Loading...
HomeMy WebLinkAboutMFP23003259.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23003259 IVR Number: 23003259 Permit Information Permit Name: ISO-0665806 - 365 Smartshop Address/Location:06/20/2023Application Date:0850200000Parcel Number: 1217 SW 7TH ST Permit Type:07/05/2023Issue Date:Franchise Permit Work Class:07/04/2024Expiration Date:Minor Utility Job Number: ISO-0665806Franchise Type:Cable Description: From existing 444LA on SW 7th ST between Powell Ave SW and Naches Ave SW, trench west in grass then south in sidewalk and asphalt roadway across SW 7th ST . Install (1) 4" conduit with (3) 1 1/4" innerducts. Exit Right of way.Pull (1) 144ct micro fiber through existing conduit from MH on Powell to 444LA vault on SW 7th. Then through new conduit going to site. Splice fiber on Powell. Restore per City of Renton specifications. Contacts Name Address PhoneTypeBilling Stephen Neumann Fibe Solutions 604 W Meeker St., Suite 103 KENT, WA 98032 C: (425) 753-1916ApplicantX Scott Morrison Zayo B: (206) 832-4862 C: (253) 441-0653 Applicant Rick Powers Utiligi Communications LLC 111 Nyberg Rd SW Pacific, WA 98390 B: (253) 548-5936Contractor Business License Number: 50846Construction Contractor: UTILIL*808CO Frederick Luco Zayo Group B: (253) 686-3896 H: (253) 686-3896 C: (253) 686-3896 Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ZAYO - Billing 1805 29th St, 2050 Boulder, CO 80301 B: (253) 655-1100Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 3/18/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 3/18/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: ▪ Include map(s) showing the location of the project and work area. ▪ Be legible lettering and clear, contrasting, symbols of viewing or printing. ▪ Must indicate street names, and north arrow and scale. ▪ Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering ISO-0665806 - 365 Smartshop 1217 SW 7th ST Monday Friday 8:00am 3:00pm Utiligi LLC Rick Powers 253-548-5936 PO Box 1965 Sumner, WA. From existing 444LA on SW 7th ST between Powell Ave SW and Naches Ave SW, trench west in grass then south in sidewalk and asphalt roadway across SW 7th ST . Install (1) 4" conduit with (3) 1-1/4" innerducts. Exit Right of way. Pull (1) 144ct micro-fiber through existing conduit from MH on Powell to 444LA vault on SW 7th. Then through new conduit going to site. Splice fiber on Powell. X X 98390 MFP23003259 Scott Warlick CED 7/5/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 3/18/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: • Must have approved Traffic Control Plan (TCP) prior to commencing the work. • Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. • WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • All permit conditions shall be met. NOTES: • Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. • Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. • In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 3/18/2021 • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Stephen Neumann/Fibe Solutions / Auth. Agent 6/20/2023 TRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKCONTACT INFO:FIBE SOLUTIONSPROJECT MANAGERTERRY CROMWELL206.793.0637TYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMGENERAL NOTES:LONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RSIGN SPACING = X ALL SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.36" x 36"MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.L/3XXXUTILITYWORKAHEADW21-7SHOULDERWORKW21-5SHOULDERCLOSEDW20-301XXSHOULDERCLOSEDW20-301UTILITYWORKAHEADW21-7XX UTILITYWORKAHEADW21-7UTILITYWORKAHEADW21-7POWELL AVE SWPOWELL AVE SWSW 7TH STSW 7TH ST DRIVEWAYDRIVEWAY7007001000PARKINGNOFROMTONAME OF FIRM 000-0000PHONE (CONTACT #)TOW-AWAY AREAT-3936" x 24"SPEEDLIMIT30SPEEDLIMIT30before you digCallMFP23003259 SW 7TH STSW 7TH STTRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKCONTACT INFO:FIBE SOLUTIONSPROJECT MANAGERTERRY CROMWELL206.793.0637TYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMMINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.LONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RSIGN SPACING = X ALL SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.36" x 36"GENERAL NOTES:620DRIVEWAY620DRIVEWAYBL/3LXXXAHEADWORKROADW20-1AHEADCLOSEDRIGHT LANEW20-5RW4-2RWORKAREACLOSEDSIDEWALKR9-9CLOSEDSIDEWALKR9-9SW 7TH STSW 7TH STNACHES AVE SWPOWELL AVE SWPOWELL AVE SWCONTINUED PEDESTRIAN CONTROLCROSS HERESIDEWALK CLOSEDR9-11ALSIDEWALK CLOSEDCROSS HEREAHEADR9-11RXAHEADWORKROADW20-11217DRIVEWAY6201217SPEEDLIMIT30SPEEDLIMIT30before you digCallMFP23003259 SW 7TH STSW 7TH STTRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKCONTACT INFO:FIBE SOLUTIONSPROJECT MANAGERTERRY CROMWELL206.793.0637MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.LONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RSIGN SPACING = X ALL SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.36" x 36"GENERAL NOTES:620DRIVEWAYWORKAREABLXXXAHEADWORKROADW20-1AHEADCLOSEDLEFT LANEW20-5LW4-2LBLXXXAHEADWORKROADW20-1AHEADCLOSEDLEFT LANEW20-5LW4-2L620DRIVEWAYTYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PM1217DRIVEWAY6201217L/3L/3SPEEDLIMIT30SPEEDLIMIT30before you digCallMFP23003259 SW 7TH STSW 7TH STTRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKCONTACT INFO:FIBE SOLUTIONSPROJECT MANAGERTERRY CROMWELL206.793.0637MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.LONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RSIGN SPACING = X ALL SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.36" x 36"GENERAL NOTES:620DRIVEWAYWORKAREABLXXXAHEADWORKROADW20-1AHEADCLOSEDRIGHT LANEW20-5RW4-2LXAHEADWORKROADW20-1L/3620DRIVEWAYTYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMSW 7TH STSW 7TH STNACHES AVE SWPOWELL AVE SWPOWELL AVE SWCONTINUED PEDESTRIAN CONTROLCROSS HERESIDEWALK CLOSEDR9-11ALSIDEWALK CLOSEDCROSS HEREAHEADR9-11RCLOSEDSIDEWALKR9-9CLOSEDSIDEWALKR9-91217DRIVEWAY6201217SPEEDLIMIT30SPEEDLIMIT30before you digCallMFP23003259 ISO-0665806 365 SMARTSHOP1217 SW 7TH STRENTON, WA 98057 1 - COVER SHEET AND PROJECT LOCATION 2 - ZAYO GENERAL NOTES 3 - LINE TYPE AND SYMBOL LEGENDS 4 - STANDARD DETAILS 5 - PLAN VIEWS 6 - DETAILED PLAN VIEWPROJECT LOCATIONCONTACT PERSON:SHEET INDEX:CITY OF RENTONFibe SolutionsProject ManagerTerry Cromwell604 W Meeker St, Suite 103Kent, Washington 98032(Cell) 206.793.0637(Email) tcromwell@fibesolutions.comZayo GroupProject Manager - OSPFrederick Luco4905 Pacific Hwy E Suite #4Fife, WA 98424(Cell) 253.686.3896(Email) fredrick.luco@zayo.comPROJECT DESCRIPTIONMFP23003259 before you digCallMFP23003259 SYMBOL LEGENDBOREPITLINE TYPE LEGEND#R100 SCALE LINE TYPE LEGENDXXXXXXXX144CTSPLICEXXX'HATCH TYPES#POLE ATTACMENT BLOCK144CTbefore you digCallMFP23003259 before you digCallMFP23003259 144CT144CT144CT12341234SEE DETAILED UNDERGROUNDPLAN VIEW ON SHEET 6.before you digCallMFP23003259 BLACK RIVER SIGN123SPECIFIC NOTE:BMP KEY:SW 7TH ST620121723160" TRENCH144before you digCallMFP23003259RESTORATION PER CITY OF RENTON STANDARDSVactor truck will berequired for thework around citystreet trees.