Loading...
HomeMy WebLinkAboutTED4001438.34k� A Line - - C6 N W W a 0 0 a m SEC. 3I, T 23 N., R. 5 E., W Drain Pipe, 8"Dra. (No f /nc 1. rn Br. Qfy.) Nk Instal/Existing Ra i /ing "Cdf for Ilium. Cable -- Stub out 0CdD (Typ.) e" Cd t for - In ferconoec f Cable f--4- 4,•Cdf. for Rari><ic tv W (P6ell Br. Orairr T 5 R I- - - -- - -- -- - - - - 1 - -C el f69—:0 . - - I ' 1 4=,3 From Exp..Jf --_ 2 titer /V1cr -A el 9 O6 L /5 ?) ��y Br-r e Drain 7Z 5 T p.6v 100 N 0 3 --�-- - I Infer-medrate Pre r 8k. Rrvl Seal + 1 El. 5z. zz o f Rdwy.rr7e Y 1 S 89,004 V E.45.G�4 �r 8r- Orarns (4%a! \ i bcrsf�tr' e 6, 77 •,1�9 0 z z ,3 �i exist 11,fo. curb col I El, 48.38 � Crown � � I -80 GY�G1'� Typ. all Peers i 1 M I� ro 0 b -�� 1 1 L me 1 El. 57.Oe Min. Hour. C/1- I - " .2 0 Condur>` for In ferconnecr.` Cable (from col race fo � ed e of',ola vr<) I I 2 Co du r >fbr I//urrr in o trio n C'crb /e - 1 l l l 73 r V 0,J f0 Sta. C 22�2�.5 I P —Pull Box Lighting BrfockeAnchorage J I rn wk. 1 / I r ---- Junction Box rn iQ4i/base - ----- --T —T A14-W -- - — W -- - w- - ----- - W- _.. b e 1 - - - - - - - 1 - - - --- --- - - - - - - - S - - - 8 - 9 - -0- - - G~Cdf for , S. P 4 L . f s'o ='- -�_ -= - ----I=- ----_---_--- -- = - =- --- -- _ - - = ---_--- - _- -- -`- I - = - - —_ _- =A� - -- _ - -- -(1 - - �= 8 -- '-- ! -- Jt � e0006.00 SfaA e1f69. 0 ezf3706 2,3f06. D D i =SR 167-Sfi. L-105500755 L7-O"00240-0~8k. to Bk. ofPSefs A l 1 I D rmens roes along A L rr7e also a long C L rr7e --- _ _ 0 C� PLAN EExrsf Bridge Deck Etevcrtrons shown along EXisf North Curb Lrr7e (I3`Lrt of A-L.rr7e) are at Back of' Pavf Sear' art Piers 15 amid of of Piers z, 3 0 4. Instal! exisfin Br. Railing on 1Vew Nor-fh ,Side Rail Base - - --- 7 secs. c 8- 9 II 0 8-O t l! ® 8 - 9 = z45 iti Nh N lV I� riv N V L---J I5.00 Elev. e0.0 _ (Typ. a// Ffgs. -' Piers e, 3 e 4 ELEVATION S to Lion iogs shown ar-e along C Line. Ere Id r,--WaSUl -e rail ,ocv 74 /occr ton be r'e rCmovrnrg ntil fxr5e 24" Wafer Moin W43RST. /,C FED ROAD j FED. AID FISCAL SHEET Rdw $l. �%Qrles DIV NO STATE PROJ. NO. YEAR NO. rxJ mrIna l)-- WASH. A Lit; -u. Ole •/1- t q� Ex rs fin g it , _- Rar/,n9 ;-,0 -- 4-4 Condui >< for ; n O. -OI fft Crown Line Pacific Al W. Bel/ -- _ _ _ _ -�- _Lj remain. nn - -;� till lilt Jill lilt fill IIII 9 i Ex1s - Prue fo be Fba�o(oned 2- 6"� Condo i >` for Remo ve Ex/sting Bridge Railing, tail Base, P. S. P. OL. S ide walk and portion of roadway slob.' TYp. Rb W�e. SECTION NEAR /NT. PIERS Section shown loo k rog ahead oo Sta Lion ing GENERAL NOTES A I1 ma feria 1 and work shall be in accordance wr'/h the requr'r-eme,-7�s of 1,47e 5fafe of Washr'ngfon, Deperrr<rr7enf of f-r'iyh ways S fcrndard Spec i f is a (ions for Road and Bridge Cons fruc rtron , dcl fed l9 7e . Foo ling e to va f tons and subs fr-r�c r<ure de fails ar-e SubJec >t fo c han�c�e o per7drn,g upon fournda from ma feria / encoun Pere& . Re rn fort Yi( crud er7dbe cutunfr'ncrl foorrrrrg elevations have been dexter -rimmed in the f re ld, and subs fruc Brie de fails have been modi flied as r'eggaired. The concr-e to in the 600 fings steal / be Class 8 mix. ,4t l other cosy` in place concrete shall be Class AX rntx False v�✓or~k sha// be care r ully released fc prevent impac f or undue s tr-esses in the S fruc Lure . The mox1mc.rrr7 design soil pressure per sQuarye foot is f•wo 67 Dire half' (ell) tons fvr Piers /\lo. /, 2, 3, 4 and 5. Unless o><herwrse shown on the plans) concrete cover-- meaas ui-ed f rorrr the face o f' the c one re fe fo the face 0- ancd reinforcement bar shall be e"al the fop of the roadwacslab, I"a/ the box Anr-n of the roadway s/ab and Q/ the fop of sidewalks, e l " a _ the bc)lAorn of foolfi 7gs and !lz~al all other-• /oca><rons. Th rs s fruc fcrr-e has been designed in accor-darrce wi f f-r the r-'equrr-ernern fs for Work Sr`ress Design , 1969 AASNO Spec ificafior�s crud to fer-rrri Spec i Pica (ions fhru 197,6. The road wa red uun slab Shall nol b - pourn rrnurr7 a f'fer pouring f e dia ohragrns, exce o>< in the rc'rna l Pour Stage the r-oadwc2 slab shall be poured with the dYX tphr-gyms. APPROX / 1VlATE QUA NTI TI ES S fruc tur-e Excava Pion Class A Steel R2ernforcing Bars Concrete Class 8 Concr-•e ice Clc7s5 AX Supers frwc rtcrrre S. W 43 CO-( S7`. L/-Xing Widening L2�wnsc-eu{s Wafer Redc1cing� Addrfive E.s71- Removir�`g for --tuns of ExisPing 8ric�/ge A6. I671133 415 Cu. Yds . 43,000 Lbs. 85 Cu •ids . 145 Cc.. Yds. Lump Scurr7 11� L rid. Ff 400 Ibllars Lump Sum LOADING: H5 -aO OR TWO ,e4 AXLES 0 drC k.9- DATUM Sea Level Dafum of 19e 9 W H LAYOUT i