HomeMy WebLinkAboutTED4001803.2Pipe
Number
Upstream
Invert
Downstream
Invert
7
194.01
193.10
8
MIN 193.16
193.10 -
9
193.10
192.77
10
MIN 192.83
192.77
11
192.77
192.44
12
190.84
190.58
13
185.34
185.00
14
191.13
190.84
15
MIN 191.19
191.13
16
191.42
191.13
17
191.82
191.42
18
MIN 192.08
191.82
19
192.03
191.82
20
MIN 192.29
192.03
21
192.43
192.03
22
192.72
192.43
23
MIN 192.78
192.72
24
193.18
192.72
25
MIN 193.24
193.18
26
193.35
193.18
27
MIN 193.41
193.35
28
193.68
193.35
29
193.80
193.68
30
MIN 193.86
193.80
31
194.00
193.80
7ft-4to-/gft3 J L
6\o
N 1,9.(55) 19!5,-1(v NE QUARTER OF SECTION 30, TOWNSHIP 23 NORTH, RANGE 5 EAST
I, E, (S ) 1133,03
N1;W tvlH-2/ TYPE 2 SEF
72" (7 W/PROP TT--F) SECTION/ v �f(/ EXI ST
SOLD LO&K NG LID Sk. � 5 8 SO
MARKED (9 n GONG, wALK
R 1 M 1 glo. 25
1. E. N. 18 5, 33 3 � �
S. 59 5 M 5 f NGS FO R
IL E,E, 190, 515 p .\ GO Nil I NUA"i'10`N c'� BL DG
k prV'
1�3, 1W
N, O N
h. SS I.E, 19�0 00`12\
am)( SEE MECH,
& 4r) e-ONTINUATION)
ti10 00
PROPOSED CLASSROC?..
13 4 BLDG I9�,o9
PTOM OF NSW �ZOC�GE RY
LEVEL IZD SL. 1 SS1 U
TOP 01�, NEW 22
LEVEL aD EL. 202,S
SEE SHEET C-1
MATCHLINE
\' O;pRIM 198. 8/
o `V I. E, i c3A , 00
31 TO 151- FLA,LEp oV r-K
�� kb�° '�XIS1- 8" SD. APANDON R ►�nAINING
g' N T
all D b SOUTH F I L-L W/ G MO Ur
N1r W GB -5 -1'Y PE 2 , w/;, AM E_ G re Ars
XIST RIM
C° 5D I.E. 1 93, Coo
8 NEW 1'ZO�JCERY GONNEGT EXIST (a'' SO { =ROM 1200F 17RAIIV
1<41 TO NEWG,B
o
1301T L) N -W RO G K_I- P.Y
LEVEL. 199,0/2\
cr>
CIS?, MH-3 �'YPE 2 Q 4 s = MtN 2�0Y . ,ems �: L, 1NAt,K
54'' QS W/SOLID I,ocK G v � o 27 TOP OF New N WSTA RS
u 0 MARIcED AWE /� Ng PLAG E 12 S, -ROCKERY 1..E�/ L ate-. 202': 5/2\
X I
1ZI M 194.19, 1,E N.1- 1 ¢� .0
5 /, 'ST FIRS H Y DRAN"(
(� // z z� ...:y.;
I, E, W. IS 0,4y I,1-,S, 18 .7 J REMOVE SALVAGE
/p
> Q , ti I'�I � W M H -1 T(p ` ` .::: Ag N i O N P. ., r- r_ ram_ C-I N Or- P ENTO N
I.E, t�J. 180.72 s ,►
PLUG EXIST, ,� ► 15 48 m w/ LSOLID LUGKIN Q 12" SD tN ST,AN.. ANDS
A212 S Q LID MA.RICE.D 11DRoaiN : PL.ALE
jZIM 1180,09
U 0 F I L.L- W/
I.E, 5, 1�0.84
b �. S=t11 ►2% I E N 192 44 N MN- 5 TYPE...
,
A N ON
xi -r ' SD
NEW MH - 4 -TYPE 2-
0 W/"�Ouc L-OciK-INS
(,ID MARIK>✓D "DRAIN"
RIM 181 83
I, E, E:, 182, 30
I. E,S,E, 184.4� n
�iP�X (ST, - 2, 7YP5 1
VIOuB st_Y 2AI5ED)
1;2-1 rA 18g, 94
PLUG EXIST �"
CLEAN OUT
NUMBER
RIM
ELEVATION
INVERT
ELEVATION
CO-3
198.92
196.84
C04
197.9
191.42
CO-5
197.9
192.43
CO-7.
198.0
195.62
J L
A G.O. CLEANOUT, SEE DETAIL. SH. C- 5
TYPICAL OF (10)
o IDS DOWNSPOUT SEE DETAIL, SH. C-5
TYPICAL OF (12)
O CATCH BASIN
• MANHOLE
0 W/ SUL.Ia (,OGKtNG
x:. ./ LID MARKED ,'QizAIN"
,\O Q 13 LF Gn PVL �° 2.4 kIM 200, 5, t,E.+18G,
�. N
MIN, 270 �, p CONTRAC-TOf2 TO F'lELO
of 13 �� V RI FY I,E,'s OF EXIST,
.., E
ES AWUST L.UCA'i"10
NEW GIB - 4 7YPt: 1
121M 188. 88
I,F-:" 184 a3
W. N
0n .� AX RE TO FILK OF
IS-r 8" IO" Sty. FLOG
o P
y `• F_ I ST 2' ` a
X t
N ,
rL,
DUwNSPour SEE UET-AIL-,
S, G- 5. � of (i2)
H�
_. SCALE:
1 20
_
r
N11 EW MN - v7Q , TYT 2
95 W �U D L 0C K_lN&, Ulf
F1M I �3 -1 8
ASANhON .EX.IST ...,...... II✓. ,5�7 1 S.Co&
I=-IL4 W/..GROUT IE. W I S4.
lit ^I1
S
F MOv>�.'
. X I ST
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WO9KS DEPARTMENT,
SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS.
`
9. A COPY OF THESE APPROVED PLANS MUST BE ON THE Jt 3 SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
..
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT
DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED
AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED
PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN
LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF
r,.. 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF
:; <$ MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE
SANITARY SEWER NOTES & SPECIFICATIONS ,r 4 . PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE
TRENCH MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS
AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND
THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND
SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE LIMITED TO
8:30 A.M. TO 3:30 P.M. ON WEEKDAYS, UNLESS OTHERWISE APPROVED IN
WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235-2620. ALL STREET
CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT 2
OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE
DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD
SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION"
PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS
ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD
SPECIFICATIONS.
ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND
CORRECT LOCAfitON SO AS TO AV.OtD.DAMAGE OR DISTURBANCE.326.54
A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE ...
REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS
PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED
BY A REPRESENTATIVE OF THE CITY OF RENTON.) IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24
HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND
SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND
OTHERS ON THE CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET
USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
J L
J L
SAME AS DESCRIBED. #
12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING
TRAVELED ROADWF.Y SHALL BE BACKFILLED WITH CRUSHED ROCK AND
MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE 5
NEA i LINE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH
MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A
PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL
BE PER CITY OF RENTON CURRENT STANDARDS.
13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE
STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE
PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF
CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH SECTION 7-02.3(1) OF THE CURRENT
STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION. THi SHALL INCLUDE NECESSARY LEVELING OF
THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS
WELL AS PLAC.EMENT,AND COMPACTION OF REQUIRED BEDDING MATERIAL
TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL -BE...
SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER
GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND
MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER
MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
18. THE PIPE SHALL BE INSPECTED WITH A TV CAMERA, IN THE PRESENCE OF
THE CITY OF RENTON INSPECTOR, PRIOR TO FINAL APPROVAL.
j AN N E D MAR 2 8 2003
J L J
TITLE
RENTON
SCHOOL DISTRICT 403
IMPROVEMENTS AT
TALBOT HILL
TIFFANY PARK
ELEMENTARY SCHOOLS
PROJECT NUMBER
90030
STAMPS
C' SA �,,•,,....,,,
Z ,
a
rJ0NA� 4
✓ xpi S 811713? z N
DWG I? B K G 91
CHK AMS 3 2q 9i
REV REVISION NO.1 5-2-91
REVISION NO.2 5-17-91
CONTENTS
TALBOT HILL
STORM DRAINAGE &
SANITARY SEWER
aEoor-29%--c�
FMwrnovx
rf 4'0��
on-0uiU1 �i
'SEE PGA�1
� 23i9
SHEET
-/ to 02
/BMWs=. 13 C-��2-
AM