HomeMy WebLinkAboutChange Order - 1u
CAG-21c.212, CO #1-h-23
#o
Public Works
Facilities Division
CONTRACT CHANGE ORDER (CO)
CONTRACT NO: CAG-21-212
PROJECT TITLE: ESCO - Phase 3
CO 1
TO: McKinstry Essention (CONTRA OR)
Amendment 1 to CAG 21-212 inadvertantly faired to include the previously incurred casts for the required professional audit of $82,500. The revised contract
total is per below. The fallowing mutually agreed to and Owner approved Contract Change Directive(s) are hereby incorporated by reference into the contract.
Description
ESCO Audit
ESCO Professional Services
ESCO Measurement and Verfication
ESCO Construction
DES Management
ESCO Audit
CO NTRACT S U M:
❑ NO CHANGE
❑� INCREASE
❑ DECREASE
CONTRACT TIM E:
Q NO CHANGE
Amount
$ 482,086.49
$ 11,351.31
$ lo466o728*21
$ 1,960,166-01
$ 62,500.00
Subtotal $ 20022,666.01
.1 $ 82;500:00
Subtotal
5 (62j500*U0)
Grand Total $ 2PO42.0666oOl
(WASHINGTON STATE SALES TAX INCLUDED)
INCREASE � OFE0-- -
Not Included in Amendment 1
Subtotal
Included in separate contract w/oES
Amount To Be Added via this CO
;V•' Included in separate DES Contract
McKinstry Revised Contract Total
$ 82,500.00 1
SCALENDAR
DECREASE J DAY
1b
The foregoing amount rovers everything required in connection with the change. All other provisions of the contract remain in full farce and
effect.
CONTRACT SUMMARY (Internal Use Only)
ORIGINAL CONTRACT SUM w/ WSST
PREVIOUS ADDITIONS/DELETIONS
PREVIOUS TOTAL
CHANGE AMOUNT THIS CHANGE ORDER
SUBSTANTIAL COMPLETION DATE
PREVIOUS CONTRACT CALENDAR DAYS
REVISED FINAL COMPLETION DATE
REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORD
FFCCF Acknowledgement Date
5
REVISED CONTRACT TOTAL $
ER
CURRENT FINAL COMPL
C
1,960,166.01
1;960,166.01
,.
00
00.01
December 31., 2025
0
December 31, 2025
D
ETION DATE December 31, 2025
rohoP 13// Z,3
o Bement Dxa e
The City of Renton hereby accepts the foregoing changes. This formal acceptance constitutes a Change to the contract only when authorizing
signature is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in
connection with this Charge order. _ _.,•. Pirelli
ATTES
CITY OF RENTON Mayor Armondo Pavone
T:
8/10/2023
PP
} �
T Jason A.t
DATE.06
f
Scanned with CamScanner
EXHIBIT 1A
Public Works
Facilities Division CONTRACT NO:CAG 21 212 AMENDMENT 1
PROFESSIONAL SERVICES CONTRACT PROJECT TITLE:City of Renton Energy Upgrades Phase 3
TO:McKinstry Essention LLC
Description Amount
ESCO Project Design,Contruction and Verfication 1,877,666.01$
CONTRACT SUM:
1,877,666.01$
WASHINGTON STATE SALES TAX INCLUDED)
CONTRACT TIME:
731
CALENDAR DAYS
CONTRACT SUMMARY Internal Use Only)
ORIGINAL CONTRACT SUM 82,500.00$
PREVIOUS ADDITIONS/DELETIONS $
PREVIOUS TOTAL 82,500.00$
CHANGE AMOUNT THIS CHANGE ORDER 1,877,666.01$
REVISED CONTRACT TOTAL 1,960,166.01$
ORIGINAL AGREEMENT DATE September 23,2021
PREVIOUS COMPLETION DATE December 31,2023
REVISED DAYS THIS AMENDMENT 731
CURRENT SUBSTANTIAL COMPLETION DATE December 31,2025
DES Acknowledgement Date Consultant Acknowledgement Date
AUTHORIZING SIGNATURE DATE
The following are mutually agreed to are hereby incorporated by reference into the contract.
The foregoing amount covers everything required in connection with the change.All other provisions of the contract remain in full force and
effect.
The City of Renton hereby accepts the foregoing This formal acceptance constitutes a Amendment to the contract only when authorizing
signature is affixed.Invoices incorporating this Amendment constitute acceptance by the Consultant as total reimbursement due in connection
with this Amendment.
OF:
OF:
NO CHANGE
INCREASE
DECREASE
NO CHANGE
INCREASE
DECREASE
April 17, 2023
TO: Russ Woodruff, City of Renton
FROM: Rachel Whitezel, Contracts Specialist, (360) 239-4134
RE Agreement No. 2022-131 A (1), Amendment No. 1 Revised
M&V Agreement No. 2022-131 B (2) Revised
Contract No. 2022-131 G (1-1) Revised
City of Renton Energy Upgrades Phase 3
IAA No. K4137
McKinstry Essention, LLC
SUBJECT: Funding Approval Revised
The Dept. of Enterprise Services (DES), Energy Program, requires funding approval for the above
referenced contract documents. The amount required is as follows (see page 2 for funding detail):
ESCO Audit $ 82,500.00*
ESCO Professional Services Total $ 482,086.49
ESCO Measurement and Verification Total $ 11,351.31
ESCO Construction Total $ 1,466,728.21
DES Energy Program Project Management Services Total (IAA) $ 62,500.00
Total Funding $ 2,022,666.01
In accordance with the provisions of RCW 43.88, the signature affixed below certifies to the
DES Energy Program that the above identified funds are appropriated, allotted or that
funding will be obtained from other sources available to the using client/agency. The
using/client agency bears the liability for any issues related to the funding for this project
By
Name / Title Date
Please sign and return this form to E&AS. If you have any questions, please call me.
CAG 21-212
Amendment 1
Exhibit 1C
8/10/2023ATTEST:
Jason A. Seth, City Clerk
Mayor Armondo Pavone
Agreement No. 2022-131 A (1), Amendment No. 1 Revised
M&V Agreement No. 2022-131 B (2) Revised
Contract No. 2022-131 G (1-1) Revised
Funding Approval Detail
ESCO Professional Services
Energy Audit and Energy Services Proposal $ 82,500.00
Audit & Energy Services Proposal from Authorization 22-131 A (1) $ (82,500.00)
Design and Implementation of Energy Conservation Measures $ 429,386.00
Apprenticeship Incentive $ 908.27
Sales Tax (10.1%) (Includes tax on Audit proposal) $ 51,792.22
Total $ 482,086.49
ESCO Measurement and Verification
First Year Measurement & Verification $ 10,310.00
Sales Tax (10.1%) $ 1,041.31
Total $ 11,351.31
ESCO Construction
ESCO Contract Amount $ 1,269,399.00
Sales Tax (10.1%) $ 128,209.30
Contingency Amount (with Tax) $ 69,119.91
Total $ 1,466,728.21
DES Energy Program Project Management Services
Project Management Fee from IAA No. K4137, Amendment No.6Rev$ 62,500.00
Total $ 62,500.00
Note: * Items and dollar values shown in a lighter color shade have been approved via previous
funding authorizations and are shown for informational purposes only.
2022131Aamd1BagrGconK4137amd6FundRevrw