DEPARTMENT NOTES (2 CALF 2) LVI=L�Awl'ctin PI,astL chk13/2020 mtopv °iAl6 • Call 811 two business days before you dig NO. REVISION STORM PIPE NOTES STORM DRAIN (SD) GRAVITY SYSTEM SHALL BE CONSTRUCTED OF THE FOLLOWING MATERIALS AND AS NOTED ON PLANS: 1. CORRUGATED POLYETHYLENE PIPE (CPEP) AND FITTINGS: SHALL BE DUAL WALL AND COMPLY WITH WSDOT 9-05.20 REQUIREMENTS. 2. POLYVINYL CHLORIDE PIPE (PVC) AND FITTINGS: SHALL BE SOLID WALL AND COMPLY WITH WSDOT 9-05.12 REQUIREMENTS. 3. STORM DRAINS SHALL BE INSTALLED PER CITY OF RENTON STD PLAN 220.10 AND STD PLAN 220.20. 4. GRAVITY STORMWATER SYSTEM SHALL BE LOW PRESSURE AIR TESTED IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 7-04.3(1)F. AT THE OWNER'S DISCRETION, PIT DRAINS, MANHOLES, VAULTS OR OTHER ANCILLARY PIPE SYSTEMS MAY BE HYDROSTATICALLY TESTING TO THE OWNER'S SATISFACTION (E.G. PLUG PIPES, FILL STRUCTURE TO SET ELEVATION WITH WATER, AND OBSERVE WATER LEVEL DEVIATION OVER A SET PERIOD OF TIME). I0:C9_\%IIXLlILl[QI 1. EXCAVATE TO ELEVATIONS, LINES AND GRADES INDICATED TO NOT MORE THAN 1/2-INCH ABOVE OR BELOW THAT REQUIRED. 2. SLOPE SIDES OF EXCAVATION AS INDICATED OR COMPLY WITH LOCAL CODES AND ORDINANCES HAVING JURISDICTION, WHICHEVER IS MORE STRINGENT. SHORE AND BRACE WHERE SLOPING IS NOT POSSIBLE BECAUSE OF SPACE RESTRICTIONS OR STABILITY OF MATERIAL EXCAVATED. 3. STOCKPILE SATISFACTORY EXCAVATED MATERIALS WHERE DIRECTED UNTIL REQUIRED FOR BACKFILL OR FILL. PLACE, GRADE AND SHAPE STOCKPILES FOR PROPER DRAINAGE. LOCATE AND RETAIN SOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS. 4. DISPOSE OF EXCESS SOIL AND UNSUITABLE SOIL MATERIAL OFF -SITE AS DIRECTED. SUBGRADE PREPARATION NOTES SUBGRADE BELOW PAVEMENT: SUBGRADE PREPARATION: ALL SOIL SUBGRADES SHOULD BE THOROUGHLY COMPACTED, THEN PROOF -ROLLED WITH A LOADED DUMP TRUCK OR HEAVY COMPACTOR. ANY LOCALIZED ZONES OF YIELDING SUBGRADE DISCLOSED DURING THIS PROOF -ROLLING OPERATION SHOULD BE OVER EXCAVATED TO A MAXIMUM DEPTH OF 12 INCHES AND REPLACED WITH A SUITABLE STRUCTURAL FILL MATERIAL. ALL STRUCTURAL FILL SHOULD BE COMPACTED ACCORDING TO THE GEOTECHNICAL ENGINEERING REPORT RECOMMENDATIONS GIVEN IN THE STRUCTURAL FILL SECTION. SPECIFICALLY, THE UPPER 2 FEET OF SOILS UNDERLYING PAVEMENT SECTION SHOULD BE COMPACTED TO AT LEAST 95 PERCENT MAXIMUM DRY DENSITY (BASED ON ASTM D-1557), AND ALL SOILS BELOW 2 FEET SHOULD BE COMPACTED TO AT LEAST 90 PERCENT. COMPACTION NOTES 1. CONTROL SOIL COMPACTION DURING CONSTRUCTION PROVIDING MINIMUM PERCENTAGE OF DENSITY SPECIFIED FOR EACH AREA CLASSIFICATION. PERCENTAGES ARE RELATED 9.48 TO MAXIMUM DRY DENSITY AS MEASURED IN CONFORMANCE WITH ASTM D 1557. 2. COMPACT TOP 12-INCHES OF SUBGRADE (24-INCHES UNDER PROPOSED DRIVING SURFACES) TO 95-PERCENT OF MAXIMUM DRY DENSITY UNDER PAVEMENTS AND GRAVEL SURFACING. 3. WHERE SUBGRADE OR LAYER OF SOIL MATERIAL MUST BE MOISTURE CONDITIONED BEFORE COMPACTION, UNIFORMLY APPLY WATER TO SURFACE OF SUBGRADE OR LAYER OF SOIL MATERIAL TO PREVENT FREE WATER APPEARING ON SURFACE DURING OR SUBSEQUENT TO COMPACTION OPERATIONS. REMOVE AND REPLACE, OR SCARIFY AND AIR DRY, SOIL MATERIAL THAT IS TOO WET TO PERMIT COMPACTION TO SPECIFIED DENSITY. SOIL MATERIAL THAT HAS BEEN REMOVED BECAUSE IT IS TOO WET TO PERMIT COMPACTION MAY BE STOCKPILED OR SPREAD AND ALLOWED TO DRY. ASSIST DRYING BY DISKING, HARROWING OR PULVERIZING UNTIL MOISTURE CONTENT IS REDUCED TO SATISFACTORY VALUE. SURVEYED: DESIGNED: DKM/RJJ DRAWN: KLK/DKM CHECKED: DCD APPROVED: DCD SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY GRADING AND DRAINAGE NOTES 1. PROVIDE 12" MINIMUM VERTICAL AND 7' (10' FROM WATER) MINIMUM HORIZONTAL CLEARANCE (OUTSIDE SURFACES) BETWEEN STORM DRAIN PIPES AND OTHER UTILITY PIPES AND CONDUITS. FOR VERTICAL SEPARATION SMALLER THAN 12" AT ANY CROSSINGS, ETHOFOAM PAD SHALL BE PROVIDED. 2. CONTRACTOR AND/OR SURVEYOR SHALL CALCULATE PIPE SLOPES BASED ON THE INVERT ELEVATIONS SHOWN ON THE PLANS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO FIELD STAKING AND CONSTRUCTION. 3. CONTRACTOR TO FIELD VERIFY HORIZONTAL LOCATION OF CATCH BASIN STRUCTURES WITH RESPECT TO CURBING/CONCRETE PADS PRIOR TO CATCH BASIN PLACEMENT. PARTIAL STAKING OF CURBS/PADS AT TIME OF CATCH BASIN STAKING MAY BE NECESSARY. 4. ALL STORM DRAINAGE PIPING SHALL BE GASKETED AND WATERTIGHT. 5. PIPE COVER FOR LINED POLYETHYLENE PIPE (CPEP) SHALL BE 2' MINIMUM. 6. PIPE COVER FOR POLYVINYL CHLORIDE PIPE (PVC) SHALL BE 3' MINIMUM. �1-AD C. O� of WAI � f r � _ T 46449 Q SS�nNAI �M. 6 1sitts&hill I CIVIL I STRUCTURAL I SURVEY 4815 CENTER STREET I TACOMA, WA. 98409 PHONE: (253) 474-9449 I FAX: (253) 474-0153 http://www.sittshill.com/ Project No.: 19480 Project Mgr.: DCD Proj. Engineer: DKM/RJJ Proj. Drafter: KLK/DKM R-422943 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING A018t&�' IL Wanders 05/08/2023 . %jl DATE: VERTICAL: HORIZONTAL: NAD 1983/1991 y NAVD • CITY 0F BROTHERTON CADILLAC - RENTON 3/1 � ' ! FlELDBOOK: RENTON PAGE: • DRAWING NO: DATUM Planning/Building/Public works Dept. GRADING AND STORM DRAINAGE NOTES C3.2C (PRIVATE AND PUBLIC) SHEET: 17 OF:39 lzt N T O O O I N N It '11 L0 N T O O O I N N Q ZD J LO ( It O O N N A, u