Loading...
HomeMy WebLinkAboutMFP23002509.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP23002509 IVR Number: 23002509 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:05/11/2023Application Date:3345700016Parcel Number: 4196 LINCOLN PL NE, LOT Permit Type:07/18/2023Issue Date:Franchise Permit Work Class:07/17/2024Expiration Date:Major Utility Job Number: 107061870Franchise Type:Natural Gas Description: PSE Gas CREW TO TRENCH FOR GAS MAIN ACROSS LINCOLN AVE. CREW TO INSTALL GAS MAIN IN OPEN TRENCH LINE AT ROAD 'A'. APPROX 400' OF ASPHALT TRENCH. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX INFRASOURCE SVCS B: (206) 949-5846Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering INFRASOURCE, INC 6905 S 228TH ST KENT, WA 98032 PLEASE SEE ATTACHED 107061870 4196 LINCOLN AVE NE RANDY BLACKIE MFP23002509 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 7/18/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG LINCOLN AVE NENE 40TH S TW20-1ROADWORKAHEADW20-4ONE LANEROADAHEAD100'100'100'W20-7A12 12 W20-1ROAD WORK AHEAD W20-4ONE LANE ROADAHEAD100'100'100'W20-7A12 12 STOP STOP FROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGPLACE SIGNS ALONG WORK AREA TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Kali-Jamal Collins 424-425-6425 Kali-jamal.collins@pse.com 1 OF 34196 Lincoln Ave N, Renton, WA 0 512980096 04/25/2023 Puget Sound Energy Traffic Control Supervisor:Jamal I. Collins Card No. 013375 Card Exp. 10/2026 Kali-Jamal.Collins@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP23002509 LINCOLN AVE NENE 40TH S TW20-1ROADWORKAHEADW20-4ONE LANEROADAHEAD100'100'100'W20-7A12 12 W20-1ROAD WORK AHEAD W20-4ONE LANE ROADAHEAD100'100'100'W20-7A12 12 STOP STOP FROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGPLACE SIGNS ALONG WORK AREA Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Kali-Jamal Collins 424-425-6425 Kali-jamal.collins@pse.com 2 OF 34196 Lincoln Ave N, Renton, WA 0 512980096 04/25/2023 Puget Sound Energy Traffic Control Supervisor:Jamal I. Collins Card No. 013375 Card Exp. 10/2026 Kali-Jamal.Collins@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP23002509 MONTEREY PL NE1 2 1 2 1212NE 40TH STW20-1ROADWORKAHEAD100'100'W20-3ROADCLOSEAHEADFROM TO TOW AWAY AREA PHONE 684-5444 NAME OF FIRM XXX-XXX-XXXX NO PARKINGPLACE SIGNS ALONG WORK AREATEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVKali-Jamal Collins424-425-6425Kali-jamal.collins@pse.com3 OF 34196 Lincoln Ave N, Renton, WA0 51298009604/25/2023Puget Sound EnergyTraffic Control Supervisor:Jamal I. CollinsCard No. 013375Card Exp. 10/2026Kali-Jamal.Collins@pse.com(425)424-6425Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.LEGENDTRENCHSIGN LOCATIONTRAFFIC FLOW28" TRAFFIC CONEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP23002509 (OPEN SPACE) (STORM/OPEN SPACE) (OP. SP.) (NGPA) (STORM/ OPEN SPACE) (OP. SP.) (ACCESS) 40+00 41+0042+0043+0044+0060+0 0 61+0010+00 11+00 12+00 13+00 17+001 8+00 30 + 0 0 31+0033+0092+0093+0094+0095+0096+0097+0050+00120+001 2 1 + 0 0 10+00 13+00 14+0015+0016+0017+001 8+00 50+0098+0099+00100+001 0 1 + 00 102+00103+00104+0097+6993+0094+0095+0096+0097+0030 + 0 0 31+0032+0070 + 0 0 71+001 2 1 + 0 0LINCOLN AVE NEWETLAND "D" WETLAND "B" WETLAND "C" STREAM "S"WETLAND "A" TRACT C TRACT A TR. K TRACT G TRACT H TR. J TRACT D VAULT ACCESS ROADVAULT A C C E S S A ROAD AALLEY 1ALLEY 2ALLEY 2A 53 52 54 49 48 55 (OPEN SPACE)TRACT B 51 46 47 50 41 45 44 43 42 9 8 7 10 16 15 14 13 12 11 2 4 1 5 6 3 TYPICAL PSE EASEMENT 60' 53' 53'1 6 ' 20'20'16' 'A' 'B' 'C'2" MPE IP 14'W98142972 " MPE IP 20 'W 98 1 4 2 9 7 755'S24'W, 755'S2" MP E I P 9' W 98142 9 7 FLOWELECONLYELEC ONLY 20'95+1489+08SE 80TH ST.60'2" PE IP 15'S 923553 110'W, 15'S2" PE IP 13'S 9814297 Owner / Developer Contact Info officeATTN: CENTURY COMMUNITIES 20000 N CREEK PKWY, STE 200 BOTHELL, WA 98011 STACIA BLOOM 949.838.6057 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105100613107061870Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 45 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-___. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL R. BLACKIE 425.457.2614 . CE FEASEL 253.263.5276 04.04.23 S. LEWISON .01.23.23 REDT # ( RW-127386 )RENTON CANOPY 2" MPE-___ GAS MAIN EXTENSION - 55 S/F LOTS P# 3345700015, 4196 LINCOLN AVE NE, RENTON, WA 98056 PUGET SOUND ENERGY 107061870 105100613 1" = 50'1 OF 2 KING 24 CIKNC 32NE-T24N-R05E 200.080 202.083 COMCAST JAMES COHN 253.569.0636 LUMEN ALEX HARB . RIGHT OF WAY DARBY BROYLES 425.457.4137 . . . N/A N/A N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 512980096 107061870 N/A 106387349 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 INSTALL 2"MPE-___120 FT JOINT 2"MPE-___2662 FT .... .... .... .... Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:RANDY BLACKIE 425.457.2614 randy.blackie@pse.com 60 IP 469-45 N/A N/A SITE PLAN xx INSTALL 2" = 120 FT JOINT 2" = 2662 FT ... ... ... STACIA.BLOOM@CENTURYCOMMUNITIES.COM IP 469-45 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 CFH / HOME = 190 BREAKLINE (~221 FT) MATCHLINE A-A (SEE PAGE 2) 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE NOT TO SCALE CROSS SECTION - LINCOLN AVE NE LOOKING SOUTH W 60' ROW E GEX 2" MPE IP - 14'-20'W 9814297 E PROP. 2" PE IP - 10'E TO 17'E G W 16' ACCESS NOT TO SCALE CROSS SECTION - ALLEY 1 LOOKING NORTH W PROP. 2" PE IP - 12'E G E20' ACCESS NOT TO SCALE CROSS SECTION - ALLEY 2 LOOKING NORTH 2" HVTT TIE-IN 524'S C/L & 20'W C/L ______'S C/L & _____'W C/L INSTALL 2" MPE-___ 50' @ 524'S C/L (______)' @ _____'S C/L BEGIN JOINT MAIN 28'S C/L & 30'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 191' @ 26'S C/L TO 29'S C/L (______)' @ _____'S C/L TO _____'S C/L JOINT 2" MPE-___ 374' @ 10'E C/L TO 17'E C/L (______)' @ _____'E C/L TO _____'E C/L 2" CAP EOM/WIREBOX 403'S C/L & 17'E C/L ______'S C/L & _____'E C/L 2" INLINE TEE 29'S C/L & 10'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 565' @ 29'S C/L TO 29'W C/L (______)' @ _____'S C/L TO _____'W C/L 2" INLINE TEE 64'S C/L & 29'W C/L ______'S C/L & _____'W C/L JOINT 2" MPE-___ 97' @ 64'S C/L TO 107'S C/L (______)' @ _____'S C/L TO _____'S C/L 2" 90° ELBOW 107'S C/L & 12'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 360' @ 12'E C/L TO 4'W C/L (______)' @ _____'E C/L TO _____'W C/L 2" CAP EOM/WIREBOX 253'N C/L & 4'W C/L ______'N C/L & _____'W C/L 2" POLYVALVE/OPEN 26'S C/L & 38'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 8' @ 26'S C/L (______)' @ _____'S C/L N Vicinity Map 47.5298, -122.1935 SITE CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 'A'TR. A ELEC ONLY 2 SCH80 1 60 ( )' NCL PRIMARY X02 TR. A TR. H ELEC ONLY 2 SCH80 1 60 ( )' ECL PRIMARY X03 TR. H TR. J 4 40 1 N 2 SCH80 1 25 ( )' SCL GAS MAIN, PRIMARY X04 TR. J TR. K 4 40 1 N 2 SCH80 1 20 ( )' SCL GAS MAIN, PRIMARY X05 LOT 8 LOT 1 2 40 1 N 3 SCH80 1 20 .GAS SVC, SECONDARY X06 LOT 9 LOT 2 2 40 1 N 2 SCH80 1 20 .GAS SVC, PRIMARY ----3 SCH80 5 20 .SECONDARY X07 LOT 12 LOT 5 2 40 1 N 3 SCH80 2 20 .GAS SVC, SECONDARY X08 LOT 13 LOT 6 2 40 1 S 3 SCH80 1 20 .GAS SVC, SECONDARY X09 LOT 16 TR. F 4 40 1 E 2 SCH80 1 20 ( )' WCL GAS MAIN, PRIMARY X10 TR. F LOT 41 4 40 1 N 2 SCH80 1 100 ( )' NCL GAS MAIN, PRIMARY X11 'B''C' 4 40 1 W 2 SCH80 1 40 .GAS MAIN, PRIMARY ----3 SCH80 1 40 .SECONDARY X12 'C'LOT 55 2 40 1 N 3 SCH80 2 25 .GAS SVC, SECONDARY X13 LOT 44 LOT 52 2 40 1 S 3 SCH80 2 25 .GAS SVC, SECONDARY X14 LOT 46 LOT 50 2 40 1 S 3 SCH80 2 25 .GAS SVC, SECONDARY X15 LOT 47 LOT 49 2 40 1 S 3 SCH80 1 25 .GAS SVC, SECONDARY X16 TR. F LOT 40 4 40 1 N 2 SCH80 1 60 ( )' SCL GAS MAIN, PRIMARY X17 LOT 29 LOT 30 4 40 1 S 2 SCH80 2 50 ( )' NCL GAS MAIN, PRIMARY X18 LOT 29 'D'ELEC ONLY 3 SCH80 1 110 ( )' NCL SECONDARY 2" PVC PLUG /CAPS = 16 2" YELLOW SCH 40 PVC = 180 FT 2" SCH80 GREY PVC = 345 FT 2" PVC PLUG /CAPS = 22 4" PVC PLUG /CAPS = 14 4" YELLOW SCH 40 PVC = 315 FT 3" SCH80 GREY PVC = 665FT 3" PVC PLUG /CAPS = 36 CCUD WATER CITY WATER CCUD WATER PRIVATE STORM (Tract Storm, 5- foot separation) CITY WATER (min. 5-foot separation) CITY STORM (min. 5-foot separation) CCUD SEWER 5'-9 1/ 2 " 6'-7 1/ 2 " 5'-11 1 / 2 " 6'-0" ANSWER: Please note - ALL of the SEWER in this project is provided by CCUD. Please note - HALF of the WATER in this project is provided by CCUD. Please note - HALF of the WATER in this project is provide by CITY (BLUE). Please note - CITY STORM is located only in CITY R/W. So, the only place that a CITY Utility coincides nearby a PSE utility is Alley 1. Please see the 48-inch trench detail on Sheet 2, located within a 5-foot PSE easement along Alley 1. The water line is situated minimum of 4-feet off the edge of asphalt. There is an additional 1-foot before the trench is begin. Therefore the total distance between the water and PSE Gas is minimum of 5-feet. Dimension strings along Alley 1 shown hereon for reference for spacing. RESTORATION PER CITY OF RENTON STANDARDS MFP23002509 This permit is for Major construction work in the ROW and will be billed at an additional $158/HR for inspections. After hours and weekend work will be billed at $175/HR TPN: 33 4 5 7 0 - 0 0 3 5 M. KOW A L C Z Y K 4124 LI N C O L N A V E N E 98056 TPN: 33 4 5 7 0 - 0 0 1 9 C. OLSE N 4006 LI N C O L N A V E N E 98056 61+0062+0063+0064+0065+0019+0020+0021+0022+0023+001+00 2+00 3+0066+001+00 2+00 3+00104+00105+00106+00107+00108+00109 + 0 0 1 1 0 + 0 0 ROAD AALLEY 3NE 40TH ST LUND PARCEL B LUND PARCEL C 34 35 31 39 32 37 36 38 33 22 23 24 17 25 18 26 19 20 27 21 28 29 (OPEN SPACE)TRACT F 40 30 60''D' 16'2" MPE IP 15'W109017581-20041 1/8" MPEI 2016 4124 447'N 2" MPE IP 10'E109017581-200425'S, 2 4' WLINCOLN AVE NE53' ELEC ONLY THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL R. BLACKIE 425.457.2614 . CE FEASEL 253.263.5276 04.04.23 S. LEWISON .01.23.23 REDT # ( RW-127386 )RENTON CANOPY 2" MPE-___ GAS MAIN EXTENSION - 55 S/F LOTS P# 3345700015, 4196 LINCOLN AVE NE, RENTON, WA 98056 PUGET SOUND ENERGY 107061870 105100613 1" = 50'2 OF 2 KING 24 CIKNC 32NE-T24N-R05E 200.080 202.083 COMCAST JAMES COHN 253.569.0636 LUMEN ALEX HARB . RIGHT OF WAY DARBY BROYLES 425.457.4137 . . . N/A N/A N/A ... SITE PLAN ... ... ... Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) MATCHLINE A-A (SEE PAGE 1) JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS LS SINGLE 2" MAIN 1 1 1/8 MPE-___30 ( )' SCL 2,600 - LS TWIN 2" MAIN 2 & 3 1 1/8 MPE-___30 ( )' SCL 2,600 - LS TWIN 2" MAIN 4 & 5 1 1/8 MPE-___30 ( )' SCL 2,600 - LS SINGLE 2" MAIN 6 1 1/8 MPE-___30 ( )' SCL 2,600 - SS SINGLE 2" MAIN 7 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 8 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 9 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 10 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 11 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 12 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 13 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 14 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 15 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 16 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 17 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 18 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 19 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 20 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 21 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 22 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 23 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 24 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 25 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 26 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 27 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 28 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 29 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 30 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 31 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 32 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 33 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 34 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 35 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 36 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 37 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 38 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 39 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 40 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 41 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 42 1 1/8 MPE-___10 ( )' SCL 2,600 - SS SINGLE 2" MAIN 43 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 44 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 45 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 46 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 47 1 1/8 MPE-___10 ( )' NCL 2,600 - SS SINGLE 2" MAIN 48 1 1/8 MPE-___10 ( )' NCL 2,600 - LS SINGLE 2" MAIN 49 1 1/8 MPE-___30 ( )' NCL 2,600 - LS TWIN 2" MAIN 50 & 51 1 1/8 MPE-___30 ( )' NCL 2,600 - LS TWIN 2" MAIN 52 & 53 1 1/8 MPE-___30 ( )' NCL 2,600 - LS TWIN 2" MAIN 54 & 55 1 1/8 MPE-___30 ( )' NCL 2,600 - SS SINGLES =42 660 FT 1 1/8" PE PIPE LS SINGLES =3 LS TWIN =5 NOT TO SCALE CROSS SECTION - ROAD A LOOKING NORTH E 50'-53' ROW PROP. 2" MPE IP - 29'ECL W PROP. 2" MPE IP - 29'WCL TO 28'SCL G NOT TO SCALE CROSS SECTION - NE 40TH ST LOOKING EAST S 60' ROW PROP. 2" MPE IP - 27'SCL N PROP. 2" MPE IP - 36'NCL GG E PROP. 2" PE IP - 10'E G W 16' ACCESS NOT TO SCALE CROSS SECTION - ALLEY 3 LOOKING NORTH JOINT 2" MPE-___ 63' @ 29'W C/L (______)' @ _____'W C/L 2" 90° ELBOW 127'S C/L & 29'W C/L ______'S C/L & _____'W C/L JOINT 2" MPE-___ 58' @ 127'S C/L (______)' @ _____'S C/L 2" 90° ELBOW 127'S C/L & 29'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 388' @ 10'E C/L (______)' @ _____'E C/L 2" 90° ELBOW 36'N C/L & 10'E C/L ______'N C/L & _____'E C/L 2" CAP EOM/WIREBOX 424'N C/L & 10'E C/L ______'N C/L & _____'E C/L JOINT 2" MPE-___ 82' @ 36'N C/L (______)' @ _____'N C/L 2" INLINE TEE 36'N C/L & 15'W C/L ______'N C/L & _____'W C/L BEGIN JOINT MAIN & 2" POLYVALVE/OPEN 30'N C/L & 15'W C/L ______'N C/L & _____'W C/L INSTALL 2" MPE-___ 63' @ 15'W C/L (______)' @ _____'W C/L INSTALL 2" MPE-___ 7' @ 27'S C/L (______)' @ _____'S C/L 2" 90° ELBOW 27'S C/L & 15'W C/L ______'S C/L & _____'W C/L 2" CAP EOM/WIREBOX 27'S C/L & 8'W C/L ______'S C/L & _____'W C/L JOINT 2" MPE-___ 44' @ 36'N C/L (______)' @ _____'N C/L JOINT 2" MPE-___ 426' @ 29'E C/L (______)' @ _____'E C/L 2" 90° ELBOW 36'N C/L & 29'E C/L ______'N C/L & _____'E C/LJOINT 2" MPE-___ 6' @ 15'W C/L (______)' @ _____'W C/L G CCUD WATER CCUD WATER CCUD SEWER CITY STORM (min. 5-foot separation) CCUD SEWER CITY STORM (min. 5-foot separation) MFP23002509