Loading...
HomeMy WebLinkAbout7945.04 Field Reports 6.28-7.14 7945.04 E 2023 0628.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0628 Date Wed 6/28/2023 Weather 70°F Clear Arrival/Departure Time(s) 9AM; 9:30AM Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe the backfill of shoring wall. Shoring Wall Backfill While onsite, ESNW rep observed the contractor backfilling the shoring wall at the northeast corner of the site. Contractor placed 12” lifts of structural soil and compacted it with good effort using a large hoe pack. ESNW rep observed the contractor place topsoil on top of the structural fill. Please see image below. Report ID 7945.04 E 2023 0628 Page 2 of 2 Earth Solutions NW, LLC Shoring Wall Backfill 7945.04 E 2023 0629.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0629 Date Thu 6/29/2023 Weather 70°F Clear Arrival/Departure Time(s) 12:15AM; 12:30AM Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe the backfill of shoring wall. Shoring Wall Backfill While onsite, ESNW rep observed the contractor backfilling the shoring wall at the northeast corner of the site. Contractor placed 12” lifts of structural soil and compacted it with good effort using a large hoe pack. ESNW rep observed the contractor place topsoil on top of the structural fill. Please see image below. Report ID 7945.04 E 2023 0629 Page 2 of 3 Earth Solutions NW, LLC Report ID 7945.04 E 2023 0629 Page 3 of 3 Earth Solutions NW, LLC Shoring Wall Backfill 7945.04 E 2023 0705A.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0705A Date Wed 7/5/2023 Weather 70°F Sunny Arrival/Departure Time(s) 9AM; 9:30AM Travel Time (hr) 1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe side sewer backfill and observe berm removal in vault excavation. Side Sewer Backfill Observations While onsite, ESNW rep observed backfilling of 8 foot side sewers in alley 2. ESNW rep observed the side sewers to be bedded in pea gravel and backfilled with native brown sandy silt with gravel. A hoe pack was used to compact the soil with good effort in approximately 12 inch lifts. ESNW rep took compaction tests and observed adequate compaction of at least 95% of the proctor at the specific tested locations. Please see map and table below. Berm Removal Observation ESNW rep was onsite to observe the removal of the berm in the vault excavation. ESNW recommends that the contractor remove the top half of the berm initially, so an ESNW rep can obtain inclinometer readings. Once inclinometer readings indicate stability, the bottom half can be removed as well. Please see image below. Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 148 Side Sewer Backfill -4 9 128.5 12.5 122.0 95 149 Side Sewer Backfill SG 9 128.5 13.1 122.7 95 150 Side Sewer Backfill -4 9 128.5 12.9 123.8 96 151 Side Sewer Backfill SG 9 128.5 12.6 122.1 95 152 Side Sewer Backfill -4 9 128.5 11.9 123.7 96 153 Side Sewer Backfill SG 9 128.5 11.8 121.6 95 Report ID 4658.05 E 2023 0705A Page 2 of 3 Earth Solutions NW, LLC Report ID 4658.05 E 2023 0705A Page 3 of 3 Earth Solutions NW, LLC Side Sewers Main 148,149 150,151 152,153 7945.04 E 2023 0706.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 1 Report ID 7945.04 E 2023 0706 Date Thu 7/6/2023 Weather 70°F Sunny Arrival/Departure Time(s) 9AM; 9:30AM Travel Time (hr) 1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe side sewer backfill. Side Sewer Backfill Observations While onsite, ESNW rep observed backfilling of 8 foot side sewers in alley 2. ESNW rep observed the side sewers to be bedded in pea gravel and backfilled with native brown sandy silt with gravel. A hoe pack was used to compact the soil in approximately 12 inch lifts. ESNW rep took compaction tests and observed adequate compaction of at least 95% of the proctor at the specific tested locations. Please see map and table below. Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 154 Side Sewer Backfill -4 9 128.5 10.6 123.5 96 155 Side Sewer Backfill SG 9 128.5 9.9 122.1 95 Report ID 4658.05 E 2023 0706 Page 2 of 2 Earth Solutions NW, LLC Side Sewers Main 154,155 7945.04 E 2023 0706B.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0706B Date Thu 7/6/2023 Weather 77°F, Sunny Arrival/Departure Time(s) 1130 – 1200 Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Chris Jacobe (206) 928 – 1597 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by the client, an ESNW representative was onsite to observe inclinometer readings. While onsite, the following was observed: Inclinometer Reading Observations: While onsite, ESNW representative observed Inclinometer readings of the slope indicator casing at the approximate Northern locations outside proposed “Tract A”. The Inclinometer casings (Slope Indicators) will continue to be observed by an ESNW representative on a daily basis. Please see attached map below for approximate location of Inclinometer casing. At the client’s request, an ESNW representative will return when needed. Report ID 7945.04 E 2023 0706B Page 2 of 2 Earth Solutions NW, LLC Inclinometer 7945.04 E 2023 0707.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0707 Date Fri 7/7/2023 Weather 70°F Sunny Arrival/Departure Time(s) 1:15PM; 1:45PM Travel Time (hr) 1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe vault excavation. Vault Excavation ESNW rep observed the contractor excavating the northwest corner of the site, for proposed stormwater vault. Rep observed the contractor had excavated into native brown inter bedded sand with gravel, and silt as-depth. ESNW rep observed the eastern and southern edges of the excavation to have an exposed height of approximately 20 feet cut to a temporary 1H:1V slope inclination. The west side of the excavation was observed to have exposed overall heights ranging between approximately 7 to 10 feet (or less). The north portion of the excavation was observed to have exposed overall heights ranging between approximately 10 feet at the west and 20 feet to the east (see photo attached). Tension cracking was identified above the East/SE portion of the excavation. ESNW recommended the contractor place a soil berm at the base of the excavation on the SE corner. Berm has since been cut down to half the height. Contractor expressed plans to begin removing the rest of the berm and begin grading for the vault next week. It is the responsibility of the contractor to adhere to all state and federal safe regulations. ESNW rep will return on next week to observe soil berm removal. Report ID 4658.05 E 2023 0707 Page 2 of 3 Earth Solutions NW, LLC Report ID 4658.05 E 2023 0707 Page 3 of 3 Earth Solutions NW, LLC 7945.04 E 2023 0710.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0710 Date Mon 7/10/2023 Weather 69°F, Overcast Arrival/Departure Time(s) 1130 – 1200 Travel Time (hr) 1.25 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Chris Jacobe (206) 928 – 1597 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by the client, an ESNW representative was onsite to observe inclinometer readings. While onsite, the following was observed: Inclinometer Reading Observations: While onsite, ESNW representative observed Inclinometer readings of the slope indicator casing at the approximate Northern locations outside proposed “Tract A”. The Inclinometer casings (Slope Indicators) will continue to be observed by an ESNW representative on a daily basis. Please see attached map below for approximate location of Inclinometer casing. At the client’s request, an ESNW representative will return when needed. Report ID 7945.04 E 2023 0710 Page 2 of 2 Earth Solutions NW, LLC Inclinometer 7945.04 E 2023 0710A.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0710A Date Mon 7/10/2023 Weather 70°F Cloudy Arrival/Departure Time(s) 9:15AM; 10AM Travel Time (hr) 1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe storm main in alley 2. Storm Main Backfill Observations While onsite, ESNW rep observed backfilling of 8-foot storm main in alley 2. ESNW rep observed the side sewers to be bedded in pea gravel and backfilled with native brown sandy silt with gravel. A hoe pack was used to compact the soil in approximately 12-inch lifts. ESNW rep took compaction tests and observed adequate compaction of at least 95% of the proctor at the specific tested locations. Please see map and table below. Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 156 Storm Backfill -4 9 128.5 11.2 125.6 98 157 Storm Backfill SG 9 128.5 10.9 123.2 96 158 Storm Backfill -4 9 128.5 10.7 123.8 96 159 Storm Backfill SG 9 128.5 11.7 122.1 95 Report ID 4658.05 E 2023 0710A Page 2 of 3 Earth Solutions NW, LLC Report ID 4658.05 E 2023 0710A Page 3 of 3 Earth Solutions NW, LLC Storm Main 156,157 158,159 7945.04 E 2023 0711.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0711 Date Tue 7/11/2023 Weather 70°F, Sunny Arrival/Departure Time(s) 1200 – 1245 Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Chris Jacobe (206) 928 – 1597 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by the client, an ESNW representative was onsite to observe inclinometer readings. While onsite, the following was observed: Inclinometer Reading Observations: While onsite, ESNW representative observed Inclinometer readings of the slope indicator casing at the approximate Northern locations outside proposed “Tract A”. The Inclinometer casings (Slope Indicators) will continue to be observed by an ESNW representative on a daily basis. Please see attached map below for approximate location of Inclinometer casing. At the client’s request, an ESNW representative will return when needed. Report ID 7945.04 E 2023 0711 Page 2 of 2 Earth Solutions NW, LLC Inclinometer 7945.04 E 2023 0711A.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0711A Date Tue 7/11/2023 Weather 65°F Cloudy Arrival/Departure Time(s) 9AM; 9:45AM Travel Time (hr) 0.75 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe storm main in alley 2. Storm Main Backfill Observations While onsite, ESNW rep observed backfilling of 8-foot storm main in alley 2. ESNW rep observed the side sewers to be bedded in pea gravel and backfilled with native brown sandy silt with gravel. A hoe pack was used to compact the soil with good effort in approximately 12-inch lifts. ESNW rep took compaction tests and observed adequate compaction of at least 95% of the proctor at the specific tested locations. Please see map and table below. Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 160 Storm Backfill -4 9 128.5 11.1 123.2 96 161 Storm Backfill SG 9 128.5 12.3 121.7 95 Report ID 4658.05 E 2023 0711A Page 2 of 2 Earth Solutions NW, LLC Storm Main 160,161 7945.04 E 2023 0712.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0712 Date Wed 7/12/2023 Weather 74°F, Sunny Arrival/Departure Time(s) 1215 – 1245 Travel Time (hr) 0.75 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Chris Jacobe (206) 928 – 1597 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by the client, an ESNW representative was onsite to observe inclinometer readings. While onsite, the following was observed: Inclinometer Reading Observations: While onsite, ESNW representative observed Inclinometer readings of the slope indicator casing at the approximate Northern locations outside proposed “Tract A”. The Inclinometer casings (Slope Indicators) will continue to be observed by an ESNW representative on a daily basis. Please see attached map below for approximate location of Inclinometer casing. At the client’s request, an ESNW representative will return when needed. Report ID 7945.04 E 2023 0712 Page 2 of 2 Earth Solutions NW, LLC Inclinometer 7945.04 E 2023 0712A.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 1 Report ID 7945.04 E 2023 0712A Date Wed 7/12/2023 Weather 75°F Clear Arrival/Departure Time(s) 9:15AM; 9:45AM Travel Time (hr) 1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe vault subgrade. Vault Subgrade While onsite, ESNW rep observed the contractor had removed the remainder of the soil berm and excess spalls and fabric that were previously placed. ESNW rep used a ½” steel T-probe to probe the subgrade of the vault excavation and observed it to be dense, firm, unyielding and suitable for proposed stormwater vault. Please see image below. Report ID 4658.05 E 2023 0712A Page 2 of 3 Earth Solutions NW, LLC Report ID 4658.05 E 2023 0712A Page 3 of 3 Earth Solutions NW, LLC 7945.04 E 2023 0713.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0713 Date Thu 7/13/2023 Weather 74°F, Sunny Arrival/Departure Time(s) 1230 – 1300 Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Chris Jacobe (206) 928 – 1597 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by the client, an ESNW representative was onsite to observe inclinometer readings. While onsite, the following was observed: Inclinometer Reading Observations: While onsite, ESNW representative observed Inclinometer readings of the slope indicator casing at the approximate Northern locations outside proposed “Tract A”. The Inclinometer casings (Slope Indicators) will continue to be observed by an ESNW representative on a daily basis. Please see attached map below for approximate location of Inclinometer casing. At the client’s request, an ESNW representative will return when needed. Report ID 7945.04 E 2023 0713 Page 2 of 2 Earth Solutions NW, LLC Inclinometer 7945.04 E 2023 0713A.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0713A Date Thu 7/13/2023 Weather 75°F Clear Arrival/Departure Time(s) 9:25AM; 9:50AM Travel Time (hr) 1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe vault subgrade. Vault Subgrade While onsite, ESNW rep observed the contractor had begun placing 12” of 5/8th inch minus crushed rock on the subgrade of the vault excavation. Some groundwater has been observed flowing from the base of the excavation. Contractor will place 2”-4” quarry spalls in a swale towards the outside footing of the vault to redirect the groundwater into the footing drain of the vault. Please see image below. Report ID 4658.05 E 2023 0713A Page 2 of 3 Earth Solutions NW, LLC Report ID 4658.05 E 2023 0713A Page 3 of 3 Earth Solutions NW, LLC 7945.04 E 2023 0714.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0714 Date Fri 7/14/2023 Weather 75°F, Sunny Arrival/Departure Time(s) 1130 – 1200 Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Chris Jacobe (206) 928 – 1597 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by the client, an ESNW representative was onsite to observe inclinometer readings. While onsite, the following was observed: Inclinometer Reading Observations: While onsite, ESNW representative observed Inclinometer readings of the slope indicator casing at the approximate Northern locations outside proposed “Tract A”. The Inclinometer casings (Slope Indicators) will continue to be observed by an ESNW representative on a daily basis. Please see attached map below for approximate location of Inclinometer casing. At the client’s request, an ESNW representative will return when needed. Report ID 7945.04 E 2023 0714 Page 2 of 2 Earth Solutions NW, LLC Inclinometer