Loading...
HomeMy WebLinkAboutWTR2702953.54A I B I C I D co STRUCTURAL CONCRETE MASONRY UNIT GENERAL NOTES LQ 1. CONCRETE MASONRY UNITS: BLOCKS SHALL HAVE A LIGHTWEIGHT CLASSIFICATION AND CONFORM TO ASTM C90, LATEST EDITION, GRADE N, TYPE 1. MINIMUM COMPRESSIVE N STRENGTH OF UNITS OF 1,900 PSI WHEN AIR CURED FOR 28-DAYS. MINIMUM COMPRESSIVE STRENGTH OF 1,500 PSI OF MASONRY WALL ASSEMBLAGE AT 28-DAYS. CV 2. MORTAR: PROPORTION MORTAR TO CONFORM TO THE REQUIREMENTS OF UBC TABLE 21-A (ASTM C270) FOR TYPE S MORTAR. DO NOT USE MASONRY CEMENT. RETEMPER MORTAR ONLY BY ADDING WATER INTO THE MORTAR AND THEN WORKING WATER INTO THE MORTAR. RETEMPERING MORTAR BY DASHING WATER OVER THE MORTAR IS NOT PERMITTED. ANY MORTAR UNUSED WITHIN 2 1 /2 HOURS OR GROUT THAT IS UNUSED WITHIN 1 1 /2 HOURS AFTER INITIAL MIXING SHALL BE REMOVED FROM THE WORK. 3. GROUT: MINIMUM GROUT STRENGTH OF 2,500 PSI. INCREASE CEMENT CONTENT OF THE GROUT, AS NECESSARY TO ACHIEVE THE SPECIFIED MASONRY ASSEMBLY STRENGTH (f'm) g AND ADEQUATE WORKABILITY. GROUT COMPRESSIVE STRENGTH WHEN TESTED PER UBC STANDARD NO. 21-18 SHALL BE EQUAL OR EXCEED THE CONCRETE MASONRY UNIT STRENGTH. GROUT SHALL HAVE A SLUMP BETWEEN 9 AND 10-INCHES AT THE TIME OF PLACEMENT. ALL CELLS SHALL BE FILLED SOLIDLY WITH GROUT. ALL GROUT SHALL BE CONSOLIDATED BY MECHANICAL VIBRATION. 4. ADMIXTURES: ADMIXTURES ARE NOT PERMITTED IN MORTAR OR GROUT UNLESS FAVORABLY REVIEWED BY THE ENGINEER. 5. AGGREGATES: SAND FOR MORTAR SHALL CONFORM TO ASTM C144 EXCEPT NOT LESS THAN 3% OF THE SAND SHALL PASS THE NUMBER 100 SIEVE. SAND AND PEA GRAVEL FOR GROUT SHALL CONFORM TO ASTM C404, TABLE 1, COARSE AGGREGATE, EXCEPT WHEN OTHER GRADINGS ARE SPECIFICALLY APPROVED BY THE ENGINEER. 8 6. WATER: WATER USED FOR MORTAR AND GROUT SHALL BE CLEAN AND FREE FROM DELETERIOUS AMOUNTS OF ACIDS, SALTS, ALKALI, AND ORGANIC MATERIALS. 7. REINFORCEMENT: REINFORCING SHALL BE ASTM A615-GRADE 60. REINFORCEMENT SHALL BE FULLY EMBEDDED IN GROUT. EMBEDDED ITEMS SHALL BE SECURED IN PLACE PRIOR TO GROUTING. PROVIDE A MINIMUM OF 1-INCH GROUT AROUND BOLTS IN MASONRY. PLACE HORIZONTAL REINFORCING IN BOND BEAM UNITS. VERTICAL REINFORCING SHALL BE HELD IN PLACE AT TOP AND BOTTOM AND AT INTERVALS NOT EXCEEDING 200 BAR DIAMETERS. UTILIZE REBAR POSITIONERS TO ACHIEVE VERTICAL REINFORCING PLACEMENT. HORIZONTAL REINFORCING SHALL BE PLACED IN BOND BEAM UNITS, EXCEPT LINTEL UNITS SHALL BE USED OVER OPENINGS. 7 8. BEFORE PLACING BLOCK ON CONCRETE, CLEAN CONCRETE, ROUGHEN CONCRETE SO THAT AGGREGATE IS EXPOSED TO 1/4-INCH AMPLITUDE AND APPLY BONDING AGENT. 9. LAY ALL MASONRY WITH COMMON OR RUNNING BOND. CONSTRUCT ALL MASONRY TO MAINTAIN AN UNOBSTRUCTED VERTICAL CONTINUITY OF THE CELLS TO BE FILLED. THE VERTICAL ALIGNMENT SHALL BE SUFFICIENT TO MAINTAIN A CLEAR, UNOBSTRUCTED VERTICAL FLUE CONFORMING TO THE REQUIREMENTS IN UBC TABLE 21-C. 10. CONSTRUCTION JOINTS: WHEN GROUTING IS STOPPED FOR A PERIOD OF 1 HOUR OR LONGER, FORM HORIZONTAL CONSTRUCTION JOINTS BY STOPPING THE GROUT POUR 1 112 INCHES MINIMUM BELOW THE UPPER -MOST UNIT, EXCEPT AT THE TOP OF WALLS. 6 11. CONTROL JOINTS: LOCATE CONTROL JOINTS AS SHOWN ON PLANS OR AT 20'-0" MAXIMUM SPACING WHERE NOT SHOWN BUT NOT LESS THAN 2'-0" FROM A JAMB OR OPENING. PLACE BOND BEAM REINFORCING CONTINUOUS THROUGH EXPANSION AND CONTROL JOINTS, WRAPPING BARS WITH 1/8-INCH THICK BOND BREAKING TAPE 2'-0" BOTH SIDES OF JOINT. D-j NOT SPLICE BOND BEAM REINFO, CING WITHIN 6'-0" OF AN EXPANSION OR CONTROL JOINT. 12. SPECIAL INSPECTION: WHERE THE BUILDING, STRUCTURE OR STRUCTURAL ELEMENT REQUIRES SPECIAL INSPECTION AS NOTED ON THE PLANS THE OWNER WILL PROVIDE SPECIAL INSPECTION IN ACCORDANCE WITH UBC SECTION 1701.7. 13. INSPECTION: ALL WORK SHALL BE INSPECTED BY THE OWNER'S REPRESENTATIVE OR THE BUILDING OFFICIAL. THE CONTRACTOR SHALL MAINTAIN ALL WORK ACCESSIBLE AND EXPOSED FOR INSPECTION. INSPECTION SHALL INCLUDE BUT NOT BE LIMITED TO CHECKING J CELLS FOR DEBRIS PRIOR TO GROUTING AND SIZE AND PLACEMENT OF REINFORCEMENT, ANCHORS, AND OTHER IMBEDDED ITEMS. 14. REINFORCEMENT TOLERANCES: UNLESS NOTED OTHERWISE ALL VERTICAL WA-L REINFORCEMENT PLACED IN A DIRECTION PERPENDICULAR TO THE WALL PLANE SHALL BE PLACED WITHIN A TOLERANCE OF ±1/2 INCH AND ALL LONGITUDINAL REINFORCEMENT SHALL BE PLACED WITHIN A TOLERANCE OF ±2 INCHES. N 3 2 - TYPICAL WALL REINFORCING SCHEDULE I BUILDING WALL THICKNESS VERT REINF HORIZ REINF REMARKS INSPECTION TREATMENT ROOM 101 WALL @ 1 BTWN A & F 8" #7 @ 8" #5 @ 24" ?-#z @ TOP OF WALL SPEC. INSP REQ'D WALL @ 9 BTWN A & F 8" #7 @ 8" #5 @ 24" 2-#5 @ TOP OF WALL SPEC. INSP REQ'D WALL @ A BTWN 1 & 9 8" #7 @ 24" #5 @ 24" 2-#5 @ TOP OF WALL SPEC. INSP REQ'D WALL @ F BTWN 1 & 9 8" #7 @ 24" #5 @ 24" 2-#5 @ TOP OF WALL SPEC. INSP REQ'D PUMP ROOM 102 WALL @ 1 BTWN F & H 8" I #5 @ 24" #5 @ 24" I 2-#L @ TOP OF WALL SPEC. INSP REQ'D 'WALL @ 6 BTWN F & H 8" #5 @ 24" #5 @ 24" 2-#4 @TOP OF WALL SPEC. INSP REQ'D WALL @ F BTWN 1 & 6 8" #7 @ 16" #5 @ 24" 2-#4 @ EL. 98.83± SPEC. INSP REQ'D WALL @ H BTWN 1 & 6 8" #7 @ 16" #5 @ 24" 2-#4 @ TOP OF WALL SPEC. INSP REQ'D !INTERIOR WALLS 8" #6 @ 16" #4 @ 24" 2-#4 @ TOP OF WALL FULL HT. TO THE BOT OF MTL DECK, UNO. SPEC. INSP REQ'D SCHEDULE REINF SHALL APPLY IN ALL CASES UNLESS NOTED OTHERWISE ON SPECIFIC DETAILS OR SECTIONS. SURVEYED: DESIGNED: ACY DRAWN: ACY CHECKED: DLB APPROVED: SEM RECORD DRAWING NO. REVISION A B 12/0 BY DATE APPR 6 D E 12" MIN. f ' ADD'L #5 BAR VERT 4. ADD'L #5 BAR VERT �i OPEN END BLOCKS o _ THROUGHOUT a- o I N NOTES: 1. PLACE VERTICAL REBAR AT CL OF WALL. 2. SEE SCHEDULE BELOW FOR TYPICAL WALL REINFORCING. 1 /2" MIN CLR CORNER INTERSECTION W=2953D7 48 BAR DIAMETERS OR 2'-0" MIN. (TYP.) wz a� o_ �o Q -I M N co Of AT DOOR O OPENING EXTEND DOWELS TO FOOTING LINTEL REINFORCING PER LINTEL SCHEDULE, WHERE EXTENSION IS NOT POSSIBLE, EXTEND BARS AS FAR AS POSSIBLE AND PROVIDE STANDARD HOOK (TYP.) 2 - #5 (TYP.) UNLESS NOTED OTHERWISE SEE JAMB REINFORCING SCHEDULE (TYP.) TOP OF CONCRETE I ' NOTES: 1. FOR WALL REINFORCING SEE RELATED SECTIONS AND DETAILS 2. EXTEND JAMB BARS FLOOR TO ROOF WHERE OPENING EXCEEDS 4'-0" IN WIDTH; OTHERWISE EXTEND 48 BAR DIAMETERS OR 2'-0" MIN. 3. DOWELS FOR JAMB BARS SHALL MATCH JAMB REINFORCING SCHEDULE. JAMB REINF. SCHEDULE OPENING WIDTH REINFORCEMENT LESS THAN 5-0" 2-#6 FOR 8" CMU 5-0" TO 14'-0" 2-#7 ELEVATION SCALE: 1 /4"=l'-O" LINTEL REINF. SCHEDULE OPENING WIDTH REINFORCEMENT ' LESS THAN 5'-0" 2-#5 FOR 8" CMU 5'-0" TO 14'-0" 2-#7 1, 2 VERT REBAR AT 4" HIGH UNITS ONLY 2 ST'D BOND BEAM BLOCKS HORIZ WALL REBAR BOND BEAM BLOCK (AT ALL HORIZ REBAR) CONCRET N.T.S. WALL REINFORCING WITH STANDARD HOOK L 8" CMU GROUT EVERY CELL (TYP) — TYP WALL REBAR U#3 HAIRPIN TIES @ 8" C.C. 2-#5 BARS TYP (OR AS NOTED) LINTEL BLOCK DO NOT CONTINUE SOLID BEAM BLOCK BEYOND JAMB BLOCK WALLS Al T HOOK B REINF. SCHEDULE JAMB OR END OF WALL —PLAN NOTE: MINIMUM BOLT SPACING SHALL BE 12 BOLT DIAMETERS WITH A MINIMUM EDGE DISTANCE OF 6 BOLT DIAMETERS AND WITH A MINIMUM 6" TO END OF WALL. BOLT EMBEDMENT SCALE: 1' = 1'-0" LINTEL BOLT EMBEDMENT SCHEDULE BOLT SIZE EMBED 1 /2" 4" 5/8" 4" 3/4" 5" 7/8" 6„ 1„ 7„ RECORD DRAWING THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED ON INFORMATION PROVIDED BY THE CONTRACTOR AND OTHERS. KENNEDY/JENKS CONSULTANTS HAS NOT VERIFIED THE ACCURACY OR COMPLETENESS OF INFORMATION PROVIDED TO THEM AND DOES NOT WARRANT THE ACCURACY OR COMPLETENESS OF THESE RECORD DRAWINGS. USERS OF THESE RECORD DRAWINGS ASSUME ALL RISK OF LOSS RESULTING FROM THEIR USE. N 1 1'1" A11A1 INTERSECTION AT CONC P 10 I I 7 0 5 I I 12 SCALE: AS SHOWN �= CITY OF RENTON DATE: 1 VERTICAL: NAVD 1988 � DEC 2005 ECONOMIC AND ENGINEERING Planning/Building/Public Works Dept. ONE INCH HORIZONTAL: NAD 1983/1991 Kennedy/Jenks PROJECT No. SERVICES INC. 3-01-358 AT FULL SCALE Consultants MAPLEWOOD 32001 32nd Avenue South, Suite 100 10900 NE 4th STREET, SUITE 1110 WATER TREATMENT AND GOLF COURSE IMPROVEMENTS REVISION NO. WASHINGTON 98005 IF NOT ONE INCH DATUM Federal Way, Washington 98001 BELLEVUE, SHT NO. SCALE ACCORDINGLY PORTLAND, OR / BELLEVUE, WA / KENNEWICK, WA / OLYMPIA, WA STRUCTURAL REINFORCED CONCRETE MASONRY UNIT AND STANDARD DETAILS DWG NO. S3 E G " K L M i N W - 213 5 3 A A SCANNED OCT 2 7 ?� ro w ao 41 0 �n W