Loading...
HomeMy WebLinkAboutChange Order - 4Change Order No. 4 Contract Title: Rainier Ave 5 Corridor Improvements -- Phase 4 Contractor: Pivetta Brothers Construction, Inc. Contract No.: CAG-22-163 Federal Aid No.: STPUL-1615(005) Ordered by Engineer Z Lump Sum Proposed by the Contractor (VECP) Bid Item Unilateral Force Account Amount Working Days Original Contract: 28,284,174.90 500 Current Contract: 28,362,893.78 500 Estimated Net Change This Order: 38,616.76 0 New Contract: 28,401, 510.54 500 Vident 4En d By: Rgineer Date eer (city of Rentonrransportation Date Design Manager) Reviewed By: 6/29/ 23 Eniine&'df Record Date Reviewed By: 4A bl,o1; 6/30/2023 City f Rento roject Manager Date Reviewed By: City Attorney Date Consent By: Surety {Greater than 25% cost and/or 20% Date time increase} Endorsed By: Bill Adams Digitally signed by Bill Adams Date: 2023.07.12 17:17: 52- 07'00' Contractor Date Execut d B Z 2-0Z 3 City of Renton Public Works Date Administrator / Mayor Change Order No. 4 Contract Title: Rainier Ave S Corridor Improvements — Phase 4 Contract No. CAG-22-163 Page 1 of 7 CAG-22-163, CO #4-23 Approved by Cheryl Beyer via 6/30/2023 email ITl:f di7 1ii;7_Fi 6 IiI7 f91 i7 iril4[i1rAkA Description of Change: 4-A166 — Revised Fiber Optic Cabling Sizing for Interconnect, 1 LS, $38,616.76 The Contractor is directed to install 288 CT fiber optic cabling for the interconnect system per Field Directive #25 instead of the proposed 48 CT fiber optic cabling for the interconnect system which was indicated in the plans. This Change Order creates an item to compensate the Contractor for the added costs to procure and install 288 CT fiber optic cabling for the interconnect system instead of the proposed 48 CT fiber optic cabling for the interconnect system. Reason for Change: The plans and specifications required the Contractor to install 48 CT fiber optic cabling for the interconnect system. The City of Renton signal department determined that the future needs of the City exceeded the proposed 48 CT fiber optic cabling and that 288 CT fiber optic cabling was necessary. Affects DBE Work: ® Yes No Materials: 288 CT Fiber Optic Cabling — SP 9-29.3(1) Plans: None. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. Extension of Time: The Time for Completion is extended 0 Working Days. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. To be attached to Change Order: Estimated Change Order Cost Change Order No. 4 Contract Title: Rainier Ave S Corridor Improvements — Phase 4 Contract No. CAG-22-163 Page 2 of 7 Plans Field Directive/Request for Information Response/Serial Letter Change Order Quotation Project Labor List Force Account Equipment Rate Request (DOT Form 422-010 EF) Overhead Adjustment Determination Change Order No Contract Title: Contract No. Rainier Ave S Corridor Improvements — Phase 4 CAG-22-163 Page 3 of 7 Revised Fiber Optic Cabling Sizing for Interconnect - Field Directive FIELD DIRECTIVE PERTEET 8012,d Avenue Suite 302. Seattle. WA 981041 P 206.436.0515 Project Name Federal Aid Contract No. Date Rainier Ave S Corridor Improvements - Phase 4U3rdSTtoNW3rdPU STPUL-1615(005) CAG-22-163 6/292023 Field Dnenive Description field D,ci,,ve No. Revised Fiber Sizing for Interconnect 025 Contractor Pivelto Brothers Construction The Following is documentation of an oral order given by the Engineer per WSDOT Specification 1-04.4. The Contractor shall install the fiber for the fiber optic interconnect system as a 288 CT fiber cable instead of the 48 CT fiber cable as was indicated in the plans. A change order will be sent to compensate the Contractor for the added costs resulting from this change. Project Engineer (or Representative) Date 6/29/2023 Change Order #4 - Page 4 of 7 Revised Fiber Optic Cabling Sizing for Interconnect - Contractors Quote Serial Letter: 003 April 12, 2023 To: Michelle Faltaous City of Renton 1055 South Grady Way Renton, Washington 98057 Reference Project: CAG-22-163, Rainier Ave S Corridor Improvements - Phase 4 Project Subject: PCO-03 Options to Upsize Fiber Mrs. Michelle Faltaous: Pursuant to section 1-04.4, the City of Renton has requested that we provide pricing to increase the size of the fiber optic cable under Pay A143 to 144 and 288. Golden Gate Electric's pricing for this work is attached. With Pivetta's markup these costs are as follows: Option 1-144 $19,959.74 Option 2 - 288 $38,616.76 Please feel free to contact me, at (206) 914-2723 if you have any questions or concerns. Respectfully, Bill Adams Sr. Project Manager w/ Attachments: Golden Gate Pricing - Change Order Upsize Fiber Cc: Jordan Howe, Perteet Russ Owen, Pivetta Change Order #4 - Page 5 of 7 Revised Fiber Optic Cabling Sizing for Interconnect - Contractors Quote 1" Cable Added Cost Cable 4,200.00 FOSC D Closure & A Closure 2,900.00 Labor 4,900.00 Markup 2,520.00 Golden Gate Supervision 3,301.20 Total $ 17,821.20 288 Cable Added Cost Cable 14,200.00 FOSC D Closure & A Closure 2,900.00 Labor 7,900.00 Markup 5,250.00 Golden Gate Supervision 4,401.60 Total $ 34,651.60 Change Order #4 - Page 6 of 7 Revised Fiber Optic Cabling Sizing for Interconnect - Change Order Cost Estimate Change Order Cost (Equitable Adjustment) Change Order No. 4 Project Name: Rainier Ave S Corridor Improvements - Phase 4 Contractor: Pivetta Brothers Construction, Inc. Contract No: CAG-22-163 Federal Aid No: STPUL-1615(005) By: Jordan Howe Construction Manager: Perteet Date:6/29/2023 Item No. Description I Quantity Unit Unit Price I Estimated Cost Lump Sum Estimate Labor Hours 0.00 Labor Markup 31% 0.00 Equipment Hours 0.00 Equipment Markup 21% 0.00 Materials FA 0-00 Materials Markup 21% 0.00 4-A166 services (Historic pricing for cost difference between 288 CT and 48 CT fiber) 6000 LF 8.86 53,132.06 services Markup 21% 11,157.73 Mobilization Estimate 0.00 subcontractor Estimate 0.00 subcontractor Markup 12% 0.00 CALCULATED TOTAL: 64,289.79 ESTIMATED TOTAL: 38,616.76 Bid Item Change 4-A166 Revised Fiber Optic Cabling Sizing for Interconnect 1 LS 38,616.76 38,616.76 TOTAL 38,616.76 Overhead Per attached determination By Agreement 0.00 Estimated Change Order Cost 38,616.76 Summary of Contractors Quotes: Item Quote Location Quoted Cost 4-A166 S1.003 $ 38,616.76 Total Quoted Added Cost: $ 38,616.76 Change Order p4 - Page 7 of 7