Loading...
HomeMy WebLinkAboutMFP23003591.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23003591 IVR Number: 23003591 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:07/10/2023Application Date:7227801235Parcel Number: 2826 SUNSET LN NE Permit Type:07/24/2023Issue Date:Franchise Permit Work Class:07/23/2024Expiration Date:Minor Utility Job Number: 105100337Franchise Type:Electric Description: Puget Sound Energy Electric AT V01 (318619 166715) CREW TO TRENCH ACROSS HARRINGTON PL NE TO NEW HH1 AND INSTALL NEW SECONDARY CABLE IN CONDUIT. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105100337 2842 NE SUNSET BLVD JAMES MAULDIN 253-244-4303 MFP23003591 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 7/24/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 2842 Sunset Blvd NE Renton WA 98056 USA 2832 NE Sunset Blvd Renton WA 98056 USA 1616 10 10 10 1017 17 NE 12TH ST JEFFERSON AVE NE121212 121616HARRINGTON PL NE17 17 SUNSET LN NESUNSET LN NEP03 H03 P04 M10V01HH1 HARRINGTON PL NENE 1 1 TH S T 8888 M01STREETCLOSED BARRICA D E R11-2ST R E E T CL O S E DBARRICADER1 1 - 2 R11-4R5-133ROAD CLOSEDTOTHRU TRAFFICLOCALACCESSONLYAL L E Y CL O S E D AH E A D ALLEY-CLOSED-AHD ALLEYCLOSEDAHEADALLEY-CLOSED-AHDROADCLOSEDAHEADW20-3100'100'ROADWORKAHEADW20-1ROADCLOSEDAHEADW20-310 0 ' 100 'ROADWORKAHEADW20-1R007-LBUSINESS/ RESIDENT WILL BE INFORMED OF ROAD / ALLEY CLOSURE 10 DAYS IN ADVANCE. CREW CAN MOVE (SHIFT) CONES AND EQUIPMENT IN THE EVENT OF EMERGENCY VEHICLE ACCESS. LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW UG/BOX/VAULTVault WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 10/10/2022 105100337 0 2842 NE Sunset Blvd, Renton, WA 98056 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 MFP23003591 ℄ 2825 RO W 50' 318611-166710 75 kVA 120/240V (A) PRE 11 #2ACSRCBAN N E 1 1 T H S T HARRINGTON PL NEHARRINGTON PL NEEX. ROW 40'PROPOSEDROW 60'HIG13318621-166701 100 kVA (B) ±8 0 ' 318619-166715 100 kVA 120/240V (A) J 318622-166725 318620-166726 X787 J PHONE CABLE TV 512868778 104344880 512868815 3001890674 N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Meter Owner / Developer Contact Info officeATTN: DEVCO. LLC 10900 NE 8TH ST, SUITE 1200 BELLEVUE, WA 98004 DAVID RATLIFF 425-233-6444 N Vicinity Map 47.502217, -122.180969 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. SCALE: NONE PRIMARY UNDERGROUND 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - COMMERCIAL PROJECT 9. 10. E-Mail: Cell Phone: Project Manager Contact Information: Manager:LUCAS KNAUSS 253-313-8029 LUCAS.KNAUSS@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"105100337THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 105100337 N/A N/A 512726497 N/A UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP LUCAS KNAUSS 253-313-8029 10/4/22 J. FELLER 253-204-1990 10/4/22 J. FELLER RW-RENTON SOLERA SEC. LINE EXTENSION & SET 1Ø HH 2828 SUNSET LN NE, RENTON, WA 98056 N/A N/A N/A 105100337 AS NOTED 1 OF 1 KING N/A N/A CSPSKEPM NW 9-23N-05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AJOB SITE JOB SITE SITE SPECIFIC NOTES -AT V01 318619-166715 - EXISTING VAULT & 100KVA PM 120/240V TRF TO REMAIN - CONNECT 1 RUN PSE OWNED & INSTALLED 350KCMIL TPLX AT HH1 - INSTALL NEW 13" X 24" PE HANDHOLE (6050.2000, HH13350) - INSTALL (3) #10-350 3-POS CONN. BARS (MID: 7651004) - CONNECT CUSTOMER SVC CABLE (1 RUN OF #2 TPLX) AT M01 - PSE METER DEPT. TO INSTALL 200A COMMERCIAL METER #LIGHTS SPAN SPECIFIC NOTES V01 - HH1: - INSTALL 1 SPAN 350KCMIL UG TPLX ±60' (ACTUAL:_____) 00 1"2" 00 50'100' CIRCUIT FEED ADDED: 0' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A 100 AMPS N/A 2.1KW 65A 3.6% @ V01 2.5% @ V01 PSE 1324 POLYETHELYNE HANDHOLE PLAN VIEW 2" APPROX 24" APPROX 13"ELECTRIC 4' - 0" PENTABOLT LOCK COVER 5' - 0" 15” SIDE VIEW 4" X 4" KNOCKOUT (2 PLACES) APPROX 23"APPROX 32"17" CONDUITS ENTER FROM BENEATHAT ONE END OF HANDHOLE SINGLE PHASE SECONDARY HANDHOLE EXCAVATION DETAIL Not to scale SITE PLAN SCALE: 1"=50' JOB SITE TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 40 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. MFP23003591 RESTORATION PER CITY OF RENTON STANDARDS