HomeMy WebLinkAboutWWP273678 (4)Denis -Law., 3 Mayor L City 1-1 y- - U1S �rf> Public:lNorks Department -Gregg Zimmerman P E:, Admin'istrator ; r ` July 2,.20.13 " Mr: Richard Alia: _ R, L, Alia Company - 107 Williams,Ave S. :- Renton, WA 98057. .RE: Co'ntract'Document Renton Hill Alley Sewer Replacement 2013 - Dear Me: Alia: At the.Renton-City,Countil meeting on -July 1, 2013' the Council accepted R. L. Alia Company's bid of.$188,317.'01;-for the Renton.Hill Alley Sewer'.Replacement 20131project. ` For. execution_of-the. contract, please.submit'the;following info rmation:assoo0 as possible so we can prepare the contract documents'for review'and.signature,by,tlie Mayor 1: A list of -names; addresses, phone numbers, and emergency phone numbers -for--: _ Re-sponsible dfficer, Job Foreman,,and Bonding Agenf. ; -2.' Corporation letter or resolution giving names of,those,authorized,to sign the contract and g samples of their signatures. 3. , Photocopy of you r-current.Washingion State,Contractor'slicense (not master lic`ense). 4.` - Two signed contract bonds oh.Cityof Renton forms.(enclosed);,UNDATED ; The date wiII be'filled in when signed,by.the Mayor:' ` ,5 One City ;of Reriton-.Fair,Practices Affidavit of Compliance (enclosed). & Two,sk ned contracts,.also UNDATED (enclosed). 7. One Certificate:of Insurancello' r 2013 in. accordance -with Section 1-07.18 of Ike $pecial- PrOV icidn _ Please addahe City of Renton asadditional-insured.. 8. The insurance polimcleclaration pages of all required insurance policieslobtained from the insurance carrier. After the contract information is submitted, we will need the followin` ,information;to review g {- and approve before construction can start. 'VUe would.like to have most -of- it before we schedule a.pre construction conference: If.you intend.to:use private property for material - storage or sfaging ;you will need the'a'pprovalo,f our Development Servicesbivision._'In some` 1- t . instan'tes this may include -the -need for a Temporary'Use-Permit. ,This does,not.,a.pply to storage and staging -areas within City rights of way: Renton City Hall.• 1055:South:Gradyway • Renton'Ma hington 98057 • r'entonwa.goy -Mr Alfa Page 2.of 2 Ju1y2,2013` . 1 :Provide material submittals a.s required for,the`work:involved with this°�o6 '.This will include; but not,be limited fo, mformation:on the proposed source andspecifications'of all.," materials that will be used in the project (e_g ; Pipe, Manholes;,:Eouplimgs, Castings, `. Aggregates, etc •), showing that the proposed material meets the project specifications, per: Standard `Specifications and Special 'Provlsions Section 1706 1,: Provide'any shop drawings a -ds 6m'ittals needed forttie' project perStandar'd Specifications an, Specia`I Provisions Section 1-06 , 2. ` Work -Plan Include the following items: Proposed constructionaequencingarid schedule forahe'p.roject f , b.� traffic.Control Plan 3. Tra'ffic Control Plan Thb;form is included with this letter. If you:have questions on.traffic control requirements, phease gi e meta call. •The plan Can be°reviewed snd"final, _. adjustments made at.the pre -construction conference. Please..let,me,Knowwhen you,would,like to have .the pre=coristructiori conference, We•will ,. need -to notify the:pnvate utilities and City Lnspector; so there should be a"Iead=time of at�least - one week before.the conference. Meese contact me at'425-430.7279 or ihotison@reritonwa.gov; if you have any questions. " Sint-: IY; 1 hn Hobson. Wastewater.0filitY. . Enclosures H:\File Sys\WWP.- WasteWater\WWP,27-3678- Renton HiI Alley Sewer Letter = Renton Hill Alley Sewer Replacemen't-2013:doc\JDHtp—=-•-' 001TRY of PUBLIC WORKS DEPARTMENT pI M E M O R A N D U M DATE: June 26, 2012 TO: Bonnie Walton, City Clerk FROM: John Hobson, Wastewater Utility Engineer, x7279 )� SUBJECT: Bid Award for the Renton Hill Alley Sewer Replacement 2013 Project The Public Works Department has reviewed the bids submitted for the Renton Hill Alley Sewer Replacement 2013 project and recommends that the bid be awarded to R. L. Alia Company. We are requesting that an agenda bill for "Council Concur' be prepared for the July 1, 2013, Council Meeting. The bid opening was on Tuesday, June 25, 2013. There were eleven bids received. There were was one minor error in the highest bidder's bid that did not affect the order of -the bids. -The low bidder is R. L. Alia Company with a bid of $188,317.01. The engineer's estimate was $220,607.46. The project budget amount for the Renton Hill Alley Sewer Replacement 2013 project is $1,000,000 (2013 Sanitary Sewer Replacement/Rehabilitation). The low bid for the Renton Hill Alley Sewer Replacement 2013 project is within the amount approved in the 2013 budget for this project. The project will replace approximately 859 linear feet of existing 6" diameter clay sanitary sewer with new 8" diameter PVC sewer, replace three existing brick sanitary sewer manholes with new concrete manholes and replace two existing cleanouts with new manholes. The sanitary sewer work will take place in two alleys on Renton Hill (Alley 1- between S 7th St, S 9th St, Renton Ave S and Grant Ave S and Alley 2 - between S 7th St, High Ave S, Beacon Way S and Grant Ave S). Attached for your reference, is the bid tabulation showing the engineer's estimate, the low bid, and the other bids submitted. Please contact me at x7279, if you have any questions. Attachments cc: Gregg Zimmerman, PW Administrator Lys Hornsby, Utility Systems Director Dave Christensen, Wastewater Utility Supervisor H:\File Sys\WWP - WasteWater\WWP-27-3678 Renton Hill Alley Sewer Replacement 2013\Bid Info\Award-Clerk- Renton Hill Alley Sewer Replacement 2013.doc/JDHtp AT Public Works Department - Gregg Zimmerman, P. E., Administrator RE: Contract Document — Renton Hill Alley Sewer Replacement 2013 Dear Mr. Alia: At the Renton City Council meeting on July 1, 2013, the Council accepted R. L. Alia Company's bid. of $188,317.01, for the Renton Hill Alley Sewer Replacement 2013 project. For execution of the contract, please submit the following information as soon as possible so we can prepare the contract documents for review and signature by the Mayor: 1. A list of names, addresses, phone numbers, and emergency phone numbers for: Responsible Officer, Job Foreman, and Bonding Agent. 2. Corporation letter or resolution giving names of those authorized to sign the contract and samples of their signatures. 3. Photocopy of your current Washington State Contractor's License (not master license). 4. Two signed contract bonds on City of Renton forms (encioseu), L;IND T ED. The date will be filled in when signed by.the Mayor. 5. One City of Renton Fair Practices Affidavit of Compliance (enclosed). 6. Two signed contracts, also UNDATED (enclosed). 7. One Certificate of Insurance for 2013 in accordance with Section 1-07.18 of the Special Provisions. Please add the City of Renton as additional insured. 8. The insurance policy declaration pages of all required insurance Policies obtained from the insurance carrier. After the contract information is submitted, we will need the following information to review and approve before construction can start. We would like to have most of it before we schedule a pre -construction conference. If you intend to use private property for material storage or staging you will need the approval of our Development Services Division.. In some instances this may include the need for a Temporary Use Permit. This does not apply to storage and staging areas within City rights -of -way. Renton City Hall • i 055 South Grady Way • Renton, Washington 98057 • rentonwa.gov -Mr. Alia Page 2 of 2 July 2, 2013 1. Provide material submittals as required for the work involved with this job. This will include,_but not be limited to, information on the proposed source and specifications of all materials that will be used in the project (e.g.; Pipe, Manholes, Couplings, Castings, Aggregates, etc.), showing that the proposed material meets the project specifications, per Standard Specifications and Special Provisions Section 1-06.1. Provide any shop drawings and submittals needed for the project per Standard Specifications and Special Provisions Section 1-06. 2. Work Plan. Include the following items: a. Proposed construction sequencing and schedule for the project b. Traffic Control Plan 3. Traffic Control Plan. The form is included with this letter. If you have questions on traffic control requirements, please give me a call. The plan can be reviewed and final adjustments made at the pre -construction conference. Please let me know when you would like to have the pre -construction conference. We will need to notify the private utilities and City Inspector, so there should be a lead-time of at least one week before the conference. Please contact me at 425-430-7279 or jhobson@rentonwa.gov, if you have any questions. Sincerely, Phn Hobson Wastewater Utility Enclosures H:\File Sys\WWP - WasteWater\WWP-27-3678 Renton Hill Alley Sewer Replacement 2013\Bid Info\R.L. Alia Award . Letter - Renton Hill Alley Sewer Replacement 2013.doc\JDHtp Dellis a oraw �— Clty Of ` I I City.Clerk - Bonnie I. Walton July 2, 2013 Richard L. Alia R.L. Alia Company . 107 Williams Ave. S. Renton, WA 98057 RE: Renton Hill.Alley Sewer Replacement 2013; CAG-13-114 Dear Mr. Alia: At its regular meeting of July 1, 2013 the Renton City Council accepted your bid for the above - referenced project in the amount of $188,317.01. -Please - contact John -Hobson,—Project Manager; for Submission of required documents to complete the contract. ' These may, include" proof of City and State business licenses, performance bond, and insurance certificates. Sincerely, ason A. Seth Deputy City Clerk cc: John Hobson, Project Manager Linda Weldon, Accounting Assistant Tracy Schuld, Accounting Supervisor 1055'South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 rentonwa.gov Denis Law City of Mayor U'C J City Clerk - Bonnie I. Walton July. 2; 2013 Allyson Inegersen Archer Construction, lnc. 7855 S. 206th St. Kent,.WA 98032 RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114 Dear Ms. I."negersen: At its regular meeting on July .1,_ 2013 the Renton City Council accepted the low- bid submitted by. R.L. Alia. Company for the above -referenced project in the amount of $188,317.01. Thank you for your interest and your bid. Sincerely; . ason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law- City'Of Mayor 1 `I 1 City Clerk - Bonnie I.Walton July 2, 2013 Tommy Shipman CCT Construction, Inc. 22308 State Route 410 E. Bonney Lake, WA 98022 RE: Renton. Hill Alley Sewer Replacement 2013; CAG-137114 Dear Mr. Shipman: At its regular meeting on July 1,,2013 the Renton City Council accepted the low bid submitted by R.L. Alia Company for the above -referenced project in the amount of $188,317.01. Thank you for your interest and your bid.' 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Mayor aw City Of o �. City.Clerk - Bonnie_I.Walton July2, 2013 Brad Hoffman Hoffman Construction, Inc. PO Box-845 Enumbclaw, WA 98022 RE: .Renton Hill Alley Sewer Replacement 2013; CAG-13-114 Dear Mr. Hoffman: At its regular meeting on July 1,-2013 the Renton City Council accepted the. low bid 1 submitted by R.L. Alia Company for the above -referenced project in the amount of $188,317.01. Thank you for your interest and your bid. Sincerely, Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law City Of Mayor -- City Clerk - Bonnie I. Walton July 2, 2013 Brett Lane. Laser Underground & Earthworks, Inc. 20417 87th Ave. SE Snohomish, WA 98296 RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114 Dear Mr. Lane: At its regular meeting on. July 1, 2013 the Renton City Council accepted the low bid submitted by R.L. Alia Company for the above -referenced project in the. amount of $188,317.01. Thank you for your interest and your bid: Sincerely, ason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law City Clerk -Bonnie I. Walton July 2, 2013 Douglas J. Watts Northwest- Cascade, Inc. PO Box 73399 Puyallup, WA 98373 RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114 Dear Mr. Watts: At its regular meeting on July 1, 2013 the Renton City Council accepted the low bid submitted by R.L. Ajia Company for the above -referenced project in the: amount of $188,317.01. Thank you for your interest and your bid. Sincerely, J Jason A. Seth. Deputy .City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov nis Della oaw City Of (J Y tiv} City Clerk - Bonnie I. Walton July 2, 2013 Mark Pivetta Pivetta Brothers Construction, Inc. PO Box Box 370. 1812 Pease Ave. Sumner, WA 98390 RE:. Renton Hill Alley Sewer Replacement 2013;"CAG-13-114 Dear Mr. Pivetta: At its regular "meeting on July.:1, 2013 the Renton City Council accepted", the low bid submitted by R.L. Alia Company for the above -referenced project in.the amount of $188,317.01. . Thank you for your inter"est"and your bid.: Sincerely, anon A. Seth " Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425)-430-6516 • rentonwa.gov Denis Law Mayor Cl Of _ i `! City Clerk - Bonnie I. Walton July 2, 2013 Sean Reed Reed Trucking & Excavating, Inc. 2207 Inter. Ave., Ste. A Puyallup, WA 98372 RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114 Dear Mr. Reed: At its regular meeting on July 1, 2013 the Renton City Council- accepted the low bid submitted by R.L. Alia Company for the above -referenced project in the amount of $188,317.01. . Thank you for your interest and your bid. Sincerely, Jason A. Seth ' Deputy City Clerk cc: John Hobson, Project Manager 1055.South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law . Mayor � city Of City Clerk. - Bonnie I. Walton July 2, 2013 Peter Kenney Road Construction NW, Inc. P.O. Box 188 Renton, WA 98057 RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114 Dear Mr. Kenney: At its regular meeting on July 1, 2013 the Renton City Council accepted the low bid submitted by R.L. Alia Company for the above -referenced project in the amount of $188,317.0.1. . Thank you for your interest and your bid. Sin rely, r .V� ason A. Seth Deputy:City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law city'of Mayor f j City Clerk - Bonnie I. Walton . July 2, 2013. Jarred Rodarte Rodarte Construction, Inc. 17 E. Valley Hwy East Auburn, WA 98092 RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114 Dear Mr. Rodarte: At its regular meeting on July 1, 2013 the Renton City Council accepted the low bid -- submitted by R.L. Alia Company for the above -referenced project in the amount of . $188,317.01. Thank you for your interest and your bid. Sincerely, ason A. Seth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law 4 i Mayor CityOf IN W. City Clerk. -Bonnie L Walton July 2, 2013 Donald Robisson West Coast Construction, Inc. PO Box 419 Woodinville, WA 980.72 RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114 Dear Mr. Robisson:. . At its regular meeting on July 1, 2013 the Renton City. Council accepted the low- bid submitted' by R.L. Alia Company for the above -referenced project in the amount of $188,31701. Thank you for your interest and your bid. Sincerely, - Jason A. Seth Deputy City Clerk cc: John Hobson, Project Manager, 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov CITY OF RENTON BID TABULATION SHEET PROJECT: Renton Hill Alley Sewer Replacement 2013 CAG-13-113 DATE: June 25, 2013 Page 1 of 2 FORMS Proposal & Bidder Combined L&I Bid Bid Total from Schedule of Prices Trip. Form Cert Bond *Includes Sales Tax Ur Archer Construction, Inc. 7855 S. 206th St. L / Z[v 7 25 ., 2'3 Kent, WA 98032 l// 0 CCT Construction, Inc. 22308 State Route 410 E. Bonney Lake, WA 98391 Hoffman Construction, Inc. PO Box 845 �/ Z 3 31 4. Enumclaw, WA 98022 f Laser Underground & Earthworks, Inc. 20417 87th Ave. SE ✓ „/ ZQ¢ (pO / [ ` Snohomish, WA 98296 l:'; Northwest Cascade, Inc. PO Box 73399 t i % ��13P Puyallup, WA 98373 a Pivetta Brothers Construction, Inc. PO Box 370 - 1812 Pease Ave. Sumner, WA 98390 Reed Trucking & Excavating, Inc. 2207 Inter Ave. Ste. A ✓ ' Z �1 3_ rG. Puyallup, WA 98372 (over) CITY OF RENTON BID TABULATION SHEET PROJECT: Renton Hill Alley Sewer Replacement 2013 CAG-13-113 DATE: June 25, 2013 Page 2 of 2 FORMS Proposal & Bidder Combined L&I Bid Bid Total from Schedule of Prices Trip. Form Cert Bond *Includes Sales Tax R.L. Alia Company 107 Williams Ave. S. L� ✓ �� �%j' ?1 7. 6 Renton, WA 98057 Road Construction Northwest, Inc. PO Box 1884- Renton, WA 98057 Rodarte Construction, Inc. Cam% 17 E. Valley Hwy East ✓� ✓ -Z Auburn, WA 98092 West Coast Construction, Inc. PO Box 419 �/ ✓ ✓ Z ,Q- Z3 Woodinville, WA 98072 / �"'� Engineer's Estimate $220,607.46 PES CUES, Inc. 3600 Rio Vista Ave. Orlando, FL 32805 (407) 849-0190 Fax (407) 425-1569 Site Data for Project: 5320W Site ID City Street Date Time 22 Renton S9thSt@AIIeyWay 11 05/24/2011 12:21:36 PM M.H. Start 5320009 M.H. Stop M.H. Depth Starting Dist Final Dist 5320830 7.9 8.0 202.7 Type of Pipe Pipe Size(in) Sec. Igth Direction Surface Condition Operator Cla F 6 0 Away-U aved Asphalt Rocky Comment Observation Data Obs ID Dist LD Code / Defect ClockPos Sew Lv Ph1 ID Ph2 ID VcIipID VidID TapeCnt Comment 1 8.0 INSPECTION BEGIN DOWNSTREAM 54.37 2 51.7 CONNECTION FACTORY RIGHT 138.31 ok 3 74.3 CRACK MULTIPLE 12 235.19 4 83.2 roots@ joint 286.75 5 127.9 CONNECTION FACTORY RIGHT 457.52 6 130.8 ROOTS IN JOINT LIGHT 545.36 7 132.4 CONNECTION ABANDONED RIGHT 610.90 capped off 8 143.0 ROOTS IN JOINT LIGHT 653.43 9 147.2 ROOTS IN JOINT LIGHT 675.33 10 200.6 CONNECTION FACTORY RIGHT 908.43 ok 11 202.7 C/0#803 1013.80 Page 1 of 1 1E] CUES CUES, Inc. 3600 Rio Vista Ave. Orlando, FL 32805 (407) 849-0190 Fax (407) 425-1569 Site Data for Project: 5320W Site ID City Street Date Time 42 Renton 1315 S.7thST 11 06/22/2011 11 09:20:21 AM M.H. Start M.H. Stop M.H. Depth Starting Dist Final Dist 5320221 Type of Pipe 5320829 1 4.4 0 +353.1 Pipe Size(in) Sec. Igth Direction Surface Condition Operator Clay 6 11 31 Away-U Paved Asphalt Rocky Comment Observation Data Obs ID Dist LD Code / Defect ClockPos Sevr Lv Ph1 ID Ph2 ID VcIipID VidlD TapeCnt Comment 1 0 Looking down manhole 83.15 2-12" 1-6" pipes in brick MH#221 2 8.0 INSPECTION BEGIN DOWNSTREAM 148.32 3 16.0 PIPE MATERIAL CHANGE TO PVC 224.18 4 20.3 PIPE MATERIAL CHANGE TO VCP 277.89 5 37.8 lite roots 297.87 6 38.9 ROOTS IN JOINT LIGHT 321.59 7 46.5 CONNECTION ABANDONED LEFT 09 363.70 capped off 8 51.2 ROOTS IN JOINT LIGHT 405.90 9 61.5 ROOTS IN JOINT LIGHT 448.20 10 67.8 ROOTS IN JOINT LIGHT 480.46 11 69.8 ROOTS IN JOINT LIGHT 497.98 12 75.9 ROOTS IN JOINT LIGHT 523.36 13 78.1 ROOTS IN JOINT LIGHT 543.65 Page 1 of 4 C CUES CUES, Inc. 3600 Rio Vista Ave. Orlando, FL 32805 (407) 849-0190 Fax (407) 425-1569 Site Data for Project: 5320W Site ID City Street Date Time 42 Renton 1315 S.7thST 06/22/2011 09:20:21 AM M.H. Start 5320221 Type of Pipe M.H. Stop M.H. Depth Starting Dist Final Dist 5320829 4.4 0 +353.1 Pipe Size(in) Sec. Igth Direction Surface Condition Operator Cla E 6 11 31 Away-U Paved Asphalt 1FRocky Comment Observation Data Obs ID Dist LID Code / Defect ClockPos Sevr Lv Phl ID Ph2 ID VcIipID VidID TapeCnt Comment 14 82.2 ROOTS IN JOINT MEDIUM 568.59 15 86.5 ROOTS IN JOINT MEDIUM 598.49 16 88.4 ROOTS IN JOINT MEDIUM 666.92 17 90.5 ROOTS IN JOINT LIGHT 682.23 18 92.6 ROOTS IN JOINT LIGHT 699.16 19 94.6 ROOTS IN JOINT LIGHT 720.16 20 96.6 ROOTS IN JOINT MEDIUM 754.72 21 100.8 ROOTS IN JOINT LIGHT 779.22 22 104.7 ROOTS IN JOINT LIGHT 805.28 23 107.1 ROOTS IN JOINT LIGHT 823.59 24 109.2 ROOTS IN JOINT MEDIUM 845.29 25 109.5 PIPE DETERIORATED 03 881.07 26 111.3 ROOTS IN JOINT LIGHT 916.50 Page 2 of 4 C CUES CUES, Inc. 3600 Rio Vista Ave. Orlando, FL 32805 (407) 849-0190 Fax (407) 425-1569 Site Data for Project: 5320W Site ID City Street Date Time 42 Renton 1315 S.7thST 06/22/2011 09:20:21 AM M.H. Start 5320221 M.H. Stop M.H. Depth Starting Dist Final Dist 5320829 4.4 0 +353.1 Type of Pipe Pipe Size(in) Sec. Igth Direction Surface Condition Operator Clay 6 0 Away U aved Asphalt Rocky Comment Observation Data Obs ID Dist LD . Code / Defect ClockPos Sevr Lv Phl ID P112 ID VcIipID VidID TapeCnt Comment 27 113.3 ROOTS IN JOINT LIGHT 951.52 28 121.2 CAMERA SUBMERGED 1045.88 29 125.6 ROOTS IN JOINT LIGHT 1070.06 30 127.6 ROOTS IN JOINT LIGHT 1097.01 31 129.6 ROOTS IN JOINT LIGHT 1154.01 32 131.7 ROOTS IN JOINT LIGHT 1176.69 33 135.9 ROOTS IN JOINT LIGHT 1200.99 34 142.2 ROOTS IN JOINT LIGHT 1225.74 35 144.2 ROOTS IN JOINT MEDIUM 1242.53 36 146.2 ROOTS IN JOINT LIGHT 1266.63 37 146.6 PIPE DETERIORATED 1295.69 38 148.3 ROOTS IN JOINT LIGHT 1319.53 39 150.3 ROOTS IN JOINT LIGHT 1347.39 Page 3 of 4 C C lJ E E CUES, Inc. 3600 Rio Vista Ave. Orlando, FL 32805 (407) 849-0190 Fax (407) 425-1569 Site Data for Project: 5320W Site ID City Street Date Time 42 Renton 1315 S.7thST 06/22/2011 09:20:21 AM M.H. Start 5320221 M.H. Stop M.H. Depth Starting Dist Final Dist 5320829 4.4 0 +353.1 Type of Pipe Pipe Size(in) Sec. Igth Direction Surface Condition Operator Clay 6 0 Away U aved Asphalt Rocky Comment Observation Data Obs ID Dist LD Code / Defect ClockPos Sevr Lv Phi ID Ph2 ID Vc1ipID VidID TapeCnt Comment 40 152.5 ROOTS IN JOINT MEDIUM 1365.11 41 162.8 ROOTS IN JOINT MEDIUM 1398.55 42 164.8 ROOTS IN JOINT LIGHT 1419.95 43 168.3 CONNECTION FACTORY RIGHT 09 1472.99 roots in connection 44 188.0 PIPE DETERIORATED 03 1553.24 45 201.7 CONNECTION FACTORY LEFT 09 1611.06 46 _ 216.8 damaged pipe 09 /03 1736.89 top gone root growing 47 218.4 CONNECTION BREAK-IN RIGHT 03 1218347.jp 1791.94 roots 48 278.2 CONNECTION FACTORY LEFT 09 2109.23 49 350.6 CONNECTION FACTORY LEFT 09 2249.15 50 352.8 C/0#829 12 2287.84 51 353.1 E.O.P. 2316.12 52 353.1 INSPECTION END UPSTREAM 2331.94 Page 4 of 4 CUES, Inc. 3600 Rio Vista Ave. Orlando, FL 32805 (407) 849-0190 Fax (407) 425-1569 Site Data for Project: 5320W Site ID City Street Date Time 33 Renton 1403 High AV S 06/08/2011 J 08:26:25 AM M.H. Start 5320219 M.H. Stop M.H. Depth Starting Dist Final Dist 5317824 9.6 8.0 +327.4 Type of Pipe Pipe Size(in) Sec. Igth Direction Surface Condition Operator Clay 6 11 2 Away-U Ikiley Way Rocky Comment Observation Data Obs ID Dist LID Code / Defect ClockPos Sew Lv Phl ID Ph2 ID VcIipID MID TapeCnt Comment 1 8.0 INSPECTION BEGIN DOWNSTREAM 34.20 2 74.5 CONNECTION FACTORY RIGHT 02 255.58 3 165.0 CONNECTION FACTORY LEFT 09 341.07 s/s seperated @ connction top 4 118.0 CONNECTION BREAK-IN RIGHT 01 468.89 light crack from breakin 5 171.2 CONNECTION ABANDONED RIGHT 03 643.88 capped off 6 178.4 CONNECTION BREAK-IN RIGHT 03 742.89 cracks around connection 7 197.9 CONNECTION ABANDONED RIGHT 03 866.68 capped off 8 228.5 CONNECTION ABANDONED RIGHT 03 942.42 capped off 9 253.4 CONNECTION FACTORY RIGHT 02/03 1011.54 10 288.2 CONNECTION ABANDONED RIGHT 03 1095.31 capped off 11 292.6 PIPE MATERIAL CHANGE TO RCP 1215311.ip 1161.11 hole in concrete pipe 12 293.9 CONNECTION FACTORY RIGHT 03 1240.24 13 294.8 PIPE MATERIAL CHANGE TO VCP 1265.38 cracks in clay Page 1 of 2 1 IE: C U E ;4 Site Data for Project: 5320W CUES, Inc. 3600 Rio Vista Ave. Orlando, FL 32805 (407) 849-0190 Fax (407) 425-1569 Site ID City Street Date Time 33 Renton 1403 High AV S 06/08/2011 08:26:25 AM M.H. Start 5320219 M.H. Stop M.H. Depth Starting Dist Final Dist 5317824 9.6 8.0 +327.4 Type of Pipe Pipe Size(in) Sec. Igth Direction Surface Condition Operator Clay 6 0 Away U Iley Way Rocky Comment Observation Data Obs ID Dist LID Code / Defect ClockPos Sevr Lv Phl ID Ph2 ID VcIipID VidID TapeCnt Comment 14 298.8 JOINT CRACKED 1364.08 15 325.3 CONNECTION BREAK-IN RIGHT 03 1499-31 main cracked from tapp capped off 16 326.8 CONNECTION FACTORY LEFT 10/11 1591.61 capped off 17 327.4 INSPECTION END UPSTREAM 1634.67 Page 2 of 2 educate train ... �M 7 h C� 4A r, , 337. E "'.5 - /(ve =&-'71 zer, .. i A*H c's;[.= M bEYTt-1 = qr:? i x 4 .'71 ,� ,� = z�s Cy !`►� 3 ' 4 �co elf 4 = 9 4 � .(�.6 - 4 3?� Ltis'i7- E x z.33 349 = lei cy A') t.f Ezp•,r = Z 7 f��o0al8lvly DATA Number Unit Description Quantity Unit Cost Engineer's Estimate 1 Lump Sum Mobilization & Demobilization 1 $19,800.00 $19,800.00 2 Lump Sum Trench Excavation Safety Systems 1 $2,000.00 $2,000.00 3 Lump Sum Construction Surveying, Staking, and As-Builts 1 $5,000.00 $5,000.00 4 Lump Sum Traffic Control 1 $5,000.00 $5,000.00 5 Lump Sum Temporary Erosion/Sedimentation Controls 1 $1,000.00 $1,000.00 6 Lump Sum Landscape Restoration 1 $1,000.00 $1,000.00 7 Linear Foot Television Inpsection of Sanitary Sewers 859 $2.00 $1,718.00 8 Linear Foot Furnish and Install 8-inch PVC Sewer Pipe 859 $100.00 $85,900.00 9 Each Furnish and Install 54-inch Diam. Sanitary Sewer Manhole 4 $4,500.00 $18,000.00 10 Each Furnish and Install Shallow Sanitary Sewer Manhole 1 $4,500.00 $4,500.00 11 Each Furnish and Install Sanitary Sewer Cleanout 1 $1,500.00 $1,500.00 12 Ton Removal and Replacement of Unsuitable Foundation Material 50 $25.00 1, $1,250.00 13 Ton Select Import Trench Backfill 1,300 $25.00 Zl $32,500.00 14 Ton Crushed Surfacing Top Course 340 $35.00 $11,900.00 15 Square Yard! Asphalt Patch 160 $65.00 SS $10,400.00 Sub Total $201,468.00 Sales Tax $19,139.46 Total $220,607.46 Page 1 REPROGRAPHICS NORTHWEST LLC 616 8th Avenue South 1850 130" Avenue NE 632 Broadway Seattle, WA 98104 Bellevue, WA 98005 Tacoma, WA 98402 Tel:206-624-2040 Tel:425-883-1110 Tel:253-383-6363 Fax:206-382-4397 Fax:425-883-8590 Fax:253-272-4064 Dispatch:206-682-4040 Dispat6h:425-882-2426 Dispatch:253-274-1817 WORK ORDER FORM No. 97731 P.O. No. Date: /�-1,4y 31. Zni JOB No. LILIP- Z7^3(e?-(61 Date Due: Project Title: LYA.b live" Li�r�i-a �7®,✓ /�jAeFraE:xo - Time Due: 2 %4e9 Pi%-J ❑ Reimbursable ❑ Non -Reimbursable 16900 CITY OF RENTON UTILITIES SYSTEMS DIV_- 1055 S GRADY RE:NTON WA 98055 Ordered By: Phone No: 4-05" 4-3e *7Z79 Prints To: Originals To: %_�sia/ 4YcF?Sr�,/ r- y Attn: Attn: ❑ Retain in Digital Vault ❑ Upload to Planwell ❑ Revise Digital Vault CODE ORIG SETS DESCRIPTION BINDING: X STAPLE ❑ EDGE BIND ❑ CHICAGO SCREW ❑ LOOSE Special Instructions DIGITAL I COPY CENTER ❑ WHITE BOND ❑ 6.5x11 ONE SIDED ❑ COLOR BOND ❑ 8.5X 11 TWO SIDED ❑ 'VELLUM ❑ 11xl7 ONE SIDED ❑ MYLAR ❑ 11X17 TWO SIDED ❑ CLEAR FILM ❑ COVERSTOCK ❑ RECYCED STOCK ❑ RECYCLED STOCK ❑ OTHER PLOTTING • BINDERY AUTOCAD ❑ PLT Night Phone: /J /A ElDWF ❑ G C LE PUNCH % ❑ CHICAGO SCREW ® Deliver ❑ Will Call Ship Via •MICROSTATI0 ❑ WIRE �IC PLOT ❑ PLASTIC Kou COLOR SCANNING SFC SMALL FORMAT COLOR SFS SMALL FORMAT SCANNING ❑ LASER PAPER ❑ COLOR ❑ LASER COVER STOCK ❑ BLACK Et WHITE ❑ RECYCLED STOCK LFS LARGE FORMAT SCANNING LFC LARGE FORMAT COLOR ❑ COLOR ❑ HI-RES 35# PAPER ❑ BLACK Et WHITE ❑ LO-RES 35# PAPER ❑ BURN TO CD ❑ HI-RES PRESENTATION BOND ❑ UPLOAD TO FTP ❑ Lo-RES PRESENTATION BOND El ARCHIVE SCANNING ❑ SIGNS/BANNERS MOUNTING LAMINATING ❑ WHITE FOAM CORE ❑ LAMINATING ❑ BLACK FOAM CORE 3 MIL / 5 MIL / 10 MIL ❑ WHITE GATORBOARD ❑ BLACK GATORBOARD ❑ UV PROTECTIVE ❑ BOARD INVOICE TERMS: NET 30 DAYS 1% FINANCE CHARGE PER MONTH ON PAST DUE BALANCES