Loading...
HomeMy WebLinkAboutBQWS update acceptance CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Thanks for completing the review and preparing the Bill of Sale. Please be advised the Sheri Murata, PE has accepted the redlined comments and the revised BQWS. We will be paying the invoice and returning the executed documents to you shortly. Thanks again for your help. Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov> Sent: Thursday, June 29, 2023 3:11 PM To: cliff sitedme.com <cliff@sitedme.com> Cc: Bob Wenzl <bob@tuscanywa.com>; Nathan Janders <NJanders@Rentonwa.gov>; Angelea Weihs <AWeihs@Rentonwa.gov>; Patrick Decaro <PDecaro@Rentonwa.gov>; Sheri H. Murata <SMurata@coredesigninc.com> Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Good afternoon Cliff, We have completed review of the bond quantity worksheet and there are several corrections needed. We have made the updates and prepared the Bill of Sale along with the updated maintenance bond amount, however, we need your confirmation that the revisions are acceptable. Please either confirm the updates are acceptable, or, receipt of the maintenance bond or Bill of Sale is assumed to mean acceptance. For reference attached are: “REDLINES – S_BQWS…” – This is the BQWS that was submit showing the redline comments “S_BQWS…” – This is the excel version of the BQWS that staff prepared which reflects the redline comments If you are accepting of the updates please provide the maintenance bond, maintenance and defect agreement, a signed/notarized copy of the attached bill of sale, and pay the attached invoice which represents the recording fees for the bill of sale (note there will be additional recording fee invoice as part of the final short plat). Copied here is the completion log updated per above: The following is a summary of the Civil Construction Permit Closeout and the Final Short Plat Application Recording Processes that are remaining. These two processes are separate, but they do work together. Proactive communication is essential in completing these processes in a timely manner. The items below must be completed prior to the final short plat recording. All requested documents can be emailed to me directly unless there are large items that will require an FTP upload link. Final Short Plat Application and Recording Process 1. Official Final Short Plat submittal with all required submittal requirements. Submit official final short plat application <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs .rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464230%26dbid%3D0%26repo%3DCityofRenton%26cr%3D1&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a 05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=ifWVp%2FbPerClbbFMw7k18DAVqVwmgz1%2BIyx3tAEoSSE%3 D&reserved=0> to the City using the link above. When the application has been deemed complete, the city will perform the official final short plat review. If all conditions of approval have been addressed along with the redline comments provided in the attached documents, the city will request hard copies of the documents to be delivered to the City for processing (see Item #3 below). See attached for redline comments made on the pre-submittal review of the documents. Done. 2. Civil Construction Permit Closeout. All items must be completed below, and the Civil Construction permit signed to record the final plat. Ongoing (see below). 3. Record Final Short Plat. Once the Civil Construction Permit is signed off and the official final short plat application has been submitted and approved, the City will send signed final short plat documents to King County for recording. Pending Civil closeout. 4. King County Recording and City Courier Fees. Pay invoice for King County recording fees and City Courier fee invoiced by the City. Note: The City will record the project’s legal documents electronically on the Applicant’s behalf. The City will provide you an invoice for the recording fees once the draft legal documents are far enough in review to determine the required fees to record the documents with King County (required information include type and total pages of each document). Invoices can be paid online by visiting the City’s Permit Portal <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Fpayinvoice&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b% 7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BUhgGIwO1LPtWRINJiLC WQDaNT4enx0TIQ%2BOZuTUkqM%3D&reserved=0> . Pending Civil Closeout. I will create the invoice once we have the Maintenance and Defect Agreement ready. Civil Construction Required Closeout Items/Process 1. Complete all utility, drainage, paving, grading, lighting, landscaping and street improvements for the projects, including offsite and onsite improvements, as required. Done. a. Record drawings have been received and the punch list inspection is underway. Note: the maintenance walk-thru period is 10 working days after the Inspector walk-thru. Done. b. Completion of all improvements includes all outstanding punchlist items as requested from the Construction Inspector and/or the City Maintenance Division. Done. c. All franchise, building, and electrical permits associated with civil construction permits shall receive final sign off from the City. Typical work include dry utilities, demolition, storm drainage vaults, street lighting, retaining walls, etc. Done. 2. Landscape Completion. When landscaping is complete and record drawings of the landscaping have been submitted, contact Angelea Weihs for landscaping inspection. Done. 3. Conditions of Approval. Ensure all project entitlement conditions of approval are completed (i.e. SEPA, Site Plan, Modifications, Permit, etc). Done. 4. Deferrals. A deferral permit must be issued for any items that will not be completed prior to recording. The deferral permit shall be issued before the final punchlist walk-throughs will commence. Typical deferral items include final lift of asphalt, raising and paving of manholes and catch basins, installation of survey monuments and striping/channelization of the roadway. Done. a. A completed Deferral Application <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8461913%26dbid%3D0%26repo%3DCityofRenton%2 6cr%3D1&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV 2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=xjaZZ4DsnghtDnhdYrDFnKHYTgd84hvw%2FtboR0JOIlA%3D&reserved=0> will need to be submitted for review by City staff. Once the deferral has been approved, a formal approval letter will be sent providing you with the required surety amount for the deferral (150% of the cost of the deferred items). Done. b. Deferral sureties must be secured with cash or check, with a completed Performance Assurance <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDo cView.aspx%3Fid%3D8464268%26dbid%3D0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7C Unknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=0OQBjmDDvyyEB9X%2F1AhKk3WR5NrX6mBR40bG%2BO84xlo%3D&reserved=0> , or Assignment of Funds <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464265%26dbid%3D0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Re ntonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3 D%7C3000%7C%7C%7C&sdata=nFbGQNiGbncXrd5FtlDBTtgwUgt%2B3j0ivtq96VD1iVY%3D&reserved=0> . Done. 5. Bond Quantity Worksheet. Submit an updated Bond Quantity Worksheet <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464266%2 6dbid%3D0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWI joiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=N5EPW0KigmkbfW9lwiPt6MQ75eeCmFZyn8S24K%2B%2B%2BK8%3D&reserved=0> with the final record drawings. The worksheet should reflect all final construction quantities and shall be submitted to the City as an excel file for review. Note: The City will verify the quantities against the record drawings and provide you with a Bill of Sale for your signature and will provide you with the Maintenance Surety Amount (see Item #6). BQWS requires updates, see attached for redlines along with staff prepared revision. Please confirm acceptance of staff prepared revision, or receipt of Bill of Sale implies acceptance. 6. Maintenance Surety/Maintenance and Defect Agreement. After the construction permit is signed off by the Inspector, a two year Maintenance Surety must be posted with the City for 20% of the value of the public improvements to be turned over to the City which is noted on the final page of the City approved project Bond Quantity Worksheet (see Item #5). The original Performance Bond will be released after the Maintenance Bond <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464271%26dbid%3D 0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=38Q7RIWW0Zm2tqbfFZSLCT8Z8KgMvP3vhiHor2HsEIc%3D&reserved=0> and Maintenance and Defect Agreement form <https://gcc02.safeli nks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464270%26dbid%3D0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a 2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=9ACF20U ad909emUU5oeWyKFSqEdoKwSgDi9PgmGKY6Y%3D&reserved=0> is accepted by the City and the Civil Construction Permit has been placed in “finaled-maintenance” status. Maintenance bond amount is $29,268.03 which is based on staff prepared BQWS due to redline comments. Please confirm acceptance of staff prepared revision is, or receipt of surety implies acceptance. Provide signed Maintenance and Defect Agreement form. 7. Special Inspection Report. Provide Special Inspection Reports from the Special Inspectors for the vault assuring that the structure is built in accordance with the approved plans. Provide. 8. Overtime Inspection. Ensure any outstanding invoices billed for overtime inspection by our inspection group are paid in full (if applicable). Note: Outstanding invoices can be paid online by visiting the City’s Permit Portal <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Fpayinvoice&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1 b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7 C&sdata=%2BUhgGIwO1LPtWRINJiLCWQDaNT4enx0TIQ%2BOZuTUkqM%3D&reserved=0> . N/A 9. King County Recording Fees. Pay invoice for King County recording fees invoiced by the City. Note: The City will record the project’s legal documents electronically on the Applicant’s behalf. The City will provide you an invoice for the recording fees once the draft legal documents are far enough in review to determine the required fees to record the documents with King County (required information include type and total pages of each document). Invoices can be paid online by visiting the City’s Permit Portal <https://gcc02.safelinks.protection.outlook.com/?u rl=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Fpayinvoice&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7 CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BUhgGIwO1LPtWRINJiLCWQDaNT4enx0TIQ%2BOZuTUkqM%3D&reserved=0> . Invoice is attached. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=vw85YvTuTp6%2Bd8Wd%2B7cinCdcSAPCCXzPI8PeOkQZWMc%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.renton wa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwM DAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=o0j3JgSZueGvGC8P0Vudt3DTbN7x2C65sQTAbIleVwU%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com> Sent: Thursday, June 29, 2023 6:04 AM To: Michael Sippo <MSippo@Rentonwa.gov> Cc: Bob Wenzl <bob@tuscanywa.com>; Nathan Janders <NJanders@Rentonwa.gov>; Angelea Weihs <AWeihs@Rentonwa.gov>; Patrick Decaro <PDecaro@Rentonwa.gov>; Sheri H. Murata <SMurata@coredesigninc.com> Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Is the final review of the worksheet complete? We are up against vacation schedules and really need that confirmation today so we can proceed or update the worksheet. Otherwise, we may run into further delays. The bond is ready to issue. Can you treat this as a priority so we can get it done by tomorrow? Thanks Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Wednesday, June 21, 2023 1:15 PM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> >; Nathan Janders <NJanders@Rentonwa.gov <mailto:NJanders@Rentonwa.gov> >; Angelea Weihs <AWeihs@Rentonwa.gov <mailto:AWeihs@Rentonwa.gov> >; Patrick Decaro <PDecaro@Rentonwa.gov <mailto:PDecaro@Rentonwa.gov> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Hi Cliff, The maintenance bond amount is as shown on the EST amount on the last page of $29.102.03. Once we have done our final review of the worksheet and compared to the bill of sale quantities will let you know to proceed with this number. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033436339%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=vw85YvTuTp6%2Bd8Wd%2B7cinCdcSAPCCXzPI8PeOkQZWMc%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.renton wa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033592582%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwM DAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=79YoEaGU6LY1lWy%2Fon4MBAJZW7md2mV794hgSsX9psg%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Wednesday, June 21, 2023 10:49 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> >; Nathan Janders <NJanders@Rentonwa.gov <mailto:NJanders@Rentonwa.gov> >; Angelea Weihs <AWeihs@Rentonwa.gov <mailto:AWeihs@Rentonwa.gov> >; Patrick Decaro <PDecaro@Rentonwa.gov <mailto:PDecaro@Rentonwa.gov> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: For the Maintenance Bond and Maintenance Bond and Defect Agreement do we list the amount of $105,083 from the BQWS? Thanks Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Wednesday, June 21, 2023 7:22 AM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> >; Nathan Janders <NJanders@Rentonwa.gov <mailto:NJanders@Rentonwa.gov> >; Angelea Weihs <AWeihs@Rentonwa.gov <mailto:AWeihs@Rentonwa.gov> >; Patrick Decaro <PDecaro@Rentonwa.gov <mailto:PDecaro@Rentonwa.gov> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Thank you Cliff, yes we will be preparing the bill of sale based off the BQWS. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=Y2H60z0nh4YY26U44nVUtHUnmR16lCQtbGmCQg07aD8%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.g ov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiL CJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=kreDh%2BUyu8LsMrjSbPi1o%2BzEWcaaV8dXrhAPMrLwtss%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Wednesday, June 21, 2023 7:21 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> >; Nathan Janders <NJanders@Rentonwa.gov <mailto:NJanders@Rentonwa.gov> >; Angelea Weihs <AWeihs@Rentonwa.gov <mailto:AWeihs@Rentonwa.gov> >; Patrick Decaro <PDecaro@Rentonwa.gov <mailto:PDecaro@Rentonwa.gov> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: The BQWS is attached. Will you be preparing the Bill of Sale document? Thanks Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Tuesday, June 20, 2023 2:44 PM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> >; Nathan Janders <NJanders@Rentonwa.gov <mailto:NJanders@Rentonwa.gov> >; Angelea Weihs <AWeihs@Rentonwa.gov <mailto:AWeihs@Rentonwa.gov> >; Patrick Decaro <PDecaro@Rentonwa.gov <mailto:PDecaro@Rentonwa.gov> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Good afternoon Cliff, We are very close but please refer to the close-out item email that was sent on March 2nd. There are still a couple of outstanding items that need to be resolved first prior to recording: The following is a summary of the Civil Construction Permit Closeout and the Final Short Plat Application Recording Processes that are remaining. These two processes are separate, but they do work together. Proactive communication is essential in completing these processes in a timely manner. The items below must be completed prior to the final short plat recording. All requested documents can be emailed to me directly unless there are large items that will require an FTP upload link. Final Short Plat Application and Recording Process 1. Official Final Short Plat submittal with all required submittal requirements. Submit official final short plat application <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs .rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464230%26dbid%3D0%26repo%3DCityofRenton%26cr%3D1&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a 05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=f4ODYW3yFLuAlMF6OBWYG07XUGbXDRAvQHMVk%2BxqLoc%3D& reserved=0> to the City using the link above. When the application has been deemed complete, the city will perform the official final short plat review. If all conditions of approval have been addressed along with the redline comments provided in the attached documents, the city will request hard copies of the documents to be delivered to the City for processing (see Item #3 below). See attached for redline comments made on the pre-submittal review of the documents. Done. 2. Civil Construction Permit Closeout. All items must be completed below, and the Civil Construction permit signed to record the final plat. Ongoing (see below). 3. Record Final Short Plat. Once the Civil Construction Permit is signed off and the official final short plat application has been submitted and approved, the City will send signed final short plat documents to King County for recording. Pending Civil closeout. 4. King County Recording and City Courier Fees. Pay invoice for King County recording fees and City Courier fee invoiced by the City. Note: The City will record the project’s legal documents electronically on the Applicant’s behalf. The City will provide you an invoice for the recording fees once the draft legal documents are far enough in review to determine the required fees to record the documents with King County (required information include type and total pages of each document). Invoices can be paid online by visiting the City’s Permit Portal <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Fpayinvoice&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b% 7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=JBCmcV3ytAfm8t3hvX%2F8 nkl8gxEkuVfz1n6XYHVDoPw%3D&reserved=0> . Pending Civil Closeout. I will create the invoice once we have the Maintenance and Defect Agreement ready. Civil Construction Required Closeout Items/Process 1. Complete all utility, drainage, paving, grading, lighting, landscaping and street improvements for the projects, including offsite and onsite improvements, as required. Done. a. Record drawings have been received and the punch list inspection is underway. Note: the maintenance walk-thru period is 10 working days after the Inspector walk-thru. Done. b. Completion of all improvements includes all outstanding punchlist items as requested from the Construction Inspector and/or the City Maintenance Division. Done. c. All franchise, building, and electrical permits associated with civil construction permits shall receive final sign off from the City. Typical work include dry utilities, demolition, storm drainage vaults, street lighting, retaining walls, etc. Done. 2. Landscape Completion. When landscaping is complete and record drawings of the landscaping have been submitted, contact Angelea Weihs for landscaping inspection. Done. 3. Conditions of Approval. Ensure all project entitlement conditions of approval are completed (i.e. SEPA, Site Plan, Modifications, Permit, etc). Done. 4. Deferrals. A deferral permit must be issued for any items that will not be completed prior to recording. The deferral permit shall be issued before the final punchlist walk-throughs will commence. Typical deferral items include final lift of asphalt, raising and paving of manholes and catch basins, installation of survey monuments and striping/channelization of the roadway. Done. a. A completed Deferral Application <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8461913%26dbid%3D0%26repo%3DCityofRenton%2 6cr%3D1&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV 2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rOV5FaTBqW6k2jRPOArGxRh9pFJ%2BC7QZPxolnbJGYME%3D&reserved=0> will need to be submitted for review by City staff. Once the deferral has been approved, a formal approval letter will be sent providing you with the required surety amount for the deferral (150% of the cost of the deferred items). Done. b. Deferral sureties must be secured with cash or check, with a completed Performance Assurance <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDo cView.aspx%3Fid%3D8464268%26dbid%3D0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7C Unknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=8bvpvbbGidHggf9X6rgSbVAET56avFByKV0BK96Bzj0%3D&reserved=0> , or Assignment of Funds <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464265%26dbid%3D0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Re ntonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3 D%7C3000%7C%7C%7C&sdata=tz9qsaHtT1t0q8FTmjaqmclKaenkkCySOPT2viFh9gg%3D&reserved=0> . Done. 5. Bond Quantity Worksheet. Submit an updated Bond Quantity Worksheet <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464266%2 6dbid%3D0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWI joiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=ZO1BKf0oXgPvIJ9H2zRJj%2BDkoRgxQ9hA4v%2FbB8VTHAs%3D&reserved=0> with the final record drawings. The worksheet should reflect all final construction quantities and shall be submitted to the City as an excel file for review. Note: The City will verify the quantities against the record drawings and provide you with a Bill of Sale for your signature and will provide you with the Maintenance Surety Amount (see Item #6). Have not received final bond quantity worksheet based on final record drawings. 6. Maintenance Surety/Maintenance and Defect Agreement. After the construction permit is signed off by the Inspector, a two year Maintenance Surety must be posted with the City for 20% of the value of the public improvements to be turned over to the City which is noted on the final page of the City approved project Bond Quantity Worksheet (see Item #5). The original Performance Bond will be released after the Maintenance Bond <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464271%26dbid%3D 0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=89ys6hxqlczR4ShsAP0U%2FMR2gLimomiGnqax%2FsOjFcA%3D&reserved=0> and Maintenance and Defect Agreement form <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8464270%26dbid%3D0%26repo%3DCityofRenton&data=05%7C01%7CNJanders%40Rentonwa.go v%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000% 7C%7C%7C&sdata=dBYs4%2BSYPLOZ%2Bn%2FNYjgK2BIAfEvT%2FGS59Vn3mH1kOA8%3D&reserved=0> is accepted by the City and the Civil Construction Permit has been placed in “finaled-maintenance” status. Provide signed Maintenance and Defect Agreement form. Maintenance bond pending final bond quantity worksheet and bill of sale. 7. Special Inspection Report. Provide Special Inspection Reports from the Special Inspectors for the vault assuring that the structure is built in accordance with the approved plans. Provide. 8. Overtime Inspection. Ensure any outstanding invoices billed for overtime inspection by our inspection group are paid in full (if applicable). Note: Outstanding invoices can be paid online by visiting the City’s Permit Portal <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Fpayinvoice&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1 b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7 C&sdata=JBCmcV3ytAfm8t3hvX%2F8nkl8gxEkuVfz1n6XYHVDoPw%3D&reserved=0> . N/A 9. King County Recording Fees. Pay invoice for King County recording fees invoiced by the City. Note: The City will record the project’s legal documents electronically on the Applicant’s behalf. The City will provide you an invoice for the recording fees once the draft legal documents are far enough in review to determine the required fees to record the documents with King County (required information include type and total pages of each document). Invoices can be paid online by visiting the City’s Permit Portal <https://gcc02.safelinks.protection.outlook.com/?u rl=https%3A%2F%2Fpermitting.rentonwa.gov%2F%23%2Fpayinvoice&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7 CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=JBCmcV3ytAfm8t3hvX%2F8nkl8gxEkuVfz1n6XYHVDoPw%3D&reserved=0> . Pending. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=Y2H60z0nh4YY26U44nVUtHUnmR16lCQtbGmCQg07aD8%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.g ov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300033904578%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiL CJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=kreDh%2BUyu8LsMrjSbPi1o%2BzEWcaaV8dXrhAPMrLwtss%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Tuesday, June 20, 2023 2:29 PM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Are we near completion so we can submit the short plat map for signature? Thanks Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Tuesday, June 13, 2023 5:13 PM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 Michael: Revised and signed REETA form. Thanks for moving this along. Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Monday, June 12, 2023 11:02 AM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Cliff, Just some very minor comments on the REETA. Yes, these forms are very tricky but we’ve been getting a lot of them rejected recently for very minor things so want to make sure we get it through on the first pass. I received word from Patrick Decaro that the improvements are complete so we can move onto finalizing the bill of sale, recording etc. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=%2Fsi%2Bu1UksgfucnVEdQuGy%2F9kps%2B4JxX5gvx6WwePknQ%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.re ntonwa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=MkwF8vhx1BndB54INWCmW3bXNifeBhCBH7MOm0ExXLw%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Monday, June 5, 2023 10:28 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Thanks, glad we could turn around quickly. Is the review of the short plat map complete and should we print and collect signatures? Also, have the record drawings been approved? Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Friday, June 2, 2023 6:46 AM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Thanks Cliff, this is a lot better, appreciate the quick turnaround. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=%2Fsi%2Bu1UksgfucnVEdQuGy%2F9kps%2B4JxX5gvx6WwePknQ%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.re ntonwa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=MkwF8vhx1BndB54INWCmW3bXNifeBhCBH7MOm0ExXLw%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Thursday, June 1, 2023 8:57 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Attached is a cleaner copy of the Deed of Dedication. Thanks for the opportunity to rescan the document. Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Thursday, June 1, 2023 6:37 AM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Thank you Cliff, we are performing the final review. I wanted to quickly note that the scanned Deed of Dedication file may get rejected for recording due to it being tilted and the scanner shadows are within the margin. Due to this, the scanner also increased the size to 8.5 x 14. Not saying it’s guaranteed that it will get rejected but in my experience chances are pretty high. I can still perform the review/approval but highly suggest that you provide a cleaner file before we send out to recording. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=%2Fsi%2Bu1UksgfucnVEdQuGy%2F9kps%2B4JxX5gvx6WwePknQ%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.re ntonwa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=MkwF8vhx1BndB54INWCmW3bXNifeBhCBH7MOm0ExXLw%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Tuesday, May 30, 2023 10:22 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Attached are the revised forms per your redlined comments. Hopefully, approval is near completion. Thanks Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Friday, May 26, 2023 1:33 PM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Good afternoon Cliff, Attached are the minor comments for the short plat review. Please update and let me know if you have any questions. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=%2Fsi%2Bu1UksgfucnVEdQuGy%2F9kps%2B4JxX5gvx6WwePknQ%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.re ntonwa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=MkwF8vhx1BndB54INWCmW3bXNifeBhCBH7MOm0ExXLw%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Wednesday, May 10, 2023 8:20 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Thanks, we look forward to approval and recording. Please advise if the as-built plans have been approved. Thanks Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Wednesday, May 10, 2023 7:37 AM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Thank you Cliff, received. I will route for review. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=%2Fsi%2Bu1UksgfucnVEdQuGy%2F9kps%2B4JxX5gvx6WwePknQ%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.re ntonwa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=MkwF8vhx1BndB54INWCmW3bXNifeBhCBH7MOm0ExXLw%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Friday, May 5, 2023 5:47 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: Re: LUA23-000075 24th St Final Short Plat - Rev 1 Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: The rised Short Plat Map and new Title Report are attached. Hopefully, this is ready to record. Thanks for your help. Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Thursday, April 20, 2023 9:21 AM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: RE: LUA23-000075 24th St Final Short Plat - Rev 1 Thanks Cliff, The deed of dedication form can be found at: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8461912&dbid=0&repo=CityofRenton&cr=1 <https://gcc02.safelinks.protection.outlook.com/?url=https%3A% 2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D8461912%26dbid%3D0%26repo%3DCityofRenton%26cr%3D1&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C710141410611488 58e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=JWveRed1PYYgDi3dpjB0ZcmEo0L4dekCIkvdAcv q2gc%3D&reserved=0> Let me know if that works for you. MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=%2Fsi%2Bu1UksgfucnVEdQuGy%2F9kps%2B4JxX5gvx6WwePknQ%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.re ntonwa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=MkwF8vhx1BndB54INWCmW3bXNifeBhCBH7MOm0ExXLw%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Thursday, April 20, 2023 8:43 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: LUA23-000075 24th St Final Short Plat - Rev 1 Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Thanks for your comments. Regarding the updated Deed of Dedication form. The link provided isn't working. If possible, please attach a copy of the form in a follow up email. Much appreciated. Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Sent: Tuesday, April 18, 2023 2:21 PM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: LUA23-000075 24th St Final Short Plat - Rev 1 Bob and Cliff, Please find the attached minor redline comments for the 24th St Short Plat final plat. Please let me know if you have any questions. Thank you, MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CNJanders%40Rentonwa.gov% 7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C %7C%7C&sdata=%2Fsi%2Bu1UksgfucnVEdQuGy%2F9kps%2B4JxX5gvx6WwePknQ%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.re ntonwa.gov%2F%23%2Fhome&data=05%7C01%7CNJanders%40Rentonwa.gov%7Cbf1b9a3bce5041574a2608db7971591b%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638237300034061517%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wL jAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=MkwF8vhx1BndB54INWCmW3bXNifeBhCBH7MOm0ExXLw%3D&reserved=0> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Sent: Tuesday, March 21, 2023 9:02 AM To: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> > Cc: Bob Wenzl <bob@tuscanywa.com <mailto:bob@tuscanywa.com> > Subject: 24th St Final Short Plat - Payment Confirmation - Renton, WA Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Michael: Thanks for the reminder. I had missed your email accepting the application. Cliff Williams, PE Development Management Engineers, LLC 206 714-7161 ________________________________ From: noreply@mygovpay.com <mailto:noreply@mygovpay.com> <noreply@mygovpay.com <mailto:noreply@mygovpay.com> > Sent: Tuesday, March 21, 2023 8:57 AM To: cliff sitedme.com <cliff@sitedme.com <mailto:cliff@sitedme.com> > Subject: Payment Confirmation - Renton, WA Renton, WA Payment Confirmation Payment Date Tuesday, March 21, 2023 Order Number 21053 Line Items Invoice # Item Description Quantity Unit Price Total Price 00131582 LUA23-000075 1 $3,192.00 $3,192.00 Item Total $3,192.00 Order Total $3,192.00 Thank you for your payment, Renton, WA