Conditions for Permit B17004569
Building
1 Water And Sewer Permits Are Required To Be Approved Prior To The Final Inspection For The Building.
2 All Construction, Demolition And Land Clearing Waste Must Be Recycled At A King County Licensed Or Approved
Facility, Or Taken To Regional Disposal Facilities.
3 Provide Structural Calculations At The Jobsite For Verification By The Building Inspector .
4 Authorized Hours Of Construction/Activity: 7Am-8Pm Monday Through Friday 9Am-8Pm Saturday No Work
Allowed On Sunday. Per Ordinance 4703, 2-2-1998
5 All New Residential Utility Installations (Electric, Cable, Phone, Etc.) Shall Be Installed Underground.
6 Ground Electrode System (Either 1 Or 2 Are Approved Methods): 1. An Electrode Of At Least 20 Ft Long Bare
Copper, Sized In Accordance With Nec 2. An Electrode Of 20 Ft Long #4 Rebar (Not Less Than 1/2 Inch In
Diameter) And Sized Per Nec Either One Shall Be Encased By At Least 2 Inches Of Concrete, Located Within
And Near The Bottom Of A Concrete Footing That Is In Direct Contact With The Earth, And Shall Be Installed In
All New Residential And Commercial Construction.