HomeMy WebLinkAboutWTR2702958.100
N
ri
a �
w
wz
N
x
� o
0
1
w CW7
O
H
wa
F
w
O
Uz
6
U
N
0
m
m
6
z
m
0
w
n.
N
d'
W
IL
a
L
w
w
X
o
O
N
`-
o
Q
9 w
9
;
Wv
N
44
w
z
`+v
n
Q
r
V)
O 0
of
�w
W
a_ n
►�-�
\c
On
o
c
v E
D
m
I
\ E
mN
c
Aq �I
o �
V)
z
W
V)
v)
o
=
U
=
�
c
w
z
Z``
o
Y
a
V)
r
n
Q
r
N
O
O
W
r2
r7
♦—
N
Q
�
o
m
m
V
Zg
z
z
LJ
o�
U
(n
Q
z
O
U
U
V)
ofLd
W
w
0'
0
0
W
0
LLJ
�
z
SEC. 9, TWP. 23 N., RGE. 5 E°, W.M.
TEMP. BLOCKING STA. 3-xi-3,+- c, AF
rs.6 '_ i
10'
10" VERTICAL CROSS 1 8" 45' BEND (MJ)
CONC. BLOCK/NG
•I E TOF RPE: �9U.3
lF�o'7. �7
2+63.8, 7.3 'L.T STA. ,,498, ;zaT
STA. 216� �i4F 1-8" 45' BEND (M✓)
1pB X6 " TEE (MJxfZ) 1_8'.r6" TEE (M✓xfZ)
I 1-6" GATE VALVE (M✓xfL) 1-6" GATE VALVE (FLxMJ)
2+73,7.4 � 7LF 6' D.l. 1N8" D.L SPOOL
STA. z'4 -OFF 1�5 1/4" MK7 F.H. ASS'Y &F 6" D.I.
\-2" TEMP. BLOW -OFF 1-8" 45' BEND (M✓) NG �5 1 4" F ASS?
CONC. BL CONC. BLOCK/ 1 / MVO .H.
01'43' W 330.64 Tug F IPE 390.8 _ CONCBLOCKING
BEFORE
µ - # Tt7P PIPE 39x..
— _ 1+52.6,10.0 LT — — — --- -
..: - TEE. TOP PIPE 394.7
� t
I .I 16 >5 — — — Nei • ;'. 21 79 17
STA. 0f80, 4RT
_ —
�C
31 ................
ST.. 8+ 58.3,3.8' RT'
sm+
ELF 100/. 6�LF 100/. p • 4�f �.% „ i ; 0 1-10'x6° TEE (MJxFL)TOP PIPE 398.6
•
1-6' GA /F VAL VE (fZxMJ).................
10 R77CAL CROSS
WITH TEMP. BLOCKING
AND HEMP. 2 " BLOW
10" SLEEb
STA. Ot 43 4RT
1-10" 7EE (M✓XFL)
1-10" GATE VAL VE (fZxMJ)
1--12 "r10" TAPPING TEE
10" GA TE VAL VE (MJxFL)
MAIr R/ nrJelNr
BEFORE
AFTER
CONNECTION DETAIL
NEW 10" STUB ACCROSS
UNION A VE
N07F• CONTRACTOR SHALL POTHOLE AND FIELD VERIFY
VER77CAL AND HORIZONTAL LOCH 77ONS AND
ELEVA 77ONS OF ALL EXISTING U77LI77ES IN UNION
A lE NE PRIOR TO INSTALLA 77ON OF NEW WA TER
MAIN CROSSING. CONTRACTOR SHALL CONTACT
77-IE ENGINEER IF VERTICAL BENDS ARE REQUIRED
FOR CROSSING, OR IF NEW 10" WA7ER LINE WILL
HA VE LESS THAN 77-IE REQUIRED MINIMUM OF 3
FOOT OF COVER. - ENGINEER SHALL SUBMIT
AL TERNA 7E DESIGN TO CITY FOR REVIEW &
APPROVAL.
i
I
11
NEW 12"x10"
WE TAP
SCALE: 1" = 40'
0 20 40 80
BENCHMARK
TOP OF MONUMENT FOUND A T
THE SOUTHEAST CORNER OF
SEC 9-23-5, CITY OF RENTON
CONTROL POINT 1503.
ELEV. = 401.02
CHECKED FOR COMPLIANCE
TO CITY STANDARDS
s� Date
Date
. Date
a
1
to"
-,.--'DESIGN
ASBUILT
H F
-o•, ,Q 33251 � ,- �
FGis1ER�
FS8/0NAL
Dii 12-04-02
01 23 02
4205 748th Ave. N.E. Suite 200
Bellevue, Washington 98007
425.885.7877 Fax 425.885.7963
ENGINEERING
PLANNING
SURVEYING
IN I I I I , I wr* - j7-owe
scarvNE® SEP 13 2002
00053C601