Loading...
HomeMy WebLinkAboutSWP5002046.3r n E F G y 5 4 3 2 1 EXCAVATE APPROX 60' OF 18" SD. RELAY PIPE TO MH-2 BY DEFLECTING JOINTS. (ALTERNATE METHOD: USE 22 1 /2' SPECIAL FITTING AS SHOWN.) \ \ / APPROXIMATE LOCATION OF EXISTING 12" FORCE MAINS TIMBER BULKHEAD , EXCAVATE APPROX 28' OF 10 SD. RELAY ' PIPE TO MH-2 USING ' INv ►�. 5q (3) 11 1 /4' BENDS � SEE DETAIL AG3 96„EFFLUE� INV 101.00 - - - - - - -- - - - - - ,INV 113.0 _ 2 -----LW 115.43 6 , 120" OU TFALL / EFFLUENT JUNCTION STRUCTURE PART PLAN F, SCALE: NO oA SCALP - EL 101.0 GROUT COVER AROUND CIRCUMFERENCE ! 4" ! 3'-8 i GENERAL NOTES: 1. AS BUILT CONDITIONS AT THE STRUCTURE ARE UNKOWN. MODIFICATIONS SHOWN ARE SCHEMATIC IN NATURE. THE CONTRACTOR SHALL MAKE MODIFICATIONS AS NECESSARY TO ACHIEVE THE FOLLOWING: a. RE-ROUTE 10" AND 18" STORMWATER PIPES TO MH-2. b. MAKE 30" DI CONNECTION BETWEEN MANHOLES, INVERT AT 113.00 FLAP GATE AT MH-1. c. PLUG HOLE IN BOTTOM OF MH-2. d. MAKE 18" CONNECTION WITH SD TO STORMWATER PS. KEY NOTES: O SEAL 3' DIAMETER OPENING FOR 25 FEET OF WATER PRESSURE FROM EITHER DIRECTION. SEE DETAIL A. �2 BREAK OUT EXISTING MANHOLE(S) TO INSTALL PIPE. GROUT PIPE IN PLACE. O 30" FLAP VALVE WITH ANTI -LOCKING BAR, RESILIENT NEOPRENE SEATS, TYPE 304 SS HINGE PINS. RODNEY HUNT SERIES FV-AC OR EQUAL. O 30" DUCTILE IRON PIPE FLANGED x PLAIN END, INVERT 113.00. O PLUG OPENINGS OF EXISTING 10" AND 18" STORMWATER PIPES. O INSTALL STOP ON MANHOLE WALL TO PREVENT GATE FROM JAMING IN THE FULL OPEN POSITION. �7 PROVIDE (12) EQUALLY SPACED "Z" CLAMPS AND EXPANSION ANCHORS. EXISTING 6' DIA MANHOLE (MH-2) I I ! Z" THICK TOP OF EFFLUENT 1 / JUNCTION STRUCTURE SS PLATE _—_f�1 wr z_j o c 0 0 o� Z U _ U U - Z UQ Li MANHOLE OPENING SEAL zNJ Lj A Cdn�s�c-Xo as 6u� l� 14�a i (a 61c. U DETAIL G3 z Q— SCALE: NO SCALE 40 20460 I 1 /2" THICK NEOPRENE GASKET Brown and Caldwell HC Consultants Seattle, Washington DATUM NOTE: ELEVATION 100.00 EQUALS MEAN SEA LEVEL, 1929 U.S.C. & G.S.(ADJUSTED 1947) COORDINATES ARE BASED ON LOCAL PLANT GRID N � � 7 �° DESIGNED: JP/GN 'I �' METRO Municipality of Metropolitan Seattle �' DATE: MAR 1992 DRAWN: SEACAD CHECKED: GRH SCALE: NO SCALE METROS REGIONAL TREATMENT PLANT IN RENTON ENLARGEMENT IIIA STORMWATER PUMPING STATION PROPOSED STORMWATER MODS AT EFF JUNCTION STRUCTURE M H FILE NO: RECOMMENDED: DRAWING NO: G3 CONTRAC W�/T""��NO: 37-91 WPC 2$ NO: REVISION BY DATE APPROVED: SHEET N0: OF , EXPIRES 5/27 .-k .. , 5 4 m 01FILM n