Loading...
HomeMy WebLinkAboutTRO4101781.20 0 0 9+54.80 / STA 6+87 i i+oo S. 4th. ST. SERVICE POINT #1 - 120/240 VOLT SERVICE FOR ILLUMINATION CIRCUITS. TOTAL APPROXIMATE RATED LOAD. ILLUMINATION = 90 AMPS SCALE IN FEET CONSTRUCTION NOTES 12+00 INSTALL 400 WATT SODIUM VAPOR LUMINAIRE WITH PHOTOELECTRIC CELL. SEE SPECIAL PROVISIONS. CONSTRUCT FOUNDATION AND PROVIDE AND INSTALL MASTER CONTACTOR WITH MODIFIED TYPE D SERVICE IN TYPE A CABINET 3' FROM THE FACE OF CURB. SEE SPECIAL PROVISIONS, DETAIL SHEET, AND STANDARD PLANS J-18c, J-18d AND J-18e. 3 WIRE AND CONDUIT FROM PUGET POWER VAULT TO MASTER CONTACTOR TO BE FURNISHED AND INSTALLED BY PUGET POWER. TEIU,4INATE 2 -2 !C TWISTED PAIR INT,SR :ONNEC ' F, FUTURE INTERCONNECT FOR SOUTH 4TH STREET IN JUN,-- lox. O�O O� -- -0 _ _ 13+00 Z1.59 o�0 vtWashington ENGINEERS ARCHITECTS PLANNERS SURVEYORS 13401 BELLEVUE-REDMOND ROAD SUITE 101 BELLEVUE, WASHINGTON 98005 T 14+00 - I - - 209 27 � i M (n 11-6-74 DATE I CITY OF RENTON ENGINEERING DEPARTMENT 1- SOUTH 4TH STREET DESIGN DRAWN. CHECKI APPRON STA.6+87 TO STA. 14+93 I LLUM II NATION DATE FFR-1973 FILE NO SCALE n0-D 000tt .AaL_ ;_, 22ze i-d � SHEET E- 2 OF -rm O - %/- / DIRECTOR SCANNED MAR 2 8;�, 7 i