Loading...
HomeMy WebLinkAboutWWP2700145.3SEC. 19 - TWP, 23 /V - R5E SECTION/RANGE LINE ,0 V. DO NOT SCALE 15 - o° TOP OF MANHOLE TO !' BE DETERMINED IN FIELD 10 — 9, 108 METRO SEWER o METRO MEASURING MANHOLE - per Metro Specifications. 51 •P::p=• 'Q••'0.;0;0'� �• of ° PIPE 12 CON Cored hole. PipE to be cut "Q 0 — b y flush inside. B ckfiII with I I I 1 non -shrink grout per d; o':?;•:y'.: '�':.'.Q a'.ro; S = 1.51 'p. METRO Specifications. INV.= 0.00' '•p�': of o,qa' -a 4.•.. CEMENT CONCRETE GROUT 6'' MIN. NOTE: Protect METRO Line from unbalanced soil loads. Proposed Method of Protection DETAIL METRO CONNECTION must be Approved by the Engineer. 30' 20' — INT" S.W. 10th ST. THOMAS AVE S.W. SEC. 24 — TWP 23N — R4E A E; 'A i1 H �V Jim �Le Ct R. R. TRACKS 9-0 Z -ch) W 0 O 1 Ict CC � N Z Cc U � h h rx 0 cn Z Q iW O � Z 0o Q O m , a 0 ,c5 h 1W �� O \ W , 0 o V V o 1 METERING MI — (SEE DETAIL) INT. S.W. GRADY WAY THOMAS AVE S.W.(EX ENDED) OLYMPIC PIPELINE ON A LINE ;1 A LIN�� 12 PROP 60' EASEMENT M-i 2.1 STA:' 2t61.46 = STA"G" 0t00 _ / \ EXISTING PROFILE \� METERING M.H.------�-----_i� (SEE DETAIL) -� 10' — 242 -12" CONC. PIPE 100 - 12 `^ D.I._PIPE____".-- 161 12CONC. PIPE __-.------ 108" METRO i INV.=3.93_ INV.= 4.13' S= 0.28 /° SEWER INV= 1.49 SMITH - BLAI R # 433 OR # 435 TRANSITION COUPLING OR APPROVED EQUAL AT STA. „A„ 1 + 61. PROFILE SCALE: HORIZ. 1 °°= 40' VERT. I"= 10' 11A" LINE M-1 20 STA."A" 5+04.85 , OLYMPIC PIPELINE ON CL Mi 13 '' -ir13 L NE-�� M( 19 0 V' Eo so VV o ---------=1,-------- ~n -OIL MAT ROADWAY IRREGULAR WIDTH N ` s 20 'CONCRETE PAVEMENT 11B11 LINE MH 13 STA."A" 6+18,75 = STA. B" 0+ 00 113 '— 1211 CONC. PIPE ==L INV.= 4.9t-' \-INV. = 5,37 S=0.06% INV.= 4.91 11A" & 11 B" LINES PLAN SCALE: I" = 40' 278'- 8" CONC. PIPE S = 0.66% INV.= 7.19 *NOTE - ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH A.P.W.A. SPECIFICATIONS. -- 30 NH 19 STA "B„ 2+77. 60 20' — 10' INV.= 6.52' EARLINGTON GARDENS SANITARY SEWER PROJECT 11 A1I & "IQ" LINES R. E. J. 1 1— 15--72 G. CASE 6.A.P AS SHOWN MCROFILMED 0- 3 —A 7