HomeMy WebLinkAboutWWP273456 (2)r
COPY
a WA
"&I
GI R S
S T S
Now
RH2 ENGINEERING. INC
www.rh2.com
mailbox@rh2.com
1.800.720.8052
BELLINGHAM
454 W Horton Rd
Bellingham, WA 98226
(tel) 360.676.0836
(tax) 360.676.0837
BOTHELL
12100 NE 195th St, Ste 100
Bothell, WA 98011
(let) 425.951.5400
(fax) 425.398.2774
EAST WENATCHEE
300 Simon St SE, Ste 5
East Wenatchee, WA 98802
(tel) 509,886.2900
(fax) 509.886.2313
RICHLAND
114 Columbia Point Or, Ste C
Richland, WA 99352
(let) 509.946.5181
(fax) 509.946.4630
SILVERDALE
2021 NW Myhre Rd, Ste 107
Silverdale, WA 98383
(tel) 360.698.6528
(fax) 360.698.0510
,ACOMA
One Pacific Building
621 Pacific Ave, Ste 104
Tacoma, WA 98402
(tel) 253.272.3059
(fax) 425.398.2774
December 22, 2009
Mr. Gordon Wagster
Omega Contractors, Inc.
P.O. Box 430
Duvall, WA 98019-0430
Sent Via.• Email and US Mail
RECEjVED
DEC 2 3 2009
UT �/7 j, SR EMS
Subject: City of Renton Denny's Lift Station Replacement
Substantial Completion of Contract and Punchlist
Dear Gordy:
As of December 20, 2009, all major pump station components of the Denny's Lift Station have
been installed and tested. The lift station submersible pumps are now operating automatically.
Therefore, RH2 Engineering, Inc. has determined that Omega Contractors, Inc. has substantially
completed work on the Denny's Lift Station Replacement project in accordance with the
Contract Plans. Final Acceptance of this Contract is subject to completion of the following
items.
1. Complete the attached punchlist.
2. Provide final as -built and construction records.
If you have any questions on the above items, please feel free to contact us.
Sincerer-,
RH2 ENGINEERING, INC.
Mark Miller, P.E.
Project Manger
KSK/MM/jw/sp
cc: Mr. Michael Benoit, City of Renton
Attachments: Punchlist
12/2212009 2:25:12 PM ):\Data\REN\l08-056\SDC\Project Close Out\Ltr to G Wagster re Substantial Completion and Punchlist
Items.docx
Denny's Lift Station Replacement
Mark When
Complete
Item Description
Contractor Comments
Install level transmitter and connect to the RTU
Install grate and ladder in the wetwell
Complete the installation of the sod
Remove root ball located near the light post
Install landscape paper and matching rock near the wetwell and
valve vault to match existing landscaping
Conduct testing of RTU alarms and statuses with Jim Swanson of
RH2 Engineering
Verify installation of flushing valve on both of the pumps
ns a new o be provided y the City) or use rom a
decommissioned City site) floats
r-
12/22/20092:01 PM J:\Data\REN\108-056\SDC\Project Close Out\Punchlist.xlsx
Denis Law
Mayor y City Of
J
Public Works Department - Gregg Zimmerman P. E., Administrator
October 7, 2009
�f I'VELA
Denny's
4750 Lake Washington Blvd OCT t U.9
R W 9
enton A 8056 ory r;.
U it.i r1' ,
SUBJECT: Entry Permission for Denny's Lift Station Rehabilitation Project
Dear Denny's Management:
The sewage lift station located in the Lake Washington Boulevard right-of-way adjaceni.
to your restaurant has become increasingly less reliable. In order to maintain reliable
service, the City of Renton will have a contractor do some rehabilitation and
improvements on the station. The majority of the work will be performed within City
right-of-way with all permanent improvements being in the right-of-way or within the
existing easement on your property. Work will include tasks interior to the existing
structure, excavation to install a new valve vault, and work on or around the above
ground electrical panel.
We are looking to start work on October 14, 2009, and are expecting to complete the
K work in three to four weeks.
In order to facilitate the work, the City would like to obtain permission from you to
temporarily utilize a portion of your property (as shown on the attached map) during
construction for the purpose of constructing the planned project improvements
associated with the Denn 's Lift Station Rehabilitation project.':t
The City will provide continuous access to the remaining portion of the site throughout 1 i
I!
Y construction. The City shall, upon completion of any work within the property covered
by the agreement, restore the surface of the site, and any private improvementsiz
,;,
a
disturbed or destroyed during execution of the work, as nearly as practicable to the
condition they were in immediately before commencement of the work or entry by the
City except where modified by the project plans and specifications �d.
_The City will keep the onsite property manager informed of progress and scheduling.
V.
- >r
,This agreement shall become effective upon execution by the property owner from date'"
hereof, and shall continue in affect for three (3) months unless otherwise agreed to by
both
parties.
fi
r ='`
{` Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa gov
:A _ _
! hereby authorize the City,of Renton, or its�represeritatives,
.. _n.,.� ,_._�, _. ,..._. ....._.��.. �.__..x,. �_ .�� .u� �._.__.... � . �. .
R112 ENGINEERING, INC.
CONSTRUCTION OBSERVATION REPORT
DATE: October 30, 2009 PAGE 1 OF 1
CLIENT: City of Renton
PROJECT: Denny's Lift Station Replacement
ENGINEER: RH2 Engineering, Inc.
CONTRACTOR: OMEGA
FOREMAN: Fred
CREW SIZE EQUIPMENT ON SITE
(3) OMEGA (1) Excavator
WORK IN PROGRESS:
OMEGA was on lunch break upon arrival.
DISCUSSIONS WITH CONTRACTOR:
Discussed work to date and timelines with Gordy on site. Gordy indicated that they would be setting up the
temporary bypass using a "Y" fitting at the existing force main. One branch would go to the temporary bypass
while the other branch would be for the permanent installation. He said that they expected to be excavating
for the vault on November 2°d. The vault access hatch that they are using for the lift station is larger than
anticipated, so ensuring the pipe and fitting alignments and grades are crucial; therefore, they are taking
additional time and care to ensure that all of the measurements are exact.
The gravity sewer inlet is lower than expected. Gordy was in the process of resolving why the drop
connection was so low. He indicated that he preferred to have the temporary bypass in the inside of the
existing manhole but it might be on the outside due to the depth of the gravity sewer inlet.
I told Gordy that I would stop by on Monday afternoon.
OBSERVATIONS BY: Karla Kasick TIME AT SITE: 12:30 — 12:45 pm
WEATHER: Sunny and cool TEMPERATURE: —50°F
RH2 ENGINEERING, INC.
CONSTRUCTION OBSERVATION REPORT
DATE: November 2, 2009 PAGE 1 OF 1
CLIENT: City of Renton
PROJECT: Denny's Lift Station Replacement
ENGINEER: RH2 Engineering, Inc.
CONTRACTOR: OMEGA
FOREMAN: Fred
(5) OMEGA
CREW SIZE EQUIPMENT ON SITE
(1) Excavator
(1) Dump truck
WORK IN PROGRESS:
OMEGA has just begun the excavation for the vault. Two personnel were repairing the 480V line to the
existing pump control panel.
DISCUSSIONS WITH CONTRACTOR:
Spoke to Gordy briefly on site concerning the 480V line repair. He said that while they were potholing for the
outside drop connection, they found an existing PVC conduit. They traced it back for several feet and found
that it was abandoned. They also found another PVC conduit nearby that they had mistakenly thought was the
same abandoned conduit they had been tracing. OMEGA began to take the conduit and wire out and
immediately realized that the conduit with wires went to the existing pump control panel and was active.
Gordy said that they were unsuccessful in finding the outside drop connection and were approximately 5 feet
below grade. Gordy felt that going any deeper was not worth it and he would install the temporary bypass
inside the existing manhole.
OMEGA stopped work at 3:30 for the day. Fred said that they should at the bottom of the excavation by mid-
morning on November 3`d. They will be installing the crushed rock the afternoon of November 3`d
OBSERVATIONS BY: Karla Kasick TIME AT SITE: 2:30 — 3:30 pm
WEATHER: Cloudy, rainy and cool TEMPERATURE: —50°F
.vim � \' .. •i• r '
_ 1
4 ��� I � 'I. - , / `` , • 1 � � � \ � +rah -
,l 4T# }\
.� :ram - • .:..�..
R112 ENGINEERING, INC.
CONSTRUCTION OBSERVATION REPORT
DATE: November 3, 2009 PAGE 1 OF 1
CLIENT: City of Renton
PROJECT: Denny's Lift Station Replacement
ENGINEER: RH2 Engineering, Inc.
CONTRACTOR: OMEGA
FOREMAN: Fred
(3) OMEGA
CREW SIZE EQUIPMENT ON SITE
(1) Excavator
(1) Dump truck
WORK IN PROGRESS:
OMEGA was in the process of completing the excavation for the vault. The 480V line to the pump control
panel had been temporarily repaired using PVC conduit and duck tape.
I inspected the excavation for a firm and unyielding surface. The area closest to the existing manhole was soft
and had a small amount of water. In addition, the sides of the excavation were not secure due to the sandy
material of the excavation.
DISCUSSIONS WITH CONTRACTOR:
I discussed the soft spot with Fred on site. The soft spot is outside of the area of the vault. Fred will remove
the soft material that was approximately 1 square foot. It appears that the water is coming from the manhole
through the pick hole that was only grouted on the interior of the manhole.
After I expressed my concern, OMEGA indicated that they would provide shoring in the excavation due to the
vulnerability of the sides of the excavation.
Fred pointed out that the existing force main may have a leak. Warm water is observed in the trench by
OMEGA every morning. Based on the odor, I believe that there is a leak in the line. Fred said that he had
notified the City of his concern. -
OBSERVATIONS BY: Karla Kasick TIME AT SITE: 10:40 — 11:30 am
WEATHER: Sunny and cool TEMPERATURE: —50OF
t
LSi�! 11�r
/
�' `ail •. ..
t{`
AIZ
41W
y
V
10
NL
40'
doolk—.
low
RH2 ENGINEERING, INC.
CONSTRUCTION OBSERVATION REPORT
DATE: November 12, 2009 PAGE I OF 1
CLIENT:
City of Renton
PROJECT:
Denny's Lift Station Replacement
ENGINEER:
RH2 Engineering, Inc.
CONTRACTOR:
OMEGA
FOREMAN:
Fred
CREW SIZE EQUIPMENT ON SITE
(1) OMEGA (1) Excavator
WORK IN PROGRESS:
OMEGA had installed two swing check valves and two plug valves in the new vault along with associated
piping and appurtenances. Fred indicated they had also installed a 2-inch PVC drain from the vault to the
wetwell. The tree that was located on the comer of the property has been removed. Fred indicated that City
personnel requested that he remove the tree.
DISCUSSIONS WITH CONTRACTOR:
In discussions with Fred, he indicated that they were going to install the temporary bypass system on Tuesday,
November 17`h. They were waiting for the City to complete testing on the MCC that would be completed on
Monday. OMEGA will not be on site Monday. We also discussed the existing force main leak issue. Fred
said that he has not seen any additional signs of leakage since they placed the crushed rock in the excavation.
OBSERVATIONS BY: Karla Kasick TIME AT SITE: 10:00 — 11:00 am
WEATHER: Sunny and cool TEMPERATURE: —50°F
4k,
cr
w
I
F VAW,
717
RH2 ENGINEERING, INC.
CONSTRUCTION OBSERVATION REPORT
DATE: December 1, 2009 PAGE 1 OF 1
CLIENT: City of Renton
PROJECT: Denny's Lift Station Replacement
ENGINEER: RH2 Engineering, Inc.
CONTRACTOR: OMEGA
FOREMAN: Fred
CREW SIZE EQUIPMENT ON SITE
(3) OMEGA (1) Excavator
WORK IN PROGRESS:
OMEGA was on site working on the wiring between the wetwell, vault and telemetry panel. Fred was
installing minor appurtenances in the wetwell. The temporary pump was operational. The sump pump that
OMEGA had installed was operational near the vault to keep the groundwater level low.
DISCUSSIONS WITH THE CONTRACTOR:
Fred and I discussed when he would be ready to install the permanent pumps. He said they were ready any
time and were just waiting for it to be scheduled by Gordy. I also notified Fred that the City did not want to
coat the piping in the wetwell or vault.
I spoke with Gordy on the phone an hour later. The switchover from the temporary system to the permanent
system will occur on Wednesday, December 2"d in the morning.
OBSERVATIONS BY: Karla Kasick TIME AT SITE: 2:00 — 2:35 pm
WEATHER: Sunny and cool TEMPERATURE: —450F
r p
x t �
fi-
�
Y' t
a
�. r
As,
1
• T�
RH2 ENGINEERING, INC.
CONSTRUCTION OBSERVATION REPORT
DATE: December 3, 2009 PAGE 1 OF 1
CLIENT: City of Renton
PROJECT: Denny's Lift Station Replacement
ENGINEER: RH2 Engineering, Inc.
CONTRACTOR: OMEGA
FOREMAN: Fred
CREW SIZE EQUIPMENT ON SITE
(2) OMEGA (1) Excavator
WORK IN PROGRESS:
OMEGA was on site pulling wires from the permanent Flygt pumps to the telemetry panel. The other
personnel were conducting a general clean up of the site. OMEGA has filled in the excavation as much as
possible while leaving the .vye exposed for the City.
DISCUSSIONS WITH THE CONTRACTOR:
Hector and I discussed the operation of the pumps since their installation. He indicated that he had not wired
the high level alarm to the telemetry panel but that he would complete it by the end of the day. They had
pumped the wetwell down on Wednesday evening so there would be no overnight issues with high levels.
Hector and I also discussed what alarms are required for the Flygt pumps. Jim Swanson from RH2 will be on
site in the afternoon to work with OMEGA on alarms and statuses.
I spoke with Fred on the phone concerning the coordination with the City to conduct the television inspection
the next few days. He indicated that Gordy had contacted the City for the TV inspecting.
OBSERVATIONS BV: Karla Kasick TIME AT SITE: 8:45 — 9:15 am
WEATHER: Overcast and cold TEMPERATURE: —30°F
RH2 ENGINEERING, INC.
PUMP TESTING OBSERVATION REPORT
DATE: December 8, 2009 PAGE 1 OF 1
CLIENT: City of Renton
PROJECT: Denny's Lift Station Replacement
ENGINEER: RH2 Engineering, Inc.
CONTRACTOR: OMEGA
FOREMAN: Fred
CREW SIZE EQUIPMENT ON SITE
(2) OMEGA (1) Excavator
WORK IN PROGRESS:
Gordy and Hector were on site with Jim Swanson, Mark Miller, Mike Benoit and Oscar Cantu to demonstrate
the operation of the submersible pumps. Both pumps were operated to the satisfaction of RH2. Average flow
was calculated at 305 gpm for both pumps. This flow rate is above the design flow for the station, which is
120 gpm to meet flushing velocity for the 4-inch PVC force main. Flow into the receiving manhole was
observed during pump operation. Flow at the receiving manhole was laminar. The amp draw for both pumps
when operating was well below the full load atnp rating for the 7.5 hp motors.
Test Data:
Pump 1: Pumped 34.5 inches of water or 608 gallons in 2 minutes for an average flow of 305 gpm. Last
minute was calculated at 361 gpm. The flushing valve is in operation for the first minute. Amps = 7.6.
Pump 2: Pumped 34.5 inches of water or 608 gallons in 2 minutes for an average flow of 305 gpm. Last
minute was calculated at 317 gpm. It is not believed that a flushing valve is installed on Pump 2. Amps = 7.6.
DISCUSSIONS WITH THE CONTRACTOR:
Oscar arranged for Tying of the force main on Wednesday at 1:00 pm with City staff. Omega will be on -site
to assist. Omega was planning on starting site cleanup after the completion of the Tying. Omega was
informed that the City would like them demobilized within the next week. Landscaping will need to occur
when the weather improves.
Jim Swanson worked with Hector to install the level transmitter. The pump station was running on backup
floats connected to the telemetry system. Hector has some cleanup work with the electrical and control that
will be completed next week. R112 will need to return for final testing of the instrtunentation when Omega has
completed their work. See attached checklist for testing to be completed.
Omega was unsun-e if a hushing valve was installed on both pumps. Gordy will confirm and install a second
flushing valve if necessary.
OBSERVATIONS BV: Mark Miller TIME AT SITE: 9:30 — 1:30 pm
WEATHER: Clear and cold TEMPERATURE: —30°F
MW
;5 m.Ky
mX u 4
r
„
i
�r- �:�71,1 ` a•�� a� � , $f � jet c.. �. :,
` f s
`^fi.'•�d. ,`'°"��-,yam% v3.. t
vnml�f
a
City of Renton
Denny's Lift Station
Pump Station Testing & Start-up
X = PASSED
O = FAILED
Pump Operation
Pump 1
Pump 2
Station
Telemetry
Comments
Pumps operate quietly and smoothly
x
x
Pump removal system operates smoothly
Pumps seal without leaks after removal and reset.
Pumps operate on their hydraulic curve
x
x
Above design flow.
Motor amp draw is normal when operating.
x
x
7.6 amps, which is below FLA rating of rntr.
Flowrate (GPM)
305
305
Calculated over two minutes
Pressure (PSI) at Gauee
na
na
No gauge
Head at pump (calculated)
na
na
Motor Control Panel/Telemetry
Run Light
x
x
Operation Counter
na
na
RTM
x
x
Ovenemp Alarms
Need to test
Fail
Need to test
Phase Fail Monitor is installed
x
Emergency Stop
na
na
Hand -Off -Auto
na
na
Ammeter
na
na
Voltmeter
na
na
Field Devices
Water Hvdram operates correctly
na
Check Valve Switch
Not operational. Need to test when complete.
Valve Vault Flood Switch
na
Wet Well Floats are installed correctly
x
Level Transducer is installed correctly.
Not operational. Need to test when complete.
Influent Valves open/close smoothly
na
No visible leaks on influent valves
na
Discharge valves open/close smoothly
x
x
Check- Valves open/close smoothly
x
x
Flowmeter is calibrated.
na
No flowmeter installed this contract.
Sump pump operates correctly.
na
No sump intalled this contract
Hatch Lids open and close smoothly
x
Alarms and Setpoints
Hiah Level Alarm Floats
Need to test
Emergency Pump Call Alarm
Need to test
Emergency Pump Stop Float
Need to test
Intrusion alarm system
na
Intrusion system not installed this contract.
Overflow chamber alarm
na
Generator Operations
Manual Transfer Switch operates correctly.
Need to test
Generator was connected and operates station
Need to test
Amp and voltmeter values are correct.
na
_
ATS transfers from utility to generation power,
na
ATTS�traansfers from generator to utility power.
na
I
Tested by: %J % 1 %,�.�~r. /L A U
Start-up by:
Final bv:
!2/1 II_`0n9. I1_13 AN