Loading...
HomeMy WebLinkAboutTED4001929.1SEC. 9, TWP 23 N. RGE. 5 E., W.M. Z `1 R//`1 346.77 k- ovERfLow STORM MR � //YU. 940. 08 //y TY10E 17 a 34Z 2 //YU. 3g0.14 OUT �. O TO q/rj /YjH RIM 34447 a 23 0 0 //n/ 340.09 ouT 34 p 1 Q �, v R//'1 343.47 3 2 45. 34 ;n //y!/. 340.05 //Y 3433. 34 3 ° //YU. 337.le our w o 3 /1 " C/"I.a I /y O - /j " /7 Gl/ 900. OB " 1 ,�42_ _ I - - - - - - - - X D. .- z x x x X CHAlly L//y x x I 26 w �` w 65 - 34Z11 \N K 405 425 0 3p 34, 1 }p 34 3 3 3 ^ 34 v "� No W TZo iE f- 0� 20 W VI x3a2 0- - - )I( - - f - x a2 - 3a2 3a� Z O 3 � x IL v Rs MH 3� 34Z.99 ,335.0 I U 0. •� 1 q7. 30 Cs 3 TYPE.T w lal W 341-4. 34.1,14 Z INV. �> 6 3 37, 3 S V p 5Z LF-36 h CM P U7' o Ly Qw 3 - 750 GAL. OIL/WATER SEPARATOR 1 ' O (SEE DETAIL 8&,,NV) 000 RIM 6' S` 341 SB sD /� /- Too q2 35 3_ qt 4Z� 96 34Z L a 4: TYPE I r "IM 341.30 /vv. 336.98 5 MILL VIS0,UEEN t�,AR ,XZ;2 Z i�"' Jil ,I C SECTION B'-B INFILTRATION TRENCH A'3 N P L A I- T E R n1.t.9 ti 3 STANDARO FRANME i SOLID LOC_,KIN. G COVER. REiNr. r 3NC- `-AP T I- - - i f BLDG- A................... . . . . . . ...... � � I P� R WATER EAJEME/YT AF ¢B/04/30744 A,5 C/T r OF QE/Y701y /QECO!?DS W i W -_ ID I a•e LO YARD DRAIN I8'O K RIM 341. 2 1N1^V. 337. 4- _='�--'-- 4 30.0/ •� TIE NEW 6" T/GNTUIJE 1A17Z7 h �h EXISTING. VE'RI INV OF 337.4 < _ 33 3 /Z PU �Q/M 3 40 84 v //YU 333 8/ G 2 POURED iNTEGR/p,LLY o 1 1 /- /- /1 /I /D /1 /1 /J / - /I /J - c; ,< � wlTr i R(E)ER.s'-0" �. �_ /J /-1 / 1 /J /-1 / 1 / \ /-1 / . J \, \ \ =\" TOP OF EX. DRVWELL RIM= 341.58 MIN. GRADE EL. = �41 &9 34/,?D � W ~ >, N ADO RISERS AS NEEDED I I TOTOPOF VAULT EL. GRADE = 339.65 O o RI��� i 0 IJ � GENERAL NOTES :I I I • o " ' I I I o' 1. All work and materials shall be in conformance with the li (� `O �.; I ,° '.,ol 11 ' D '%I I 'b', .° standards and specifications of the Cityof Renton and AS-/3UIL �Lc=V - 66 the latest edition of the APWA Standards and , 4' f�ERF o.ol I I•.o I i I°'y p „ P) END E IL OUT = 339•S ^• I I 5; Specifications. / ,4NO A?/N1 D/ o „ 0/,L 6 6 /'z ,eA T� /� 3Y ;� e; __ 0 c 2. All locations of existing utilities shown are approximate /E��'� 62�635Mi}h' �� v i OIL/WATER SEA4RAT/ON and it shall be the contractor's responsibility to verify K2 LF 36 ¢ PEf F-C I12 T_EC> END rE l J INV. EL. IZ' 337.44. the true and correct location so as to avoid damage or 2b6 W /14/41/ti/ ALUM. CMP SD ---� ( CHAMBER �\ - disturbance. Call 1-800-424-5555 before you dig. 1W W1Zjj�e / INV. EL.6` 33C.75 3. A preconstruction conference and 24 hour notice will be 11 IZ CMP required prior to starting new construction. 1 _ 5 0 n I OIL RETAINER 6 I -93&.7 INV. OUT= 337.4 °4: BAFFLE 4. It shall be the contractor's responsibility to prevent L-_J -- °' any silt laden water from entering the existing drywell A+ IE = 33G.5 14 !c B during the course of construction. After all AGE 4' PERF INSPECTION FLOW DIFFUSER construction is completed, the contractor shall flush out t� --W ��\\\� ei O SAMPLING ///k_a EE BAFFLE the entire storm sewer system and remove any silt and �� (BY CTNER$) debris from the new oil/water separator and existing :60 / „ GRIT/SLUDGE drywell. = I (� J Exi C7 I N C, 30RETAINER WEIR 5. All pipe and appurtenances shall be laid on a properly e d DRYW EL► prepared foundation in accordance with Section 7-02.3(1) ,_; •. � f of the current State of Washington Standard -►�' �_ N Specifications lins for s r d end Bridge tConstruction. n t ructri obn. This ;r� ••••• i4 I shall include nec s a y leveling f e trench bottom or �� PEA GRAVEL .•- :; _ r._ I' SOLID •'�. m m BE3Dj R� ,, _ the top of the foundation material as well as placement drr+ ,- o: o and compaction of required bedding material to uniform t DRYWELL = 332.58 \�i, �/ � %11 E <� -. , :.. •, ' - .f .. _ �(J111� �l l � g �l V BOT OF • _ grade so that the entire length of the pipe will be / = --� %• \\` T /^" / \ �� �',7 b -SO -- - supported on uniformly dense unyielding base. If the T. OF VAULT 332 48 . - ted a native material in the bottom of the trench meets the requirements for "Gravel Backfill for Pipe Bedding" the OIL / WATER SEPARATOR VAULT DETAIL first lift of pipe bedding may be omitted provided the material in the bottom of the trench is loosened, UTILITY VAULT 5 7 7" L A OR E Q U A L regraded and compacted to form a dense unyielding base. SECTION A -A -- BEDDING & BACKFILL ALL STORM PIPE 5HALLL3E ElTdER A--,,�I+ :ONCRE�n. NTS LOOSING WEST SIPS 09 E FDrr G i- `: HAL. L e3PE ' 8 .". i FILTRATION M I J 721 PIKE HALL C3 GA E , 3>1 /2 CMP r t a SCALE: 1" :: 20' MERIDIAN: K.C.A.S. DATUM: CITY OF RENTON aA 6 \ EX/ST. SPOT ELEVATIONS x18 PROPOSED FIN. GRADE ELEVATIONS - - -LOWLINE ' SURFACE DRAINAGE DIRECT/ON sD EXIST7NG UTILITIES --Q--�� PROPOSED STORM DRAINAGE - -- - - PROPOSED DOWI✓SPOUT TIG14TLINE O ROOF DRAIV SEE ARCH- PLA Hilltop Nssoc. 10709 Beardslee Blvd., Suite 201 Bothell, WA. 98011 Phone: 486-1455 Contact Person: Norman Gravmann LEGAL DESCRIPTION All interest of the grantor in the following) described property: The South 400 feet of the East 200 feet of the following described properly: h The Southwest quarter of the Southwest quarter of the Southeast quarter of Section 9, Township 23 North, Range 5 East, W.M., in King County, Washington. EXCEPT the East one acre, AND EXCEPT the South 30 feec. for road. Z I �`-�"'-� /''•'----�- J�i��/ems' , O W Q a a PRUVICE Prill) TOGRAr"IC 0. 0. MYLAR AFTER AS- S".aILTI >IC O I� BLVD. J aaR TN ST. Z o� eon u.e. R Q W SITE I = W _z IL T, 7177� LL 11Z Z J O Z W LL O V VICINITY MAP scaE i"=Igo`± SKEET 1 OF 2 JOB NO. 86-4506 x a z i zd trJ o � Cn o xt7' o � t