Loading...
HomeMy WebLinkAboutWTR2702953.68C'7 LO M N CV rr 0 • 7 Di 5 Ell 1 "0 SAMPLE PORT (2) 0 TYP (3) PLCS LSH 3" FL G 413 z LSL Q 413 SH 413 w w cn z 0 Q z z 0 0 w � z U V-4/b > — V-473 V-454 E F 1 6'-0" G H 16'-0" J F 1-1 1_; U 1/2"—SA (#7) (GAC TREATED WATER AFTER RECYCLE) F�LTER ROOM V-839 0 1/2"—SA (#6) (TREATED WATER IMMEDIATELY AFTER AC) MATCHLINE FOR CONTINUATION, SEE DRAWING M4 C B GENERAL NOTES 1. CONTRACTOR SHALL CONFORM TO PIPE ROUTING & ARRANGEMENT AS CLOSELY AS POSSIBLE. NOT ALL 6. PROVIDE FOR DISASSEMBLY OF PIPING AND PIPE SUPPORTS TO ALLOW HORIZONTAL REMOVAL OF A PIPING, VALVES, FITTINGS AND ACCESSORIES ARE SHOWN. PROVIDE ALL PIPE, VALVES AND ACCESSORIES AS PRESSURE VESSEL WITHOUT THE NEED FOR REMOVAL OF ADJACENT PRESSURE VESSEL AND PIPING. 3 SHOWN ON INSTRUMENTATION DRAWINGS EVEN THOUGH NOT. SHOWN ON THIS DRAWING. 7. FOR BACKWASH BASIN OVERFLOW / AIR GAP STRUCTURE SEE CIVIL DRAWINGS 2. AS SHOWN ON DRAWING M2 ALL MAJOR PROCESS PIPING IN THE FILTRATION BUILDING SHALL BE BLACK 0 STEEL PIPE. DRAWINGS DEPICT FLANGES. HOWEVER, EXCEPT AS NOTED OTHERWISE BELOW, GROOVED 8. FOR REQUIREMENTS OF GREENSAND (GS) FILTRATION SYSTEM SEE SPECIFICATION SECTION 1 1357. COUPLINGS ARE ACCEPTABLE. IF GROOVED COUPLINGS ARE USED, GROOVES SHALL BE CUT, NOT ROLLED, AND MINIMUM PIPE THICKNESS SHALL BE 3/8". 9. COORDINATE PRESSURE VESSEL NOZZEL LOCATIONS WITH PIPING PRIOR TO TANK AND PIPE FABRICATION. 3. ALL VALVES SHALL BE FULL FLANGED. NO GROOVED JOINTS OR WAFER STYLE VALVES SHALL BE PROVIDED. 10. FOR PIPE SUPPORT RACK DETAILS, SEE DRAWINGS S12. 4. DISASSEMBLY JOINTS OR FLANGE COUPLING ADAPTORS W T H LIMIT RODS MAY BE ADDED WHERE DESIRED TO 1 1 . COORDINATE PIPE SUPPORT RACK BRACING TO ALLOW ACCESS TO NOZZELS AND FREE MOVEMENT AROUND 2 FACILITATE PIPING ASSEMBLY. GREENSAND VESSELS BY OPERATIONS STAFF. 5. CONTRACTOR SHALL PROVIDE ANY AND ALL VALVED VENTS AT HIGH POINTS AND OTHER LOCATIONS AND ANY AND ALL VALVED DRAINS AT LOW POINTS AND OTHER LOCATIONS IN THE PIPING SYSTEMS THAT ARE NECESSARY TO SUCCESSFULLY HYDROSTATICALLY TEST THE PIPES AND LINES. 2 RECORD DRAWINGS 1 CHANGE PER ADDENDA 1 ISSUED FOR CONSTRUCTION NO. REVISION A B SURVEYED: — DESIGNED: AF DRAWN: RB CHECKED: GP RB 1 /06 GP APPROVED: — RB 10/03 AF RB 0 0 AF BY DATE APPR C D SCALE: 3/8"=1 '-0' VERTICAL: NAVD 1988 ONE INCH HORIZONTAL: NAD 1983/1991 Kennedy/Jenks AT FULL SCALE Consultants 32001 32nd Ave. S., Suite 100 IF NOT ONE INCH DATUM Federal Way, Washington 98001 SCALE ACCORDINGLY E F G H ECONOMIC AND ENGINEERING SERVICES, INC. 10900 NE 4TH STREET, SUITE 1110 BELLEVUE, WASHINGTON 98004 POR LLAND, OR BELLEVUE, WA KENNEWICK, WA OLYMPIA, WA -I J PS- 4"—A`. FOR AIR GAP #1 DETAIL SEE DWG. C22 8"—OF j (Z OF PI i OVERFLOW/AIR GAP STRUCTURE "—BWD ---8"—BWS 8"—BWD 1 2"—SA (#8) 0 (GAC TREATED WATER AFTER I�POCHLORITE ADDITION) 1/2"—SA 9 A -(BACKWASH RECYCLE) F-L F� `— 3„—BWR SEE DETAIL 7 �\) A M31 CHEMICAL DIFFUSER AND SAMPLE SUPPLY 0 V-3" 0 2' 4' TRUE NORTH KEY PLAN NORTH A F M12 M10 NEW TREATMENT BUILDING KEY PLAN CONSTRUCTION RECORD DRAWING NOTICE 0 E Sj G Cf0 lo rn 00 1 o � 5 0 13 These record drawings have been prepared based upon 2 information contained in addenda, change orders, or other available construction information, and information provided by the Contractor, and by others. HDR has not verified the accuracy or completeness of the information provided to it and does not warrant the accuracy or completeness of these record drawings. Users of this information shall be solely responsible to verify any and all information represented herein prior to any such use of the information. CITY OF RENTON DATE: OCTOBER, 2003 � "u Planning/Building/Public Works Dept. PROJECT No. 3-01-358 MAPLEWOOD WATER TREATMENT AND GOLF COURSE IMPROVEMENTS REVISION NO. 2 PARTIAL PLAN @ sHT No. GREENSAND FILTRATION DWO No. M3 � M N W=2953 5