HomeMy WebLinkAboutTED4001807.1GENERAL NorEs A.#vo SPECIFICAr!ONS 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THL CITY OF RENTON STANDARD SPECIFICATIONS FOR MUNICIPAL CONSTRUCTIONS. A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION. 2. THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE LIMITED TO 8:30 AM TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235-2635. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. FOR UTILITY LOCATE CALL 48-HOUR LOCATORS, 1-800-424-5555. 4. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 7. PLANS APPROVED BY THE DIRECTOR OF PUBLIC WORKS SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 8. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 10. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 11. WHERE NEW PAVING MUST MATCH EXISTING PAVING, APPLY TACK COAT FOR PROPER SEALING. 12. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 95% MAXIMUM DRY DENSITY MODIFIED PROCTOR. TORM ORC1 AI NOTES AND -SPECIFICATIONS 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION/COLLECTION FACILITIES TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND CONSTRUCTION AND MUST BE MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPING ARE COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 2. ALL ROOF DOWNSPOUTS AND FOOTING DRAINS SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM. 3. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH ARE ON FILE AT THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRIT'_T'EN APPROVAL FROM THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS. 4. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE STORM DRAINAGE SYSTEM, THE SANITARY SEWER SYSTEM, THE WATER SYSTEM AND THE SITE GRADING WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER. 5. BEDDING SHALL BE PER APWA STANDARD PLAN NO. B-18c, CLASS "B" FOR RIGID PIPE (CONCRETE AND IRON). BEDDING MATERIAL SHALL BE TYPE I PLACED FROM FOUR (4) INCHES BELOW PIPE TO SPRINGLINE FOR PIPES TWENTY-SEVEN (27) INCHES DIAMETER AND SMALLER AND FROM SIX (6) INCHES BELOW TO SPRINGLINE FOR PIPES THIRTY (30) INCHES DIAMETER AND LARGER. BEDDING SHALL BE PLACED BY HAND IN SIX (6) INCH LAYERS AND COMPACTED TO NINETY-FIVE (95) PERCENT MAXIMUM DENSITY. 6. BEDDING SHALL BE PER APWA STANDARD PLAN NO. B-18c, CLASS F FOR FLEXIBLE PIPE (CMP OR PLASTIC). BEDDING MATERIAL SHALL BE TYPE 2 PLACED FOUR (4) INCHES BELOW PIPE TO SIX (6) INCHES ABOVE PIPE FOR PIPE TWENTY-SEVEN (27) INCHES AND SMALLER OR SIX (6) INCHES BELOW PIPE TO SIX (6) INCHES ABOVE PIPE FOR PIPE OVER TWENTY-SEVEN (27) INCHES INSIDE DIAMETER. BEDDING SHALL BE PLACED BY HAND IN SIX (6) INCH LAYERS AND COMPACTED TO NINETY- FIVE PERCENT MAXIMUM DENSITY. 7. BACKFILL SHALL BE BANK RUN GRAVEL OR NATIVE MATERIAL OF SIMILAR CHARACTERISTICS TO BANK RUN GRAVEL PLACED ABOVE PIPE BEDDING IN EIGHT (8) INCH LAYERS, WITH EACH LAYER COMPACTED TO NINETY-FIVE (95) PERCENT MAXIMUM DENSITY. CARE SHALL BE TAKEN SO THAT BACKFILLING OPERATIONS WILL NOT DISTURB THE PIPE IN ANY WAY. ROCKS LARGER THAN TWO (2) INCHES- SHALL BE AT LEAST FOUR (4) INCHES FROM THE PIPE. JETTING OR FLOODING WILL NOT BE PERMITTED. 8. RAIN LEADER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034 SDR 35. 9. STORM DRAIN PIPE FOR TIGHT -LINE INSTALLATION SHALL BE CONCRETE RUBBER GASKETED ASTM C-14, CL.2 OR ASTM C-76-II, CORRUGATED GALVANIZED STEEL TREATMENT FIVE (5) ASPHALT COATED, HELICAL CORRUGATED ALUMINUM WITH TREATMENT FIVE (5) ASPHALT COATED. STEEL AND ALUMINUM PIPE SHALL HAVE A MINIMUM 1.5 FEET OF COVER IN PAVED AREAS. STEEL AND ALUMINUM PIPE SHALL HAVE WATER TIGHT CONNECTING BANDS. METAL PIPE SHALL BE SIXTEEN (16) GAUGE. 10. TYPE II CATCH BASINS (DIAMETER STATED ON PLAN) SHALL BE PER APWA STANDARD PLAN NUMBER B-le & B-lf WITH RING AND COVER OR FRAME AND GRATE (AS STATED ON PLAN). TYPE I CATCH BASINS SHALL BE APWA STANDARD PLAN B-1 WITH APWA STANDARD PLAN B-2a, METAL FRAME AND GRATE. TYPE IL CATCH BASINS SHALL BE PER APWA PLAN B-la WITH APWA STANDARD PLAN B-2a, METAL Q FRAME AND GRATE. 11. MAXIMUM TRENCH WIDTH FROM TOP OF PIPE ZONE TO BOTTOM OF TRENCH SHALL BE FORTY (40) INCHES MAXIMUM FOR PIPE FIFTEEN (15) INCHES DIAMETER AND SMALLER. MINIMUM TRENCH WIDTH SHALL BE TWENTY-FOUR (24) INCHES PLUS INSIDE DIAMETER FOR PIPE TWENTY-FOUR (24) INCHES OR SMALLER. ABOVE THE PIPE ZONE, THERE IS NO LIMIT TO TRENCH WIDTH. .a.D� I�(1 OfJ �-Le �✓rU Izt�l � 2fil t�l�-�� �Jc�-f�S I 'rH 2v U �N I I c)F R�t�l-ro�'� �r�t`1D�2D �PE�IFIG.�ffUNS� �)-I E GI't'`r'IS STD D.�IzD �P�U f=1 CAT ®N i Wl Ll. �tJ PE(ZCEDE f�TEs I TN2ouf-H I I SAN/TAfcY SEWER NOTES+f SPEC/F/CATlONS 1. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER. 2. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 3. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH MEETS THE REQUIREMENTS FOR "GRAVEL BACKFILL FOR PIPE BEDDING" THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED PROVIDED THE MATERIAL IN THE BOTTOM OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE UNYIELDING BASE. 4. SANITARY SEWER PIPE SHALL BE CONCRETE RUBBER GASKETED ASTM C14-CL.3 OR ASTM C76-11 OR POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 52. A. ��JEof WA S/, s � AS -BUILT STFVk /OHAf LAN SpQ Steven A. Hitchings PL-S. 2333 3-19-9I .I ' A4ATC9 L./NE' A4A7'C9 L/NE' 5# r 4 I , F EX. 12" MAINS -- S W 27 th STREET KEY MAP lot= 100 72" if TYPE 2T awnK E MMHO LE as .. 2 pt. 4 �L_L3vVJ RES+ ��LiDrZ NOTES 1. USE MIN. ,4e DIA' CATCH BASIN TYPE 2 2• OUTLET CAPACITY: DEVELOPED DESIGN FLOW 3. METAL PARTS: CORROSION RESISTANT. GALVANIZED PIPE PARTS TO HAVE ASPHALT TREATMENT 1. 4. FRAME 6 LADDER OR STEPS OFFSET SO: A. CL.EANOUT GATE IS VISIBLE FROM TOP. B. CUMB-DOWN SPACE IS CLEAR OF RISER AND CLEANOUT GATE. C. FRAME IS CLEAR OF CURB. 5. IF METAL OUTLET PIPE CONNECTS TO CEMENT CONCRETE PIPE: OUTLET PIPE TO HAVE SMOOTH O.D. EQUAL TO CONCRETE PIPE LD. LESS 114". 6. PROVIDE AT LEAST ONE 3" X .090 GAGE SUPPORT BRACKET ANCHORED CONCRETE WALL (MAX. X-0- VERTICAL SPACING). 7. LOCATE ELBOW RESTRICTOR(S) AS NECESSARY TO PROVIDE MIN. CLEARANCE AS SHOWN. 8. LOCATE ADDITIONAL LADDER RUNGS IN STRUCTURES USED AS ACCESS TO TANKS OR VAULTS TO ALLOW ACCESS WHEN CATCH IS FILLED WITH WATER. eon4vol 61w4 we, �O1 ENt eyjeNe f OveY•flow als. V Lead *6 qe, PLAN Removable Watertight Coupling cr Fjay%ge. 2" Min 6'• t2 FAIN Max. Plate Welded to f rbow With Orifice as Specified Elbow-Restrictor Isometric G TYPE IL w" Frame, Grate & Round Solid Cover Marked "DRAIN" with Lockinq Bolts See Note B Elev. per Plans tu , - ga I i Max. Design W.S. IV min.) Pipe Supports t See Note b Restrictor Plate L- W ITN (_-e No l • %Z'/ ATT;\_rL4E.P BY CaAs D 5AND Ta AUzvj KEMovAL . 3Nr-Z Y. VALLEY N� �O/YCjACRES r� ' -C4 L/ND _NLAVE. _ S.LLi. VAC. LEY Hp� VIC/N/T Y MAP NO 5C1q L E SECTION `7 - r l' F-MesaeNe'Li Ovev410%0 Vertical Bar Grate CL /726 for Pond Overflow MAX. vJ.5• CL, 15.75 _ OVev- IFLovJ �G.owL>n-1oN5 DET.Ai i ! = '``ON TIK O L A4ANH'O LE NO. / NO SC4"E 1440/489)701 "Key''ekr4va,►c� sf-q"iDQ A -A /�>� Ha�iv� grouHd do ��E �,s--•'{�S- GirCum>�,tnfial Lengfi o�'�ninq IMHU fl i Frzme%rgif -_ for nv?irolled lev�d t l OLC'i'> lob. rovide &ars in Frame, "O.C. E 7 / 0 IV "A _ A .. NO SC4LE 12MIL: EWEAC7eNC Y 0114FP.JFL.0W SP1LLMqY NO SC4LE RECOMMLWE FOR APPROVAL _57-DRM AT C./7/L/7_Y Top of Berm dividing pond into two cells 1� 1 Top of Dead Storage e EV. Bottom of Ponda EL eV7 II.O EL Std. Galt'. Handholds Steps or Ladder Elbow Restrictor See Detail Shear Gate w/ Control Rod For Cleanout/Drain ( Rod Bent as Req.d for Vertical Alignment w/ Cover) � X 19 Minimum X E4_0-V. = 13 75 Elevation is one foot below 25yr. -24 hour design water surface V CV o Z M WN M J Q 0LU r0) V Li U W Z> z v H Q J ^x KJ IT Cl) CV Cl) Cz U) o QL1J L1J Wz OW U cn CC Q w _j w > Q U O Z_ D � m0 CV X Irm vQ; O ) N 0 r W_ J r I ji � z O Z T N W 0 V v Q ®L F�•• W Z �> p ll1p�� oL �6 T1to CV -- z U (n O ~ Z .- • a 3 Ld Z Z W �-- O Z~ 0 U L� W Ln 1 1/2- 6' Minimum r I Rock"CoreWashed _ 0 W 18' Thickness Q (L Quarry Spalls Layer 2 2 J a. f� Z Cell Pond ! Cell Pond Wj CyO Bottom Botom ('- O Note: "Key" not required t!i ac Secrml rw',x _ X ., Z • ff-W L : QUARRY.. PA � L � `, RA V EL F1 L TER W/1V00W DRAWN BY. CHECKED BY NO STALE' J- J- W 0. M. wtAJ.w S- DATE. CHECKED FOR COMPLIANCE /v Nab 7 I . STANDARDS 2JOB NO 1 _ __ _.Date.,' ,'�" •90 , � . < 90 / 3�'� ®4 ' SHEET 1 OF _3 am-37 SCANNED MPR 2 8 LUUJ