HomeMy WebLinkAboutWWP273678 (4)Denis -Law., 3
Mayor L City 1-1 y-
- U1S �rf>
Public:lNorks Department -Gregg Zimmerman P E:, Admin'istrator ;
r
` July 2,.20.13 "
Mr: Richard Alia:
_ R, L, Alia Company -
107 Williams,Ave S. :-
Renton, WA 98057.
.RE: Co'ntract'Document Renton Hill Alley Sewer Replacement 2013 -
Dear Me: Alia:
At the.Renton-City,Countil meeting on -July 1, 2013' the Council accepted R. L. Alia Company's
bid of.$188,317.'01;-for the Renton.Hill Alley Sewer'.Replacement 20131project.
` For. execution_of-the. contract, please.submit'the;following info rmation:assoo0 as possible so
we can prepare the contract documents'for review'and.signature,by,tlie Mayor
1: A list of -names; addresses, phone numbers, and emergency phone numbers -for--: _
Re-sponsible dfficer, Job Foreman,,and Bonding Agenf. ;
-2.' Corporation letter or resolution giving names of,those,authorized,to sign the contract and g
samples of their signatures.
3. , Photocopy of you r-current.Washingion State,Contractor'slicense (not master lic`ense).
4.` - Two signed contract bonds oh.Cityof Renton forms.(enclosed);,UNDATED ;
The date wiII be'filled in when signed,by.the Mayor:' `
,5 One City ;of Reriton-.Fair,Practices Affidavit of Compliance (enclosed).
& Two,sk ned contracts,.also UNDATED (enclosed).
7. One Certificate:of Insurancello' r 2013 in. accordance -with Section 1-07.18 of Ike $pecial-
PrOV icidn _ Please addahe City of Renton asadditional-insured..
8. The insurance polimcleclaration pages of all required insurance policieslobtained from the
insurance carrier.
After the contract information is submitted, we will need the followin` ,information;to review
g {-
and approve before construction can start. 'VUe would.like to have most -of- it before we
schedule a.pre construction conference: If.you intend.to:use private property for material -
storage or sfaging ;you will need the'a'pprovalo,f our Development Servicesbivision._'In some`
1- t .
instan'tes this may include -the -need for a Temporary'Use-Permit. ,This does,not.,a.pply to storage
and staging -areas within City rights of way:
Renton City Hall.• 1055:South:Gradyway • Renton'Ma hington 98057 • r'entonwa.goy
-Mr Alfa
Page 2.of 2
Ju1y2,2013` .
1 :Provide material submittals a.s required for,the`work:involved with this°�o6 '.This will
include; but not,be limited fo, mformation:on the proposed source andspecifications'of all.,"
materials that will be used in the project (e_g ; Pipe, Manholes;,:Eouplimgs, Castings, `.
Aggregates, etc •), showing that the proposed material meets the project specifications, per:
Standard `Specifications and Special 'Provlsions Section 1706 1,: Provide'any shop drawings
a -ds 6m'ittals needed forttie' project perStandar'd Specifications an, Specia`I Provisions
Section 1-06 ,
2. ` Work -Plan Include the following items:
Proposed constructionaequencingarid schedule forahe'p.roject
f ,
b.� traffic.Control Plan
3. Tra'ffic Control Plan Thb;form is included with this letter. If you:have questions on.traffic
control requirements, phease gi e meta call. •The plan Can be°reviewed snd"final, _.
adjustments made at.the pre -construction conference.
Please..let,me,Knowwhen you,would,like to have .the pre=coristructiori conference, We•will
,.
need -to notify the:pnvate utilities and City Lnspector; so there should be a"Iead=time of at�least -
one week before.the conference.
Meese contact me at'425-430.7279 or ihotison@reritonwa.gov; if you have any questions. "
Sint-: IY;
1 hn Hobson.
Wastewater.0filitY. .
Enclosures
H:\File Sys\WWP.- WasteWater\WWP,27-3678- Renton HiI Alley Sewer
Letter = Renton Hill Alley Sewer Replacemen't-2013:doc\JDHtp—=-•-'
001TRY of
PUBLIC WORKS DEPARTMENT pI
M E M O R A N D U M
DATE: June 26, 2012
TO: Bonnie Walton, City Clerk
FROM: John Hobson, Wastewater Utility Engineer, x7279 )�
SUBJECT: Bid Award for the Renton Hill Alley Sewer Replacement 2013
Project
The Public Works Department has reviewed the bids submitted for the Renton Hill Alley
Sewer Replacement 2013 project and recommends that the bid be awarded to R. L. Alia
Company. We are requesting that an agenda bill for "Council Concur' be prepared for
the July 1, 2013, Council Meeting.
The bid opening was on Tuesday, June 25, 2013. There were eleven bids received.
There were was one minor error in the highest bidder's bid that did not affect the order
of -the bids. -The low bidder is R. L. Alia Company with a bid of $188,317.01. The
engineer's estimate was $220,607.46.
The project budget amount for the Renton Hill Alley Sewer Replacement 2013 project is
$1,000,000 (2013 Sanitary Sewer Replacement/Rehabilitation). The low bid for the
Renton Hill Alley Sewer Replacement 2013 project is within the amount approved in the
2013 budget for this project.
The project will replace approximately 859 linear feet of existing 6" diameter clay
sanitary sewer with new 8" diameter PVC sewer, replace three existing brick sanitary
sewer manholes with new concrete manholes and replace two existing cleanouts with
new manholes. The sanitary sewer work will take place in two alleys on Renton Hill
(Alley 1- between S 7th St, S 9th St, Renton Ave S and Grant Ave S and Alley 2 - between
S 7th St, High Ave S, Beacon Way S and Grant Ave S).
Attached for your reference, is the bid tabulation showing the engineer's estimate, the
low bid, and the other bids submitted.
Please contact me at x7279, if you have any questions.
Attachments
cc: Gregg Zimmerman, PW Administrator
Lys Hornsby, Utility Systems Director
Dave Christensen, Wastewater Utility Supervisor
H:\File Sys\WWP - WasteWater\WWP-27-3678 Renton Hill Alley Sewer Replacement 2013\Bid Info\Award-Clerk-
Renton Hill Alley Sewer Replacement 2013.doc/JDHtp
AT
Public Works Department - Gregg Zimmerman, P. E., Administrator
RE: Contract Document — Renton Hill Alley Sewer Replacement 2013
Dear Mr. Alia:
At the Renton City Council meeting on July 1, 2013, the Council accepted R. L. Alia Company's
bid. of $188,317.01, for the Renton Hill Alley Sewer Replacement 2013 project.
For execution of the contract, please submit the following information as soon as possible so
we can prepare the contract documents for review and signature by the Mayor:
1. A list of names, addresses, phone numbers, and emergency phone numbers for:
Responsible Officer, Job Foreman, and Bonding Agent.
2. Corporation letter or resolution giving names of those authorized to sign the contract and
samples of their signatures.
3. Photocopy of your current Washington State Contractor's License (not master license).
4. Two signed contract bonds on City of Renton forms (encioseu), L;IND T ED.
The date will be filled in when signed by.the Mayor.
5. One City of Renton Fair Practices Affidavit of Compliance (enclosed).
6. Two signed contracts, also UNDATED (enclosed).
7. One Certificate of Insurance for 2013 in accordance with Section 1-07.18 of the Special
Provisions. Please add the City of Renton as additional insured.
8. The insurance policy declaration pages of all required insurance Policies obtained from the
insurance carrier.
After the contract information is submitted, we will need the following information to review
and approve before construction can start. We would like to have most of it before we
schedule a pre -construction conference. If you intend to use private property for material
storage or staging you will need the approval of our Development Services Division.. In some
instances this may include the need for a Temporary Use Permit. This does not apply to storage
and staging areas within City rights -of -way.
Renton City Hall • i 055 South Grady Way • Renton, Washington 98057 • rentonwa.gov
-Mr. Alia
Page 2 of 2
July 2, 2013
1. Provide material submittals as required for the work involved with this job. This will
include,_but not be limited to, information on the proposed source and specifications of all
materials that will be used in the project (e.g.; Pipe, Manholes, Couplings, Castings,
Aggregates, etc.), showing that the proposed material meets the project specifications, per
Standard Specifications and Special Provisions Section 1-06.1. Provide any shop drawings
and submittals needed for the project per Standard Specifications and Special Provisions
Section 1-06.
2. Work Plan. Include the following items:
a. Proposed construction sequencing and schedule for the project
b. Traffic Control Plan
3. Traffic Control Plan. The form is included with this letter. If you have questions on traffic
control requirements, please give me a call. The plan can be reviewed and final
adjustments made at the pre -construction conference.
Please let me know when you would like to have the pre -construction conference. We will
need to notify the private utilities and City Inspector, so there should be a lead-time of at least
one week before the conference.
Please contact me at 425-430-7279 or jhobson@rentonwa.gov, if you have any questions.
Sincerely,
Phn Hobson
Wastewater Utility
Enclosures
H:\File Sys\WWP - WasteWater\WWP-27-3678 Renton Hill Alley Sewer Replacement 2013\Bid Info\R.L. Alia Award .
Letter - Renton Hill Alley Sewer Replacement 2013.doc\JDHtp
Dellis
a oraw �— Clty Of `
I I
City.Clerk - Bonnie I. Walton
July 2, 2013
Richard L. Alia
R.L. Alia Company .
107 Williams Ave. S.
Renton, WA 98057
RE: Renton Hill.Alley Sewer Replacement 2013; CAG-13-114
Dear Mr. Alia:
At its regular meeting of July 1, 2013 the Renton City Council accepted your bid for the above -
referenced project in the amount of $188,317.01.
-Please - contact John -Hobson,—Project Manager; for Submission of required documents to
complete the contract. ' These may, include" proof of City and State business licenses,
performance bond, and insurance certificates.
Sincerely,
ason A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager
Linda Weldon, Accounting Assistant
Tracy Schuld, Accounting Supervisor
1055'South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 rentonwa.gov
Denis Law
City of
Mayor U'C
J
City Clerk - Bonnie I. Walton
July. 2; 2013
Allyson Inegersen
Archer Construction, lnc.
7855 S. 206th St.
Kent,.WA 98032
RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114
Dear Ms. I."negersen:
At its regular meeting on July .1,_ 2013 the Renton City Council accepted the low- bid
submitted by. R.L. Alia. Company for the above -referenced project in the amount of
$188,317.01.
Thank you for your interest and your bid.
Sincerely; .
ason A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law- City'Of Mayor 1 `I 1
City Clerk - Bonnie I.Walton
July 2, 2013
Tommy Shipman
CCT Construction, Inc.
22308 State Route 410 E.
Bonney Lake, WA 98022
RE: Renton. Hill Alley Sewer Replacement 2013; CAG-137114
Dear Mr. Shipman:
At its regular meeting on July 1,,2013 the Renton City Council accepted the low bid
submitted by R.L. Alia Company for the above -referenced project in the amount of
$188,317.01.
Thank you for your interest and your bid.'
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Mayor aw City Of o
�.
City.Clerk - Bonnie_I.Walton
July2, 2013
Brad Hoffman
Hoffman Construction, Inc.
PO Box-845
Enumbclaw, WA 98022
RE: .Renton Hill Alley Sewer Replacement 2013; CAG-13-114
Dear Mr. Hoffman:
At its regular meeting on July 1,-2013 the Renton City Council accepted the. low bid 1
submitted by R.L. Alia Company for the above -referenced project in the amount of
$188,317.01.
Thank you for your interest and your bid.
Sincerely,
Jason A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law City Of
Mayor
--
City Clerk - Bonnie I. Walton
July 2, 2013
Brett Lane.
Laser Underground & Earthworks, Inc.
20417 87th Ave. SE
Snohomish, WA 98296
RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114
Dear Mr. Lane:
At its regular meeting on. July 1, 2013 the Renton City Council accepted the low bid
submitted by R.L. Alia Company for the above -referenced project in the. amount of
$188,317.01.
Thank you for your interest and your bid:
Sincerely,
ason A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law
City Clerk -Bonnie I. Walton
July 2, 2013
Douglas J. Watts
Northwest- Cascade, Inc.
PO Box 73399
Puyallup, WA 98373
RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114
Dear Mr. Watts:
At its regular meeting on July 1, 2013 the Renton City Council accepted the low bid
submitted by R.L. Ajia Company for the above -referenced project in the: amount of
$188,317.01.
Thank you for your interest and your bid.
Sincerely,
J
Jason A. Seth.
Deputy .City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
nis
Della oaw City Of (J
Y tiv}
City Clerk - Bonnie I. Walton
July 2, 2013
Mark Pivetta
Pivetta Brothers Construction, Inc.
PO Box Box 370.
1812 Pease Ave.
Sumner, WA 98390
RE:. Renton Hill Alley Sewer Replacement 2013;"CAG-13-114
Dear Mr. Pivetta:
At its regular "meeting on July.:1, 2013 the Renton City Council accepted", the low bid
submitted by R.L. Alia Company for the above -referenced project in.the amount of
$188,317.01. .
Thank you for your inter"est"and your bid.:
Sincerely,
anon A. Seth "
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425)-430-6516 • rentonwa.gov
Denis Law Mayor Cl Of
_ i `!
City Clerk - Bonnie I. Walton
July 2, 2013
Sean Reed
Reed Trucking & Excavating, Inc.
2207 Inter. Ave., Ste. A
Puyallup, WA 98372
RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114
Dear Mr. Reed:
At its regular meeting on July 1, 2013 the Renton City Council- accepted the low bid
submitted by R.L. Alia Company for the above -referenced project in the amount of
$188,317.01. .
Thank you for your interest and your bid.
Sincerely,
Jason A. Seth
' Deputy City Clerk
cc: John Hobson, Project Manager
1055.South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law .
Mayor � city Of
City Clerk. - Bonnie I. Walton
July 2, 2013
Peter Kenney
Road Construction NW, Inc.
P.O. Box 188
Renton, WA 98057
RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114
Dear Mr. Kenney:
At its regular meeting on July 1, 2013 the Renton City Council accepted the low bid
submitted by R.L. Alia Company for the above -referenced project in the amount of
$188,317.0.1. .
Thank you for your interest and your bid.
Sin rely,
r .V�
ason A. Seth
Deputy:City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law city'of
Mayor f
j
City Clerk - Bonnie I. Walton .
July 2, 2013.
Jarred Rodarte
Rodarte Construction, Inc.
17 E. Valley Hwy East
Auburn, WA 98092
RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114
Dear Mr. Rodarte:
At its regular meeting on July 1, 2013 the Renton City Council accepted the low bid --
submitted by R.L. Alia Company for the above -referenced project in the amount of .
$188,317.01.
Thank you for your interest and your bid.
Sincerely,
ason A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law 4 i Mayor CityOf
IN
W.
City Clerk. -Bonnie L Walton
July 2, 2013
Donald Robisson
West Coast Construction, Inc.
PO Box 419
Woodinville, WA 980.72
RE: Renton Hill Alley Sewer Replacement 2013; CAG-13-114
Dear Mr. Robisson:. .
At its regular meeting on July 1, 2013 the Renton City. Council accepted the low- bid
submitted' by R.L. Alia Company for the above -referenced project in the amount of
$188,31701.
Thank you for your interest and your bid.
Sincerely, -
Jason A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager,
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
CITY OF RENTON
BID TABULATION SHEET
PROJECT: Renton Hill Alley Sewer Replacement 2013
CAG-13-113
DATE: June 25, 2013
Page 1 of 2
FORMS
Proposal &
Bidder
Combined
L&I
Bid
Bid Total from Schedule of Prices
Trip. Form
Cert
Bond
*Includes Sales Tax
Ur
Archer Construction, Inc.
7855 S. 206th St.
L
/
Z[v 7 25 ., 2'3
Kent, WA 98032
l//
0
CCT Construction, Inc.
22308 State Route 410 E.
Bonney Lake, WA 98391
Hoffman Construction, Inc.
PO Box 845
�/
Z 3 31 4.
Enumclaw, WA 98022
f
Laser Underground & Earthworks, Inc.
20417 87th Ave. SE
✓
„/
ZQ¢ (pO / [ `
Snohomish, WA 98296
l:';
Northwest Cascade, Inc.
PO Box 73399
t i
%
��13P
Puyallup, WA 98373
a
Pivetta Brothers Construction, Inc.
PO Box 370 - 1812 Pease Ave.
Sumner, WA 98390
Reed Trucking & Excavating, Inc.
2207 Inter Ave. Ste. A
✓
'
Z �1 3_ rG.
Puyallup, WA 98372
(over)
CITY OF RENTON
BID TABULATION SHEET
PROJECT: Renton Hill Alley Sewer Replacement 2013
CAG-13-113
DATE: June 25, 2013
Page 2 of 2
FORMS
Proposal &
Bidder
Combined
L&I
Bid
Bid Total from Schedule of Prices
Trip. Form
Cert
Bond
*Includes Sales Tax
R.L. Alia Company
107 Williams Ave. S.
L�
✓
��
�%j' ?1 7. 6
Renton, WA 98057
Road Construction Northwest, Inc.
PO Box 1884-
Renton, WA 98057
Rodarte Construction, Inc.
Cam%
17 E. Valley Hwy East
✓�
✓
-Z
Auburn, WA 98092
West Coast Construction, Inc.
PO Box 419
�/
✓
✓
Z ,Q- Z3
Woodinville, WA 98072
/ �"'�
Engineer's Estimate
$220,607.46
PES
CUES, Inc.
3600 Rio Vista Ave.
Orlando, FL 32805
(407) 849-0190
Fax (407) 425-1569
Site Data for Project: 5320W
Site ID
City Street Date Time
22
Renton S9thSt@AIIeyWay 11 05/24/2011 12:21:36 PM
M.H. Start
5320009
M.H. Stop M.H. Depth Starting Dist Final Dist
5320830 7.9 8.0 202.7
Type of Pipe
Pipe Size(in) Sec. Igth Direction Surface Condition Operator
Cla
F 6 0 Away-U aved Asphalt Rocky
Comment
Observation Data
Obs ID Dist LD Code / Defect ClockPos Sew Lv Ph1 ID Ph2 ID VcIipID VidID TapeCnt
Comment
1
8.0
INSPECTION BEGIN DOWNSTREAM
54.37
2
51.7
CONNECTION FACTORY RIGHT
138.31
ok
3
74.3
CRACK MULTIPLE
12
235.19
4
83.2
roots@ joint
286.75
5
127.9
CONNECTION FACTORY RIGHT
457.52
6
130.8
ROOTS IN JOINT LIGHT
545.36
7
132.4
CONNECTION ABANDONED RIGHT
610.90
capped off
8
143.0
ROOTS IN JOINT LIGHT
653.43
9
147.2
ROOTS IN JOINT LIGHT
675.33
10
200.6
CONNECTION FACTORY RIGHT
908.43
ok
11
202.7
C/0#803
1013.80
Page 1 of 1
1E]
CUES
CUES, Inc.
3600 Rio Vista Ave.
Orlando, FL 32805
(407) 849-0190
Fax (407) 425-1569
Site Data for Project: 5320W
Site ID
City Street Date Time
42
Renton 1315 S.7thST 11 06/22/2011 11 09:20:21 AM
M.H. Start
M.H. Stop M.H. Depth Starting Dist Final Dist
5320221
Type of Pipe
5320829 1 4.4 0 +353.1
Pipe Size(in) Sec. Igth Direction Surface Condition Operator
Clay
6 11 31 Away-U Paved Asphalt Rocky
Comment
Observation Data
Obs ID Dist LD Code / Defect ClockPos Sevr Lv Ph1 ID Ph2 ID VcIipID VidlD TapeCnt
Comment
1
0
Looking down manhole
83.15
2-12" 1-6" pipes in brick MH#221
2
8.0
INSPECTION BEGIN DOWNSTREAM
148.32
3
16.0
PIPE MATERIAL CHANGE TO PVC
224.18
4
20.3
PIPE MATERIAL CHANGE TO VCP
277.89
5
37.8
lite roots
297.87
6
38.9
ROOTS IN JOINT LIGHT
321.59
7
46.5
CONNECTION ABANDONED LEFT
09
363.70
capped off
8
51.2
ROOTS IN JOINT LIGHT
405.90
9
61.5
ROOTS IN JOINT LIGHT
448.20
10
67.8
ROOTS IN JOINT LIGHT
480.46
11
69.8
ROOTS IN JOINT LIGHT
497.98
12
75.9
ROOTS IN JOINT LIGHT
523.36
13
78.1
ROOTS IN JOINT LIGHT
543.65
Page 1 of 4
C
CUES
CUES, Inc.
3600 Rio Vista Ave.
Orlando, FL 32805
(407) 849-0190
Fax (407) 425-1569
Site Data for Project: 5320W
Site ID
City Street Date Time
42
Renton 1315 S.7thST 06/22/2011 09:20:21 AM
M.H. Start
5320221
Type of Pipe
M.H. Stop M.H. Depth Starting Dist Final Dist
5320829 4.4 0 +353.1
Pipe Size(in) Sec. Igth Direction Surface Condition Operator
Cla
E 6 11 31 Away-U Paved Asphalt 1FRocky
Comment
Observation Data
Obs ID Dist LID Code / Defect ClockPos Sevr Lv Phl ID Ph2 ID VcIipID VidID TapeCnt
Comment
14
82.2
ROOTS IN JOINT MEDIUM
568.59
15
86.5
ROOTS IN JOINT MEDIUM
598.49
16
88.4
ROOTS IN JOINT MEDIUM
666.92
17
90.5
ROOTS IN JOINT LIGHT
682.23
18
92.6
ROOTS IN JOINT LIGHT
699.16
19
94.6
ROOTS IN JOINT LIGHT
720.16
20
96.6
ROOTS IN JOINT MEDIUM
754.72
21
100.8
ROOTS IN JOINT LIGHT
779.22
22
104.7
ROOTS IN JOINT LIGHT
805.28
23
107.1
ROOTS IN JOINT LIGHT
823.59
24
109.2
ROOTS IN JOINT MEDIUM
845.29
25
109.5
PIPE DETERIORATED
03
881.07
26
111.3
ROOTS IN JOINT LIGHT
916.50
Page 2 of 4
C
CUES
CUES, Inc.
3600 Rio Vista Ave.
Orlando, FL 32805
(407) 849-0190
Fax (407) 425-1569
Site Data for Project: 5320W
Site ID
City Street Date Time
42
Renton 1315 S.7thST 06/22/2011 09:20:21 AM
M.H. Start
5320221
M.H. Stop M.H. Depth Starting Dist Final Dist
5320829 4.4 0 +353.1
Type of Pipe
Pipe Size(in) Sec. Igth Direction Surface Condition Operator
Clay
6 0 Away U aved Asphalt Rocky
Comment
Observation Data
Obs ID Dist LD . Code / Defect ClockPos Sevr Lv Phl ID P112 ID VcIipID VidID TapeCnt
Comment
27
113.3
ROOTS IN JOINT LIGHT
951.52
28
121.2
CAMERA SUBMERGED
1045.88
29
125.6
ROOTS IN JOINT LIGHT
1070.06
30
127.6
ROOTS IN JOINT LIGHT
1097.01
31
129.6
ROOTS IN JOINT LIGHT
1154.01
32
131.7
ROOTS IN JOINT LIGHT
1176.69
33
135.9
ROOTS IN JOINT LIGHT
1200.99
34
142.2
ROOTS IN JOINT LIGHT
1225.74
35
144.2
ROOTS IN JOINT MEDIUM
1242.53
36
146.2
ROOTS IN JOINT LIGHT
1266.63
37
146.6
PIPE DETERIORATED
1295.69
38
148.3
ROOTS IN JOINT LIGHT
1319.53
39
150.3
ROOTS IN JOINT LIGHT
1347.39
Page 3 of 4
C
C lJ E E
CUES, Inc.
3600 Rio Vista Ave.
Orlando, FL 32805
(407) 849-0190
Fax (407) 425-1569
Site Data for Project: 5320W
Site ID
City Street Date Time
42
Renton 1315 S.7thST 06/22/2011 09:20:21 AM
M.H. Start
5320221
M.H. Stop M.H. Depth Starting Dist Final Dist
5320829 4.4 0 +353.1
Type of Pipe
Pipe Size(in) Sec. Igth Direction Surface Condition Operator
Clay
6 0 Away U aved Asphalt Rocky
Comment
Observation Data
Obs ID Dist LD Code / Defect ClockPos Sevr Lv Phi ID Ph2 ID Vc1ipID VidID TapeCnt
Comment
40
152.5
ROOTS IN JOINT MEDIUM
1365.11
41
162.8
ROOTS IN JOINT MEDIUM
1398.55
42
164.8
ROOTS IN JOINT LIGHT
1419.95
43
168.3
CONNECTION FACTORY RIGHT
09
1472.99
roots in connection
44
188.0
PIPE DETERIORATED
03
1553.24
45
201.7
CONNECTION FACTORY LEFT
09
1611.06
46 _
216.8
damaged pipe
09 /03
1736.89
top gone root growing
47
218.4
CONNECTION BREAK-IN RIGHT
03
1218347.jp
1791.94
roots
48
278.2
CONNECTION FACTORY LEFT
09
2109.23
49
350.6
CONNECTION FACTORY LEFT
09
2249.15
50
352.8
C/0#829
12
2287.84
51
353.1
E.O.P.
2316.12
52
353.1
INSPECTION END UPSTREAM
2331.94
Page 4 of 4
CUES, Inc.
3600 Rio Vista Ave.
Orlando, FL 32805
(407) 849-0190
Fax (407) 425-1569
Site Data for Project: 5320W
Site ID
City Street Date Time
33
Renton 1403 High AV S 06/08/2011 J 08:26:25 AM
M.H. Start
5320219
M.H. Stop M.H. Depth Starting Dist Final Dist
5317824 9.6 8.0 +327.4
Type of Pipe
Pipe Size(in) Sec. Igth Direction Surface Condition Operator
Clay
6 11 2 Away-U Ikiley Way Rocky
Comment
Observation Data
Obs ID Dist LID Code / Defect ClockPos Sew Lv Phl ID Ph2 ID VcIipID MID TapeCnt
Comment
1
8.0
INSPECTION BEGIN DOWNSTREAM
34.20
2
74.5
CONNECTION FACTORY RIGHT
02
255.58
3 165.0
CONNECTION FACTORY LEFT
09
341.07
s/s seperated @ connction top
4
118.0
CONNECTION BREAK-IN RIGHT
01
468.89
light crack from breakin
5
171.2
CONNECTION ABANDONED RIGHT
03
643.88
capped off
6
178.4
CONNECTION BREAK-IN RIGHT
03
742.89
cracks around connection
7
197.9
CONNECTION ABANDONED RIGHT
03
866.68
capped off
8
228.5
CONNECTION ABANDONED RIGHT
03
942.42
capped off
9
253.4
CONNECTION FACTORY RIGHT
02/03
1011.54
10
288.2
CONNECTION ABANDONED RIGHT
03
1095.31
capped off
11
292.6
PIPE MATERIAL CHANGE TO RCP
1215311.ip
1161.11
hole in concrete pipe
12
293.9
CONNECTION FACTORY RIGHT
03
1240.24
13
294.8
PIPE MATERIAL CHANGE TO VCP
1265.38
cracks in clay
Page 1 of 2
1
IE:
C U E ;4
Site Data for Project: 5320W
CUES, Inc.
3600 Rio Vista Ave.
Orlando, FL 32805
(407) 849-0190
Fax (407) 425-1569
Site ID
City Street Date Time
33
Renton 1403 High AV S 06/08/2011 08:26:25 AM
M.H. Start
5320219
M.H. Stop M.H. Depth Starting Dist Final Dist
5317824 9.6 8.0 +327.4
Type of Pipe
Pipe Size(in) Sec. Igth Direction Surface Condition Operator
Clay
6 0 Away U Iley Way Rocky
Comment
Observation Data
Obs ID Dist LID Code / Defect ClockPos Sevr Lv Phl ID Ph2 ID VcIipID VidID TapeCnt
Comment
14
298.8
JOINT CRACKED
1364.08
15
325.3
CONNECTION BREAK-IN RIGHT
03
1499-31
main cracked from tapp capped off
16
326.8
CONNECTION FACTORY LEFT
10/11
1591.61
capped off
17
327.4
INSPECTION END UPSTREAM
1634.67
Page 2 of 2
educate train ... �M
7 h C� 4A r, , 337. E
"'.5 - /(ve =&-'71
zer, .. i
A*H c's;[.= M
bEYTt-1 = qr:? i
x 4 .'71 ,� ,� = z�s Cy
!`►� 3 ' 4 �co
elf 4 = 9 4 � .(�.6 - 4 3?�
Ltis'i7-
E x z.33 349 = lei cy
A') t.f Ezp•,r = Z
7
f��o0al8lvly
DATA
Number
Unit
Description
Quantity
Unit Cost
Engineer's Estimate
1
Lump Sum
Mobilization & Demobilization
1
$19,800.00
$19,800.00
2
Lump Sum
Trench Excavation Safety Systems
1
$2,000.00
$2,000.00
3
Lump Sum
Construction Surveying, Staking, and As-Builts
1
$5,000.00
$5,000.00
4
Lump Sum
Traffic Control
1
$5,000.00
$5,000.00
5
Lump Sum
Temporary Erosion/Sedimentation Controls
1
$1,000.00
$1,000.00
6
Lump Sum
Landscape Restoration
1
$1,000.00
$1,000.00
7
Linear Foot
Television Inpsection of Sanitary Sewers
859
$2.00
$1,718.00
8
Linear Foot
Furnish and Install 8-inch PVC Sewer Pipe
859
$100.00
$85,900.00
9
Each
Furnish and Install 54-inch Diam. Sanitary Sewer Manhole
4
$4,500.00
$18,000.00
10
Each
Furnish and Install Shallow Sanitary Sewer Manhole
1
$4,500.00
$4,500.00
11
Each
Furnish and Install Sanitary Sewer Cleanout
1
$1,500.00
$1,500.00
12
Ton
Removal and Replacement of Unsuitable Foundation Material
50
$25.00
1, $1,250.00
13
Ton
Select Import Trench Backfill
1,300
$25.00
Zl $32,500.00
14
Ton
Crushed Surfacing Top Course
340
$35.00
$11,900.00
15
Square Yard!
Asphalt Patch
160
$65.00
SS $10,400.00
Sub Total
$201,468.00
Sales Tax
$19,139.46
Total
$220,607.46
Page 1
REPROGRAPHICS
NORTHWEST LLC
616 8th Avenue South
1850 130" Avenue NE
632 Broadway
Seattle, WA 98104
Bellevue, WA 98005
Tacoma, WA 98402
Tel:206-624-2040
Tel:425-883-1110
Tel:253-383-6363
Fax:206-382-4397
Fax:425-883-8590
Fax:253-272-4064
Dispatch:206-682-4040
Dispat6h:425-882-2426
Dispatch:253-274-1817
WORK ORDER FORM
No. 97731
P.O. No. Date: /�-1,4y 31. Zni
JOB No. LILIP- Z7^3(e?-(61 Date Due:
Project Title: LYA.b live" Li�r�i-a �7®,✓ /�jAeFraE:xo - Time Due: 2 %4e9 Pi%-J
❑ Reimbursable ❑ Non -Reimbursable
16900
CITY OF RENTON
UTILITIES SYSTEMS DIV_-
1055 S GRADY
RE:NTON WA 98055
Ordered By:
Phone No: 4-05" 4-3e *7Z79
Prints To:
Originals To: %_�sia/ 4YcF?Sr�,/
r- y
Attn:
Attn:
❑ Retain in Digital Vault ❑ Upload to Planwell
❑ Revise Digital Vault
CODE
ORIG
SETS
DESCRIPTION
BINDING: X STAPLE ❑ EDGE BIND ❑ CHICAGO SCREW ❑ LOOSE
Special Instructions
DIGITAL I COPY CENTER
❑ WHITE BOND
❑ 6.5x11 ONE SIDED
❑ COLOR BOND
❑ 8.5X 11 TWO SIDED
❑ 'VELLUM
❑ 11xl7 ONE SIDED
❑ MYLAR
❑ 11X17 TWO SIDED
❑ CLEAR FILM
❑ COVERSTOCK
❑ RECYCED STOCK
❑ RECYCLED STOCK
❑ OTHER
PLOTTING
• BINDERY
AUTOCAD ❑ PLT
Night Phone: /J /A ElDWF ❑ G C LE PUNCH
% ❑ CHICAGO SCREW
® Deliver ❑ Will Call Ship Via •MICROSTATI0 ❑ WIRE
�IC
PLOT ❑ PLASTIC Kou
COLOR
SCANNING
SFC
SMALL FORMAT COLOR
SFS SMALL FORMAT SCANNING
❑
LASER PAPER
❑ COLOR
❑
LASER COVER STOCK
❑ BLACK Et WHITE
❑
RECYCLED STOCK
LFS LARGE FORMAT SCANNING
LFC
LARGE FORMAT COLOR
❑ COLOR
❑
HI-RES 35# PAPER
❑ BLACK Et WHITE
❑
LO-RES 35# PAPER
❑ BURN TO CD
❑
HI-RES PRESENTATION BOND
❑ UPLOAD TO FTP
❑
Lo-RES PRESENTATION BOND
El ARCHIVE SCANNING
❑
SIGNS/BANNERS
MOUNTING
LAMINATING
❑ WHITE FOAM CORE
❑ LAMINATING
❑ BLACK FOAM CORE
3 MIL / 5 MIL / 10 MIL
❑ WHITE GATORBOARD
❑ BLACK GATORBOARD
❑ UV PROTECTIVE
❑ BOARD
INVOICE TERMS: NET 30 DAYS 1% FINANCE CHARGE PER MONTH ON PAST DUE BALANCES