Loading...
HomeMy WebLinkAboutSWP2702862.82" PVC TO IRRIGATION & CONTROL WIRES PROPOSED UTILITIES r. a� 4a v C rn -v c v O v U L U E C U E U 0 v U v a 0 D U 0 _0 N L +, C 0 C 0 v E L 0 C 0 0 C v 0 0 v L a� v 0 N 0 v c L Q v v v v 0 I,- 0 1 rJ N 1 (0 0) 0 4-1 0 U v -v L O U U v v U •C 0 L 4-1 N a� 0 0 v s C N U O —G —G G G G G- G G G NORTH WALL CAP i FA W -----' --P T-------- T —p -- —p T __-_____- p i T G G —G _G - -G G - -GPUMP DISCONNECT G -G ---G ---- C; G G -- (SEAL-OFF) VAULT --G ----G -- ACCESS ROAD PRE—EN/N) SEE SPE PRECAST CONCRETE VALVE VAULT [-MOVE SEE SPECIFICATIONS P— ---G -- 'SD - SD ___SD -----'SD A -LINE a 18+ 70(50.0' LT) 6" SLEEVE _P p —J T- G -- G G--G_ G WET WELL CENTER SD sD---�"SD 0 CRC 3/4" HOSE BIB r SD BOLLARDS bit UNDERDRAIN A -LINE 18+07(45' LT) X/ `�, m ; MOUNT TO WALL* 10 0 STEEL CASING it , t ; , y � YARD CDSM LIMIT PRECAST WET WELL X - _ ` _____ HYDRANT SEE SPECIFICATIONS --ill +'-�� --- ;� / VALVE VAULT C� " _' (SEE DETAIL) YARD LIGHT I / A -LINE LT) FOOTING PERIMETER MOVED i � 1 TELEMETRY POLE NEW 4 4 _.._.n ._m .._.__. ._". . ,._ _ _-.r____--_,_. �.. �_ _ __....�,�_ _.,.. .-_,, _.�_.., _�.�__ _ �"...__..,,.. __. _�, ._� ._,_-_. _. -�.. __� ��______��� ___ ..... __.r_ _.,a..___ _.. � _. _v___� _.___.•_ .,_, __._, __._. __ .._ A �t1TD UD UD UD UD UD UD UD UD UD -----UD UD UD UD U UD ,_D D U�? UD - —uu- UDU UD UD z r r, , r t s ' 3 6 i / f ; 5 i •` r Ti t' s} i b i d 1 y 1 } v i t •.. �.,...,..- ..._.. ......, .-..,. � •e — — _— — — <_ _ -_, —.. e"— �ej(_ _Xs �,.— ex®, `—x_ '=„„as.,-' •^q+..,x_ is is A .. m , CBS SIDEWALK 1. E. = 1.4 SEE DRAINAGE PLAN AND I DRAINAGE PROFILE UD UD UD UD UD —U. -UD UD U — 17+50 D UD UD UD 18+00 A-LINE (� SOUTH 180TH STEEE CORE DRILL THROUGH PRIMARY SHAFT, CDSM, STEEL CASING, LEAN CONCRETE, AND WET WELL. INSTALL 12" STORM DRAIN. BACKFILL WITH NON -SHRINK GROUT. CHECK FOR AND REPAIR ANY GROUNDWATER LEAKS. BACKFILL TRENCH INTO CDSM, INSIDE PRIMARY SHAFT, WITH CDF TO FINISH GRAD GENERATOR PAD REVISIONS - CONTROL BUILDINGZPUMP STATION NOTE: I. BASE SIZE & DETAILS CHANGED ARE ONLY SHOWN HERE, FOR ADDITIONAL DETAILS OF BASE SLAB & CONDUITS ETC, REFER TO SHEET C41C 2, ADJUST REBAR DETAILS TO FIT NEW SLAB DIMENSIONS, USE #4 REBAR ON 12" CENTERS, EACH WAY, TOP & BOTTOM , 3, CONTRACTOR TO PLACE SPECIFIED CONDUITS BASED ON LOCATIONS RECOMMENDED BY GENERATOR SUPPLIER. 4• PROVIDE TWO ADDITIONAL CONDUITS THROUGH GENERATOR PAD FOR FUTURE USE, GENERATOR HOUSING VENT END CONCRETE BASE SLAB 10'x10' CONTROL BUILDING ELEVATION FOUNDATION PAD 516' 2.5'7_ 10' NEW ELE VAULT Ln N Ln N in 3 125' GENERATOR PLAN '9 o d Z\1 —ENGINEERING— STREETS— WATER— SEWER— PARKS— BUILDING— J Z y v>� p * 1908* Lasf So�ed on Wed May >8 2005 at 03.•04PM by Hami/fon File Name.• 0.• 12000IA00084I CADD I dwgs I C-38.dwg Sco1e.• 5 CTRICAL D UD UD UU — 26' -. M I A k I RIM EL 27.20 R PUMP DISCONNECT WM1���y�#` (SEAL -OFF) VAULT EL 26.St GENERATOR CONTROL 5 CONCRETE PAD BUILDING 10x16 CONCRETE PAD A-1_dINE ° 0-t--o0(40.0' LT) U UD UD lip —UD — _ -JD UD UD —UD UD � �D UD UD UD UD 18+50 CONDUITS BY PSE UTILITY VAULT POWER -- - ® -I I I - _ ).- -- -_- - _ - ANY SIZE NOZZLE UP TO 2 1 /2" NST IRON NOZZLE GAP L 0 C K I N 5 COVER G TRAFFIC BREAK -AWAY COUPLING R R BRASS OPERATING SCREW EL 27.13 RIM EL 27.0f BRASS PACKING NUT EL 26.70 f- . /TOP OF IRON TOP CAP C0�'T"?L P!JILDING SLAB GENERATOR SLAB 2" PIPE BRASS CONNECTION NUT EL 26.St OPERATING ROD men BRASS PLUNGER 10'0 STEEL THRUST SEAT RUBBER CASING BLOCKING I BRASS VALVE WITH �_ 1. E. 23.5" \-t VALVE VAULT 2" FIP INLET o 0 UNDERDRAIN VTHRUST BLOCKING #77 MAINGUARD HYDRANT � SCALE: N.T.S. 7'0 WET WELL LEAN CONCRETE CONSTRUCTION NOTES: I, EXCAVATION FOR WET WELL SHALL BE ACCOMPLISHED BY AUGERING TO MINIMIZE AREA OF EXCAVATION AND INSIDE BOTTOM ELEV = -4.87 VOLUME OF DEWATER I NG . VALVE VAULT MAY BE INSTALLED USING OPEN TRENCH EXCAVATION METHODS. EL -5.8 2. REFER TO SOILS BORING INFORMATION PRIOR TO DRILLING 10-FOOT DIA SHAFT: SEE SPECIFICATIONS, BOTTOM OF /R� 0 WET WELL ®< 3. CORE -DRILL ALL VAULT PENETRATIONS, GROUT WATERTIGHT AFTER PIPE INSTALLATION. NO FITTINGS OR LEAN CONCRETE FASTENERS SHALL BE INSTALLED WITHIN 4" OF GROUT PACK, 4. WET WELL AND VALVE VAULT TO BE CONTRACTOR DESIGNED AND CONSTRUCTED, CONTRACTOR SHALL PROVIDE REINFORCING AS REQUIRED TO WITHSTAND DESIGN FORCES AND SHALL PROVIDE REINFORCING REQUIRED TO WITHSTAND THE ADDITIONAL FORCES IMPOSED BY THRUST BLOCKING, THE BASE OF THE VAULTS SHALL BE DESIGNED TO WITHSTAND BOUYANCY UPLIFT FORCES, DESIGN GROUNDWATER ELEVATION SHALL BE EL +20.00 DURING CONSTRUCTION AND EL +23 0 FOR COMPLETED WET WELL SEE SPECIFICATIONS FOR EL -29.0 ELEVATION _'® • • - CONSULTANTS •- • -• m 1 t 9TH AVENUE SOUTH FEDERAL33301 • - • BERGERIABAM 9:11 •11 VOICE:ENGINEERS I NC. 1• 1i R (206)431-2250 ADDITIONAL INFORMATION. �--- (* HOSE BIB PER 9-15,10 STANDARD SPECE _ 5 0 5 10 1 "= 5 scale feet R 3/11/051 RECORD COPY ' 3 !9/21/01 ADDENDUM NO. 3 SOUTH 180th STREEGRADE no date revisions frT r job no _ j84 scale 1 "=20'H, date 20-Feb-2001 / C c w 00 0 H m F= C Z O 0 0 J � a b o t=i C� y