Loading...
HomeMy WebLinkAboutTED4001925.1NOTE: WHENEVER THE WORDS "KING COUNTY" APPEAR IN THE NOTES LISTED BELOW, IT IS UNDERSTOOD BY THE CONTRACTOR TO REFER TO THE SPECIFIC GOVERNING AGENCY UNDER WHOSE JURISDICTION THIS PROJECT FALLS. GENERAL NOTES 1. All work and materials shall be in accordance with these plans and the standards and specifications of the governing agency or munici- pality under whose jurisdiction this project falls. 2. Approximate locations of existing utilities have been obtained from available records and are shown for convenience. The contractor shall be responsible for verification of locations shown and for the dis- covery of possible additional utilities not shown, so as to avoid damage or disturbance. 4. All 8", 12", and 18" storm drainage pipe shall be helical corrugated metal pipe (16ga.), aluminum or galvanized steel, unless otherwise noted. All steel pipe shall be Asphalt Treatment I coated. Non -rein- forced bell and spigot concrete pipe, conforming to ASTM-C14 (extra strength), Class II, may be substituted for the corrugated metal pipe. (The bell end of the concrete pipe shall not be installed inside the catch basins) PVC pipe shall conform to ASTM D-3034 (SDR 35). All footing drains and rockery drains shall be connected to the interceptor pipes with 6" ADS pipe or equivalent. All pipe bedding shall be APWA Class "C". All trench backfill shall be compacted to at least 95% of its maximum density at optimum moisture content. 5. All catch basins shall be Type I-C or Type II-C (APWA-1977) and shall be in accordance with standard drawings or details of the governing agency. Within the City of Seattle, the City's standards shall apply. 6. All disturbed surfaces shall be seeded to tough, hardy grass unless other landscaping/erosion control measures are employed. STORM DRAINAGE PLAN NOTES 1. All construction shall be in accordance with King County Specifications. 2. The storm drainage system shall be constructed according to the approved plans which are on file in the Department's central records. Any devia- tion from the approved plans will require written approval from the Department. 3. A copy of these approved plans must be on the job site whenever con- struction is in progress. 4. Datum shall be K.C.A.S. unless otherwise approved by the Department. 5. Before any construction/development activity occurs, a pre -construction meeting must be held with the Department's Development Inspection Section. 6. A requirement which must be met before beginning construction is to provide proof of the liability policy required by King County Code 20.50.100(D) to the Department's Development Inspection Section. 7. King County Code 12.88 requires that construction noise only occurs between 7am and lOpm on weekdays and 9am and lOpm weekends. 8. All sedimentation/erosion control facilities must be in operation prior to clearing and building construction, and they must be satis- factorily maintained until construction is completed and the poten- tial for on -site erosion has passed. 9. ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS THAT ACTIVITY EXCEEDS THE CAPACITY AND INTENT OF THE EROSION/SEDIMEN- TATION CONTROL FACILITIES OR UNLESS OTHERWISE APPROVED BY THE DEPARTMENT. 10. All disturbed areas shall be seeded and mulched or otherwise stabil- ized to the satisfaction of the Department for the prevention of on -site erosion after the completion of construction. 11. Grass shall be established by hydroseeding or as otherwise approved by the Department. The performance bond will not be released until the grass has been established, unless otherwise approved by the Department. 12. All pipe and appurtenances shall be laid on a properly prepared found- ation in accordance with Section 7-02.3(1) of the current State of Washington Standard Specifications for Road and Bridge Construction. This shall include necessary leveling of the trench bottom or the top of the foundation material as well as placement and compaction of required bedding material to uniform grade so that the entire length of the pipe will be supported on a uniformly dense, unyielding base. If the native material in the bottom of the trench meets the require- ments for "Gravel Backfill for Pipe Bedding" the first lift of pipe L•TM 136TH {STH ST ,,- N SE. 70TH ST , W W -- --• -SE.-7-SST_. sty SE. 71S �• PL-. r a V. :SE74 H In r ECT .E 4� SE SOTH ST h VICINITY MAP THE GEOTECHNICAL REPORT, AND RECOMMENDATIONS CONTAINED THEREIN, PREPARED BY EARTH CONSULTANT INC., DATED 11-5-87, ARE TO BE CONSIDERED PART OF THE SPECIFICATIONS FOR THIS PROJECT DUE TO THE SENSITIVE NATURE OF -THE UNDERLYING SOILS CONDITIONS ON THE SITE. ALL ITEMS OUTLINED IN THE GEOTECHNICAL REPORT SHALL BE MONITORED & TESTED BY EARTH CONSULTANTS, INC., TO VERIFY COMPLIANCE UITH THE RECOMMENDATION CONTAINED THEREIN I I LEGAL DESCRIPTION THAT PORTION OF TRACTS 183 AND 184 OF C.D. HILLMAN'S LAKE WASHINGTON GARDEN OF EDEN ADDITION TO THE CITY OF SEATTLE, DIVISION NO. 3, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 11 OF PLATS, PAGE 81, IN KING COUNTY, WASHINGTON, LYING EASTERLY, SOUTHERLY. AND WESTERLY OF PRIMARY STATE HIGHWAY NO. 1 AS CON- DEMNED FOR HIGHWAY PURPOSES BY THE STATE OF WASHING - TON UNDER KING COUNTY SUPERIOR COURT CAUSE NUMBER 613780, INCLUDING THAT PORTION OF COUNTY ROAD VACATED BY ORDINANCE NO. 2111 OF THE CITY OF RENTON. 15�pp I NST. 50 L.F -15' S=2.0% / .x 6�. A PORTION OF THE SW 1/47 OF THE SE 1/4 OF SEC. 29, TWP 24 N., RGE. 6 E.,W M. KING COUNTY, WASHINGTON I. E. 51.47 4. 52 C TH. jW E. S. E. EX. Ic "C h�66 �� 520 h20 S ITCH AS 10 REGR D. S= 2.2 % t - 0 --• I.E. 8 6 •� y`6 0\ - - _ HT=4't o RIP -RAP g� -�CnNST. ROCKERY AT FL / PER DET. SHEET HT. =3' *- y0• � SO I. E. 44.0/r� l�oT ron/si. / ° CB NO.15-TYPE I s, GRATE '.59 48.7* k��� \� � i I.E.= 37.9999-12 41.83 _O / I \ Q Al n R i 44.23 i 0 �a / 44.05 T3_ o_ � v / de 43.67 43.43 �i ). 9-TYPE I EL.=42-73 42 C ' e°o,o , c' 4.58 / 42.83 43.68 46 cN �,. t 41.E FIN. FLR. EL.= 42.0 ,+1 0 LID 40.70 h ✓ 41.28 0.83 0 40.46 GB N �- .0 4038 40.69 40.11 - H' 40.14 41.28 39.84 5' - •1 14, 39.76 40.24 f 5% -HT. 40.00 GB 41.14 48 LF-12"CMP S=1.0 % �J- CB NO.14-TYPE I GRATE EL: 39.76 I.E.=37.51-12" NOTE: ALL CATCH BASINS LOCATED IN AREAS DESIGNIATED BY THE GEOTECHNICAL ENGINEER AS BEING UNDERLAYED BY COMPRESSIBLE SOILS SHALL HAVE TENSAR SS-1 GEOGRID PLACED ON RECOMPACTED STRUCTURE SUBGRADE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT. ADDITIONALLY, TRENCH EXCAVATION, BACK - FILLING, COMPACTION AND PLACEMENT OF MIRAFI FABRIC SHALL BE IN STRICT c N 92 LF-12%MP S =1.0 °/B N i CB NO. 13-TYPE GRATE EL.="rtr 40•171 '• I.E. =36.6-123C.7/S'a! 41.36 40.90 41.26 p2. I i"=201 STORM DRAINAGE AS -BUILT PER SECTION 7-4 CONSTRUCTION MANUAL FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION 1973 is C G C SURVEYING MAY 19. 1988. CONFORMANCE WITH THE RECOMMENDATIONS AND METHODS SUGGESTED IN THE REPORT. I -� I 42 bedding may be omitted provided the material in the bottom of the trench g - - is loosened, regraded and compacted to a firm and dense unyielding base. Q ,�2 45 4c,�a y 20/ � 20/ 1 I H - o 13. Construction of dewatering (groundwater) system shall be in accordance % e " ' / W I . with the APWA Standard Specification, Section 61-3.02. 10 4136� 41.36 14. Galvanized steel pipe utilized as detention facilities shall have 42.44 41.36 o II asphalt treatment #1 or better inside and outside. 40.55 40.91 1 -� rn 15. Structures shall not be permitted within 10' of the spring line of any 4 ,� 42.85 °c� o N 40.72 0 storm drainage pipe, or 15' from the top of any channel bank. 16. All drainage structures not on public rights -of -way shall have solid �� \ ° C B NO. 10 -TYPE I I II _ - 39.79' o GRATEE_.=3-86 1 , 40.47 0 39.85 II IW locking lids unless otherwise approved by the Department. 9 / 4206 o � � I.E. = 35r-FP-i2 3s.4 41.0o i N 17. All catch basin grates shall be depressed 0.10' below pavement level. A/ / / % 0 0 + II z 18. Catch basin grates installed on County right-of-way shall conform to , 42.61 GB \ 1.82 a 40.90 GB 40.12 40.46 40.76GB 40.42 39.55 39.0* standard drawings 39 or 44 which includes the stamping "Outfall to \ .,a / / / 2.55 % _ _ �- N 2 2% -� II Stream'; Dump no Pollutants" and "Property of King County". ah• k�6 r-- I.0% 2.2%-► ° 6 II `�� `�� i / o o 9 \h !T` �J 19. Plans showing all underground utilities must be provided to the Depart- ' � � 2 L° 44 0 � °cM 1 3�' �� I � ment's Development Inspection Section. Plans for water and sanitary �_y 40.72 / sewer must be provided prior to the preconstruction meeting. Plans for / -_ - '-` 0.95 % -'•- 39.73 40.23 40.46 + 39.25 all other utilities must be provided prior to the installation of road o %- 11 base course materials and must show the location of the location of �/ / T °� 2°� ,� /72 L.F. -12 C vIP the measures which will be taken to prevent soil erosion and sedimentation. ti 41.72 40.81 39.21 / S =1.0 % �41.82 41.68 ° �� 1 % 39.73 20. Open cut roadway crossings for utility trenches on existing traveled j % ro rn I l i`Sz;f roadways shall be backfilled only with pea gravel or 5/8 minus crushed I N 39.42 GB� / II rock and mechanically compacted. Cuts into the existing asphalt shall kg2 0 0 +39.66 39.89 38.68 II be a neat line cut with saw or jackhammer in a continuous line. A temp- -� aLd/-76L.F�-8"CMP- S=1.0° % orary cold patch must be placed immediately after Backfill and compac- �, II tion. A temporary hot mix patch shall be placed within 30 days and M a •4c.i 41.50 shall be the thickness of the original asphalt or 2 inches, whichever / O M / 39E{ 69 -�L CMPR S=1.0`Xr- �I is greater. CF c� 41.63 41.50 41.26 40.21 i' 338.54 21. All metal driveway culverts within County right-of-way must have con- �'h - -_ _ _ f 2 % f 2 % crete or masonry headwalls designed to be accepted by the Department. R ` 1.6 4 % 38.78 GB ` 22. Rock for erosion protection of roadway ditches, where required, must be 39CB NO.11-TYPE I CE NOA?_-TYPE I of sound quarry rock, placed to a depth of 1 foot and must meet the 41.25 �-'"��38.46I 38.40 '�� GRATE EL.=3.9a� GRATE EL=a8:68 39.05 II following specifications: 4-8" rock / 40-70% passing; 2-4" rock / 30-40% 42 �- 0 42 -� �- 3� 05 I.E.=36.8 -12 I.E.=36.9£-$ 37.o3 passing; and ,-2" rock / 10-20% passing. 2/\ ' 3r:.42' I.E.=66. -8" ' 23. All building downspouts and footing drains shall be connected to the R�$6 / 138 L.F. -12 CMP I I storm drainage system, unless otherwise approved b the Department. / , 2,,� 0 97 L.F.-o2 CMP 9 Y PP y P \k / I \ S=2.5 /o + S-I.0 /o00 V + 0 _ II G' /1®i� l�.� 5. 41.17 .......• E .MgSN 40.85 cn FIN. FLU. EL._4{.2 ° . CIO ' NOTE: ALL EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION i 40 SHOWN ON THIS DRAWING IS FROM A SURVEY PERFORMED -O "• r°� g 4;v= o ��8 BY BARGHAUSEN CONSULTING ENGINEERS INC. DATED a - 38.00 37.94 �STE JUNE 14, 1986. (THEIR JOB NO. 2097) °� ' �_ -� �- I ��' NA l 1•2%- ' -3%-4.32% MATCH LINE TO SH ET �. BASIS OF BEARING 12,33G6 \40.26 5' IIOL.F.-12��CMP S=1.0% / 37.80 38.16G8 39.50 WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE. I \ INST. 50 L.F.-15tMf \� CB NO. -TYPE-54'" CB N0. 8-TYPE I CB NO.7-TYPE II ,�8" APPROVED BY '� � �_ /Q �� SD-4 BENCHMARK DATUM S=1.0% \ GRATE EL.=39�& 3g:�i(o GRATE EL.=39+B 39.03' ,; ". Q GRATE EL.=3�.$9 38•00' CI Y OF RENTON F"JBLI KS DIRE TO I 5 I.E.=29.9 -36 3b- 2' 1. E. 3S.37' I.E.=342 12 34.70' WASHINGTON STATE DEPARTMENT OF TRANSPORTATION. I.E. = 3&6 24 3I.o3 SHEET___ OF 1 - Q �� ¢ !� JOB NO. 87-015 I.E. 34.5 REV. 10-24 -87 PER CITY REVIEW G-RADING DRAINAGE PLAN PREPARED BY: _. 3 IImi ��� EXIT � RENTON WASH. 775 IOYLWOOD DRIVE S.W. ISSAQUAH, WA. 98027 .0 2061 392 1471- Z It chi l� o � � O ny o C) CC � to N