HomeMy WebLinkAboutChange Order - 4Change Order No. 4
Contract Title: Rainier Ave 5 Corridor Improvements -- Phase 4
Contractor: Pivetta Brothers Construction, Inc.
Contract No.: CAG-22-163
Federal Aid No.: STPUL-1615(005)
Ordered by Engineer Z Lump Sum
Proposed by the Contractor (VECP) Bid Item
Unilateral Force Account
Amount Working Days
Original Contract: 28,284,174.90 500
Current Contract: 28,362,893.78 500
Estimated Net Change This Order: 38,616.76 0
New Contract: 28,401, 510.54 500
Vident 4En
d By:
Rgineer Date eer (city of Rentonrransportation Date
Design Manager)
Reviewed By:
6/29/ 23
Eniine&'df Record Date
Reviewed By:
4A bl,o1; 6/30/2023
City f Rento roject Manager Date
Reviewed By:
City Attorney Date
Consent By:
Surety {Greater than 25% cost and/or 20% Date
time increase}
Endorsed By:
Bill Adams Digitally signed by Bill Adams
Date: 2023.07.12 17:17: 52- 07'00'
Contractor Date
Execut d B
Z 2-0Z 3
City of Renton Public Works Date
Administrator / Mayor
Change Order No. 4
Contract Title: Rainier Ave S Corridor Improvements — Phase 4
Contract No. CAG-22-163
Page 1 of 7
CAG-22-163, CO #4-23
Approved by Cheryl Beyer via 6/30/2023 email
ITl:f di7 1ii;7_Fi 6 IiI7 f91 i7 iril4[i1rAkA
Description of Change:
4-A166 — Revised Fiber Optic Cabling Sizing for Interconnect, 1 LS, $38,616.76
The Contractor is directed to install 288 CT fiber optic cabling for the interconnect system per
Field Directive #25 instead of the proposed 48 CT fiber optic cabling for the interconnect system
which was indicated in the plans. This Change Order creates an item to compensate the
Contractor for the added costs to procure and install 288 CT fiber optic cabling for the
interconnect system instead of the proposed 48 CT fiber optic cabling for the interconnect
system.
Reason for Change:
The plans and specifications required the Contractor to install 48 CT fiber optic cabling for the
interconnect system. The City of Renton signal department determined that the future needs of
the City exceeded the proposed 48 CT fiber optic cabling and that 288 CT fiber optic cabling was
necessary.
Affects DBE Work: ® Yes No
Materials:
288 CT Fiber Optic Cabling — SP 9-29.3(1)
Plans:
None.
Equitable Adjustment:
This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022
WSDOT/APWA Standard Specifications. See attached.
Extension of Time:
The Time for Completion is extended 0 Working Days.
Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
To be attached to Change Order:
Estimated Change Order Cost
Change Order No. 4
Contract Title: Rainier Ave S Corridor Improvements — Phase 4
Contract No. CAG-22-163
Page 2 of 7
Plans
Field Directive/Request for Information Response/Serial Letter
Change Order Quotation
Project Labor List
Force Account Equipment Rate Request (DOT Form 422-010 EF)
Overhead Adjustment Determination
Change Order No
Contract Title:
Contract No.
Rainier Ave S Corridor Improvements — Phase 4
CAG-22-163
Page 3 of 7
Revised Fiber Optic Cabling Sizing for Interconnect - Field Directive
FIELD DIRECTIVE
PERTEET
8012,d Avenue Suite 302. Seattle. WA 981041 P 206.436.0515
Project Name Federal Aid Contract No. Date
Rainier Ave S Corridor Improvements -
Phase 4U3rdSTtoNW3rdPU STPUL-1615(005) CAG-22-163 6/292023
Field Dnenive Description field D,ci,,ve No.
Revised Fiber Sizing for Interconnect 025
Contractor
Pivelto Brothers Construction
The Following is documentation of an oral order given by the Engineer per WSDOT Specification 1-04.4.
The Contractor shall install the fiber for the fiber optic interconnect system as a 288 CT fiber cable instead of the 48 CT fiber cable as was indicated in the
plans.
A change order will be sent to compensate the Contractor for the added costs resulting from this change.
Project Engineer (or Representative) Date
6/29/2023
Change Order #4 - Page 4 of 7
Revised Fiber Optic Cabling Sizing for Interconnect - Contractors Quote
Serial Letter: 003
April 12, 2023
To: Michelle Faltaous
City of Renton
1055 South Grady Way
Renton, Washington 98057
Reference Project: CAG-22-163, Rainier Ave S Corridor Improvements - Phase 4 Project
Subject: PCO-03 Options to Upsize Fiber
Mrs. Michelle Faltaous:
Pursuant to section 1-04.4, the City of Renton has requested that we provide pricing to increase the size
of the fiber optic cable under Pay A143 to 144 and 288. Golden Gate Electric's pricing for this work is
attached. With Pivetta's markup these costs are as follows:
Option 1-144 $19,959.74
Option 2 - 288 $38,616.76
Please feel free to contact me, at (206) 914-2723 if you have any questions or concerns.
Respectfully,
Bill Adams
Sr. Project Manager
w/ Attachments:
Golden Gate Pricing - Change Order Upsize Fiber
Cc:
Jordan Howe, Perteet
Russ Owen, Pivetta
Change Order #4 - Page 5 of 7
Revised Fiber Optic Cabling Sizing for Interconnect - Contractors Quote
1" Cable Added Cost
Cable 4,200.00
FOSC D Closure & A Closure 2,900.00
Labor 4,900.00
Markup 2,520.00
Golden Gate Supervision 3,301.20
Total $ 17,821.20
288 Cable Added Cost
Cable 14,200.00
FOSC D Closure & A Closure 2,900.00
Labor 7,900.00
Markup 5,250.00
Golden Gate Supervision 4,401.60
Total $ 34,651.60
Change Order #4 - Page 6 of 7
Revised Fiber Optic Cabling Sizing for Interconnect - Change Order Cost Estimate
Change Order Cost (Equitable Adjustment) Change Order No. 4
Project Name: Rainier Ave S Corridor Improvements - Phase 4
Contractor: Pivetta Brothers Construction, Inc.
Contract No: CAG-22-163
Federal Aid No: STPUL-1615(005) By: Jordan Howe
Construction Manager: Perteet Date:6/29/2023
Item No. Description I Quantity Unit Unit Price I Estimated Cost
Lump Sum Estimate
Labor Hours 0.00
Labor Markup 31% 0.00
Equipment Hours 0.00
Equipment Markup 21% 0.00
Materials FA 0-00
Materials Markup 21% 0.00
4-A166 services (Historic pricing for cost difference between 288 CT and 48 CT fiber) 6000 LF 8.86 53,132.06
services Markup 21% 11,157.73
Mobilization Estimate 0.00
subcontractor Estimate 0.00
subcontractor Markup 12% 0.00
CALCULATED TOTAL: 64,289.79
ESTIMATED TOTAL: 38,616.76
Bid Item Change
4-A166 Revised Fiber Optic Cabling Sizing for Interconnect 1 LS 38,616.76 38,616.76
TOTAL 38,616.76
Overhead
Per attached determination By Agreement 0.00
Estimated Change Order Cost 38,616.76
Summary of Contractors Quotes:
Item Quote Location Quoted Cost
4-A166 S1.003 $ 38,616.76
Total Quoted Added Cost: $ 38,616.76
Change Order p4 - Page 7 of 7