HomeMy WebLinkAboutTED4001429.1SHEET INDEX
SHEET
i
SHEET
2
SHEET
s
SHEET
4
SHEET
5
SHEET
6
reo - 4a -142 9
w
GENERAL NO TES
1. Al/ work materials shall be in conformance with the standards and specifications of the City of Renton Utility Department and the latest
edition of the WSDOT/APWA Standards and Specifications, as approved by the City of Renton. A set of approved plans shall be kept
on site at al/ times during construction.
2. The hours of work in the street right—of—way shall be limited to 8.•30 AM to 3.•30 PM on weekdays unless otherwise approved in writing by
the Department of Public Works at 235-2635. All street closures, partial or full, shall be approved by the Department of Public Works
24 hours in advance. The Po/ice Department, Fire Department, and 911 shall be notified 24 hours in advance.
J. All locations of existing utilities shown are approximate and shall be the contractors responsibility to verify the true and correct
location so as to avoid damage or disturbance. For utility locate call 48—Hour Locators, 1-800-424-5555
4. A preconstruction conference is required prior to any construction. A minimum of 3 (three) working days notice is required for
scheduling. Prior to scheduling the precon a permit information sheet must be supplied to the Utility Engineer's Office. Twen ty— four
hour notice will be required prior to starting new construction.
5. It shall be the contractor's resposibi/ity to secure all necessary permits prior to starting construction.
6. Inspection will be accomplished by a representative of the City of Renton, /t shall be the contractors responsibility to notify the Utility
Department 24 hours in advance of backfilling all construction. The contractor as well as the Engineers shall keep as —built drawings.
7. Asphalt and concrete street paving shall be sawcut to a minimum depth of two inches. Oil mat streets may be spade cut. A// surface
concrete, pavement, sidewalks, curb, gutters, and driveway approaches shall be sawcut to a minimum depth of two inches or removed to
to an exis tin g expansion joint.
8. A Temporary cold mix asphalt patch shall be placed on the day of initial excavation with a permanent, sealed patch to be placed, to City
of Renton policy, within ten days. Call subgrade inspection prior to placement of final patch. Trenches will not be left open over
night without prior written approval of the Inspector.
CO VER SHEET
SANITARY SEWER PLAN SHEET
STORM DRAINAGE PLAN SHEET
SANITARY SEWER PROF/LE SHEET
STORM DRAINAGE PROF/LE SHEET
NO TES
ACAD FILE DATE 2-28-92
LEGAL DESCRIPTION
TRACT 230 CD HILLMANS LAKE WASHINGTON GARDEN
OF EDEN DI KS/ON NO. 4 EXCEPT SOUTH 181 FEET
AND EAST 13 FEET OF SOUTH 280 FEET OF TRACT 247.
R-/429
4k
Vicinif
'r Mnp
No Scai e
H.
of WASi,
" AS -BUILT " PREPARED FROM FIELD SURVF
3 Y TO UMA ENGINEERS.
ACAD FILE NO. 91197DSN
15
W
Q
l
o
00
}
m
Y�III�
U
0
U
0
z
N
H-�
N
7 N
z
0
�G
�LJO
W
0 0 0
W
z a, �
z
C:,
N
H
L CY)
C6
z
W
D
0-0
CO N
H
w
co
__0
U
@
z
(Y--
U
Lo
till;
SHEET
J OF 6
JOB NO. 91197
T
0f3 P_-14ac�vi
17w,-f,,v5w