Loading...
HomeMy WebLinkAboutWTR2702953.85A I= G H I K M N 0 p B C D � I - NOTES: co 18 15 16 1 REPAIR EXISTING DAMAGED CONCRETE AND COATING SYSTEM IN HYPOCHLORITE STORAGE TANK ANK VAULTS 11 0) M20 PER SPECIFICATIONS SECTION 06610. CV 10 2 PROVIDE ALL PIPING, VALVES AND ACCESSORIES AS SHOWN ON SHEETS 18 & 19 CV e 3 INSTALL NEW HYPOCHLORITE STORAGE TANKS AND LATERAL SUPPORTS ON EXISTING CONCRETE TANK 4))_VC 12 r TANKS, THE CONTRACTOR SHALL REMOVE 1 PADS. PRIOR TO INSTALLATION O F THE STORAGE TA K , , - HYPOCHLORITE HYPOCHI�ORIT� �-Er GRIND OR GROUT ALL IMPERr t_CTIONS IN THE TOP SURFACE OF THE EXISTING HOUSEKEEPING PAD STORAGE TANK STORAGE TANK 15 SCE AS TO PROVIDE A SMOOTH FLAT SURFACE TO PLACE THE TANKS. uAU LT 1 EAU LT 2 _ _ � 6 2 —OF 2 OF 4 uC 12 4 EXTEND 8—INCH SPILL CONTAINMENT DISCHARGE PIPE TO WITHIN 6 INCHES OF FLOOR. � 3 3 18 (ROUTt PIPE HORIZONTALLY TO CLEAR NaOCI PIPING AND T HEN TO NEAR FLOOR. 9 4 9 0 0 LT� 3(UNLOADINGLT� DOCK ABODE _ � 5 8_ INCH SCHEDULE 80 PVC SWILL CONTAINMENT DISCHARGE PIP` (SEE CIVIL DRAWINGS). 6 PIPE PENETRATION) TYPE X1. SEE SHEET M30. 7 SEE CIVIL DRAWINGS FOR SPILL CONTAINMENT CATCH BASIN AND PIPING. �4"MANWA*-A 2ACCESS HATCH OPENING ABOVE 4 MANWA CD 8 — � 17 (ALTERNATE LOCATION). 8 INCH SCH 80 PVC CHEMICAL PIPING CONTAINMENT CONDUIT.. NaOCL NaOCL z \ STORAGE TANK STORAGE TANKg gPROTECT EXISTING TANK FILL ENCLOSURE, QUICK DISCONNECTS, CUP SINK AND SPILL COLLECTION 8 � 1 "-NaOCL TRANSFER. 1 —NaOCL .TRANSFER —702TK-701JTKPIPING. NOCL NaOCL a TRANSFER PUMP TRANSFER PUMP @CONNECT NEW TANK FILL PIPING TO TANK FILL ENCLOSURE PIPING, TYPICAL. P-701 P-702 (OPIPE SUPPORT, TYPE- PS8,- STAINLESS STEEL PIPE STRAP EVERY 6 FEET OF EXPOSED VC PIPE. RFI 101 FOR PUMP R FI 101 FOR PUMP @INSTALLT N TO BUILDING — _ _. _ NEW TANK. VENT PIPING SS, SCHED 40, EPDXY LINED AS SHOWN. EX E D�>MOUNTING DETAILS MOUNTING DETAILS �� 4 ROOF AND INSTALL CHEMICAL VENT CAP. FLASH IN ACCORDANCE WITH ARCHITECTURAL DWGS. Z 2),—NaOCL SUPPLY EXISTING CONCRETE 7 7 O TANK PAD (TYP.) 13 HYPOCHLORITE STORAGE TANK VAULT #1 PREVIOUSLY CONTAINED LIQUID CAUSTIC SODA STORAGE oo ___q� ---icy---�---4 �- � TANKS. SMALL RESIDUES OF CAUSTIC SODA MAY REMAIN. CONTRACTOR IS CAUTIONED TO USE P Q-+ � P APPROPRIATE MEASURES WHILE WORKING IN VAULT. M20 l MZo i 1 \-2"—NaOCL 14 HYPOCHLORITE STORAGE TANK VAULT 2 PREVIOUSLY CONTAINED CONCENTRATED SULFURIC ACID 10 z w 6 w zPPLYQ 2 2 SUPPLY STORAGE TANKS. SMALL RESIDUES OF SULFURIC ACID AND ACID DAMAGE MAY REMAIN. CONTRACTOR IS O MZo o 9 CAUTIONED TO USE APPROPRIATE MEASURES WHILE WORKING IN VAULT. U 2"-NaOCL FILL � I I c..� o 0 6 PIPE PENETRATION )) )) 6 � � I 15 4 VENT PIPES AS SHOWN — 4 PVC, SC80, TRANSITION COUPLING (SC 80 PVC x SS.) 0 ( _ TYPE X 1, SHT. M30 L� n r — . , 8 i i 2PLCS.: AT- A LOCATION NEAR VERTICAL PENETRATIONPROVIDE QTY (2), VERTICAL PEN�.TRATIONS8 SCHED.80 PVCLLJ..._ W 482) SWEEP LINK SEAL BACKER RGP AND SELF LEVELING COMPOUND. SUPPORT VERTICAL SS (QTY 2) FROM Z 5 , EXTERIOR WALL. L I I� 2 -NaOCL OVERFLOW - _ I CORE DRILL EXISTING CONCRETE AVOID EXISTING FLOOR DRAIN TO HYPOCHLORITE 16 UI 7 I — STORAGE TANKS I 17 ALTERNATE LOCATION Q f PLUS SPARE 5 11- 18 COORDINATE LOCATION W/ ROOF PENETRATION AS REQ D. 5 I 1"-NaOCL SPILL_ CONTAINMENT TRANSFER LINE I • PLUS SPARE CATCH BASIN GENERAL NOTES: -I r 1. CONTRACTOR SHALL CONFORM TO PIPE ROUTING & ARRANGEMENT AS CLOSELY AS POSSIBLE. NOT ALL PIPING VALVES FITTINGS AND ACCESSORIES ARE SHOWN. PROVIDE ALL -PIPE VALVES AND 4 ACCESSORIES AS SHOWN ON INSTRUMENTATION DRAWINGS EVEN THOUGH NOT SHOWN ON THIS DRAWING. _I 2. NOT USED. 3. NOT USED. 4. DISASSEMBLY JOINTS OR FLANGE COUPLING ADAPTORS WITH. LIMIT RODS MAY BE ADDED WHERE DESIRED TO FACILITATE PIPING ASSEMBLY. 3 , 3 5. CONTRACTOR SHALL PROVIDE ANY AND A VALVED VENTS AT HIGH POINTS AND OTH ER LOCATIONS ALL E -NA21iVALVED DRAINS AT LOW POINTS AND OTHER LOCATIONS IN THE PIPING SYSTEMS AND ANY AND ALL THAT ARE NECESSARY TO SUCCESSFULLY HYDROSTATICALLY TEST THE PIPES AND LINES. SECTIONAL PLAT _BELOW � SCALE: 1/ 2 , CONSTRUCTION CTIO RECORD DRAWING NOTICE �-- / /, X 00 These record drawings have been prepared basedupon information contained in addenda, chap e orders, or �_ e 9 I, other available construction information, and information 0 10 2 17.M1 W2953F6 rovided b the Contractor, and by others. HDR has not Q P Y �, verified the accuracy or completeness of the information o — — Y P s 1 /2 —1 0 u provided to it and does not warrant she accuracy or - P y s. Users of this completeness of these record drawings. N P 9 K EY PLAN information be responsible to verify any and 3 on se solely res P Y o P all information represented herein P y prior to an such use o - 0 of the information. c. w / sr s s l= SURVEYED. — SCALE. 1 2 =1 — 0 rn �� -CITY OF DATE... 3 _ _ OCTOBER, 2003 t DESIGNED. AF VERTICAL. NAVD 1988 �. Planning/Building/Public Works De t. t- ECONOMIC AND ENGI NEERING p ONt INCH DRAWN. RB HORIZONTAL. NAD 1983/1991Kennedy/JenksPROJECT NO. 01 -1 - 8 SERVICE INC. 3 05 o , f CHECKED: GPConsultantsMAPLEWOOD AT FULL SCALE T 10900 NE `4 T H STREET SUITE 1110 REVISION No. M APPROVED: - WATER TREATMENT AND GOLF COURSE IMPROVEMENTS 1 05 DA�uM 32001 32nd ` Ave. S. Suite 100 BELLEVUE WASHINGTON 98004 RECORD DRAWINGS RB 2 GP o IF NOT ONE INCH Federal Wo Washington 98001 SHT No. Y! 9 P RT AND OR BELLEVUE A KENNEWICK WA OLYMPIA WA PARTIAL PLAN CONSTRUCTION RB 10 03 AF o L ) / / / ) w `1 ISSUED FOR C0 / SCALE ACCORDINGLY HYP H RITE STORAGE TANK VAULTS DWG No. .Z OC O S M1 9 w R VI I N BY DATE APP REVISION N E J 0 L� - M N K L A B -2953A