HomeMy WebLinkAboutTRO4101781.20
0
0
9+54.80 /
STA 6+87
i i+oo S. 4th. ST.
SERVICE POINT #1 - 120/240 VOLT SERVICE FOR ILLUMINATION CIRCUITS.
TOTAL APPROXIMATE RATED LOAD.
ILLUMINATION = 90 AMPS
SCALE IN FEET
CONSTRUCTION NOTES
12+00
INSTALL 400 WATT SODIUM VAPOR LUMINAIRE WITH PHOTOELECTRIC
CELL. SEE SPECIAL PROVISIONS.
CONSTRUCT FOUNDATION AND PROVIDE AND INSTALL MASTER CONTACTOR
WITH MODIFIED TYPE D SERVICE IN TYPE A CABINET 3' FROM THE FACE
OF CURB. SEE SPECIAL PROVISIONS, DETAIL SHEET, AND STANDARD
PLANS J-18c, J-18d AND J-18e.
3 WIRE AND CONDUIT FROM PUGET POWER VAULT TO MASTER CONTACTOR
TO BE FURNISHED AND INSTALLED BY PUGET POWER.
TEIU,4INATE 2 -2 !C TWISTED PAIR INT,SR :ONNEC ' F, FUTURE
INTERCONNECT FOR SOUTH 4TH STREET IN JUN,-- lox.
O�O
O�
-- -0 _ _ 13+00
Z1.59
o�0
vtWashington
ENGINEERS ARCHITECTS PLANNERS SURVEYORS
13401 BELLEVUE-REDMOND ROAD SUITE 101
BELLEVUE, WASHINGTON 98005
T
14+00
- I - -
209
27 �
i
M
(n
11-6-74
DATE
I CITY OF RENTON
ENGINEERING DEPARTMENT
1- SOUTH 4TH STREET
DESIGN
DRAWN.
CHECKI
APPRON
STA.6+87 TO STA. 14+93
I LLUM II NATION
DATE FFR-1973 FILE NO
SCALE n0-D 000tt .AaL_
;_, 22ze i-d � SHEET E- 2 OF
-rm O - %/- /
DIRECTOR
SCANNED MAR 2 8;�,
7 i