Loading...
HomeMy WebLinkAboutSWP2702103.24CONSTRUCTION NOTE: A 3:1 slope shall be maintained where possible b l e N ' P �y E 1,653,250 between the maintenance berm and the permanent --�--- � ' E 1,653,250 easement boundary. Where there isn't enough run (, pp O for V co 1 slope, as flat o 0 t slope as , pos sible, ibl e o P � o P P \ �n not steeper than 2:1 sha I I be o o 0 v '`+ o m intained. o � �r o In J ti � b �� V ti z )C ; z z ti ;N - -' �b i NOTES: b 1 co Fen edtbY others 0 mo" Location of Utilities No 0�� - or nonreprexistencenof$anode as to utilitleshE ubllcexistence or ENT g O v _ w private. Absence of utilities on these draw 1 EM - icn; _ --+F_� - i ngs is not assurance that no utilities are io S ENT E A °- m present. If buried utilities are shown the - - P ER �, - _� - y - ►�"� f k '� -- . - N 175,362.88 location and depth are approximate. The exact t-- _-' _ _�O E 1,653,429.45 location and depth of any uti I ity must be _ - -- �� _ Pipeline ; _ - a• -�� Fence tO be s - e gee r�l �� - 20• WNG __� determined by the utility company prior to any rno ed by - -` - apaiAt r'anc_ !�- j --��`- i - - -� o excavation. v e �-- - - - '- - --, 2. The disturbance of the WNG high pressure gas 3� 0 pipeline may create hazard to I i fe and property e 6 _ _ >4t8, �- `oW �o` han �-1�3 46, I ___ _ Y f N caution Faust be exercised rh i I e equip - Extreme �� g 4 _ m nt is being operated in the vicinity of the - - �- - 6 _ - - e Tine. - _- ' ` _ m pipe - - 1 Lining -ff 3. Washington Natural Gas (WNG) representatives 8 - Grave t B-103 _ Dike _ W v' 1a - shall be notified and shall be on site during Oa dale Ave S any excavation over or adjacent to their 200 �U- - _ 16 G high pressure gas pipeline. _ __ _ ,o urb _�iev ToP Dike_ E -� 1 _ f W N 174,58l..30 /--- - =�-`_ �_ . — �; - Sdale Ave. S O _ _ Oak E 1 653 595 88 �� c 4 r t i -r o t LEGEND e 1 F �11 n . 't w - n r a r 10 n w -- ; _ - C h W n for c1a Temporary Construction Limit — o / R w II -�..- �o _ NDA otto� e� _" _ - 0` Permanent Easement Boundary Go tt � _ _ - O o - m , O �O\k Fait I; - _ SEMEN i ado not to - - -- J. N M NEN� E A B -10 20. Gra�O L' F�o�., �) V ��SPOIL DISPOSAL AP'_ E 1,653,750 00 + t - gPR E 1,653,750 0 O k O O CURVE DATA O O U o ti �= 7004' 19+ U') ti 2 D = 7" 0 4` 5 1" MI A A I Z Limit 1 0- i iN .O ,00 ,tD r� 10- ELEV 9.0 J ELEV 0 i 687-f00 Jwp, ly8+00 R=809.16' T = 50.001 L = 99.871 t S= 0.0002 ft/ft Low Flow Channel Bottom 0 PRQFI - �+ r/ L C i L ELEV =0.2 69000 691t00_ 693t00 ;694100 695+00 CL Channel F--- METRO Sewer Pipeline WNG 20 N Gas Pipeline ----- -- — Power Transmission Line 1211 Water Main P- 1 CHANNEL, STA 680+26.37 to 706+55 EAST SIDE GREEN RIVER WATERSHED KING COUNTY WASHINGTON U. S. DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE pate APProved�Y------------------- - -- RDH DD KB4.1a6 Title----. ---.-------------- -------- Drawn.R D H,--S M-At--RR 44-8 6- --- -- ----------------- TracedSheet aMing No Checke of 3d\.+I . KB------- - -- -- - g/g�. 1ESR VQ GPO; 1912 O -46) 261 ' "" SCS-FNG 318 (Ju!y 1912l