Conditions for Permit B17003662
Building
1 All Construction, Demolition And Land Clearing Waste Must Be Recycled At A King County Licensed Or Approved
Facility, Or Taken To Regional Disposal Facilities.
2 Ground Electrode System (Either 1 Or 2 Are Approved Methods): 1. An Electrode Of At Least 20 Ft Long Bare
Copper, Sized In Accordance With Nec 2. An Electrode Of 20 Ft Long #4 Rebar (Not Less Than 1/2 Inch In
Diameter) And Sized Per Nec Either One Shall Be Encased By At Least 2 Inches Of Concrete, Located Within
And Near The Bottom Of A Concrete Footing That Is In Direct Contact With The Earth, And Shall Be Installed In
All New Residential And Commercial Construction.
3 Approval For Building Permit Only-Separate Approval And Permits Required For Any Mechanical, Plumbing,
Electrical, Fire Suppression Or Hazardous Materials System.
4 TREE PROTECTION MEASURES FOR ALL TREES IN THE CONSTRUCTION AREA OF A DEVELOPMENT
SITE. THESE MEASURES INCLUDE: 1. 6 foot high chain link fences around the trees out to and including the
drip line of the tree. 2. All the area within the fenced area needs a minimum of 3" of bark mulch. 3. Warning signs
must also be included on the fence. 4. Construction activity, parking, and storage of materials and equipment is
not allowed within the drip line (and therefore fenced) area of any tree. 5. The only new impervious surfaces
allowed within the drip line of existing trees are those shown on approved building or construction plans, which
typically should be limited to the new buildings, new driveways, new parking lots, new streets and new sidewalks.
5 Authorized Hours Of Construction/Activity: 7Am-8Pm Monday Through Friday 9Am-8Pm Saturday No Work
Allowed On Sunday. Per Ordinance 4703, 2-2-1998