HomeMy WebLinkAboutWTR2703012.21
N
a
a
1
x�
w
f°'
wz
°oa
wz
a
0
0
cu
z
0
EL
w
z
U
Q
w
NE 15-23-5
(CEDAR
7 I
=v I DIRT
DEW
o
-- — — EX 6 AC --
N.E
. 2ND ST. (S.E. 132ND ST.)
o- - --- --- — - --
2"G-- -I-- ----— -
-- - -- _ _ --- ----
--- - - - - -----------
� a
o
wZ
00
0E
�Z
Q
c) -
�w
� w
1--1
tl
c
�E
mE
E
�N
CD
0
�
0
0
Q
0
w
Q
Q
F-
C)
C)
U)
w
E.i
w
a
o
0
W
w
Z
Y
w
O
�
a
tin
�
O
V
G
Q
LLJ
Q
0
m
z
O_
w
tY
O
z
1 -4" BO ASSY.
6"C
6"DECID
14" C
•
8"C
TR. D
OPEN
SPA CF
- I _ t_ -- ---- - —
��G GRAVEL
DEW I
— I • 8„ H •� o� co o
—• F ❑ I W 76
_ _ _ _ .8"H 8"A II I U)
+J T 6"A III I I W
j I 10' UTILIY EASEMENT TYP. • ICI I
1 8"H II°O I
1 8"H M I I I 0000
12 • 132"C IIII I
1 08"A III I
i
2 3 III I I W
1 8"A I, Z
i.,
PRIVATE ACCESS II ( I o W
UTILIY EASEMENT-' H I I I
• 12"H III
w Q
12"H
1-51/4" MVO STD. j I l i l
FH ASSY. ( I w J
15-23- 5 >I I I Iw Z
1-8"45' BEND / ` CKI I I I�
(MJxMJ) \ 9 1 IC"
13' PERM. ALL ONSTE 12"H wl i IW I 1-12"x8" TAPPING TEE
ESMT. _ w I 1-8" GV (FLxMJ)
-� - - TYP. 13' PERM. ESMT. I l I I 2-8" D.I. SLEEVE W/
12"H I I 1 I GLAND/GASKESTS &
- III BOLT KIT
188'-8 D.I. I I I II
—----
-- — —— 12'SD -- ----- I (� � SAN.SWR. --- --- — — — - - - -
� III I
Y� 5'TYP. -� L -WTYP. � I I I I 1.5'-8"D.I.
�— ----L �--------- I III I I
_-- _-- , 98'-8"D.I. N.E. 1ST CIRCLE 35-8"D.1.
— — — — — — — — — — —
7
1 STORY
WOOD
FRAME
HOUSE
CONC
CONC
- - --34'-8"D.I:
6.5'
5' 10' PERM. 11.5' PERM. ESMT.
1 ESMT. 1-8"45' BEND (MJxMJ)-� \
FRUIT I RIT FRUIT UIT
38 F •I • U• FRUIT •
• I RUI X
I I
I (NO WATER SERVICE)
I
TRA CT 999 X
• 32"C I STORM DRAINAGE
• �
- I
I
I
I
I
---------------------- ---__--
II \
,
+ X -- X X
I
----------
M
X
X
X—j
ril
5
0062 1 2 A I
•
✓M 12"A
_ 12"A
12"A (NO WATER SERVICE)
• 12"A TRA C T 998 36"C
WETLAND/BUFFER
WETLAND
00
16"COT o P _
8"COT \ /_
• 12"COT
18"COT • 24"COT
•
WETLAND
1 30'
III I 79
III �
l 0 II ( o
11c I N Q
I•� III I X
w
6 I l
llnn
1 I III I
IIII I I �
III I
I i III I I O
ill i O
II I 8o
I I I
C�i CI s
cn Q
III i
I
III I �
I ill I �
III I I
I i i l l l i I 81
I
I I I-i I
I � ilco
l i I
• 24"H 1
ICI I �
I I III I
8"AT • IIII i
• 8„C 82
4
1 �„A I • III
9 A• (� I w I
SCALE: 1 " = 20'
0 10 20 40
BE CH4 ARK
PER Cl TY OF RENTON SURVEY ON NA VD 1988 DA TUM
NO 1852 - 3" FLAT BRASS SURFACE DISC AT THE
CONSTRUCTED INTERSECTION OF N.E. 4TH ST. (S.E. 128THST.)
AND 148TH AV[-. S. E.
EL. 454.77 (I38.614 METERS
NO. 2103 - BROKEN BRASS SURFACE DISC /N THE INTERSECTION
OF S.E. 128TH ST. AND 156TH AVE S.E.
EL. 547.94 (167.01.3 METERS)
WAnR D1S'MC r NO. 90
APPROVED
CONSTRUCTION,/
DRAWINGS: I , i_ r DATE 3..�. .
S.B. FZ�
of wAsI Jw
26456 Aw'
�EGIST0
��sIONAi
EXPIRES o"�oo?( CONSTRUCTION RECORD
INFORMATION ONLY
REVISED TO INDICATE
CONSTRUCTION RECORDS
(ROTH HILL ENGINEERING PARTNERS, LLC.)
FIELD REP: PHILLIP VAN EARWAGE
REVISED BY: BACH NGUYEN
DATE: FEBRUARY 6, 2003
CONTRACTOR: SUMMIT CONSTRUCTION
8"D.I. PIPE: 353 L.F. CL52/ U.S. PIPE
F.HYDRANT: MUELLER
GATE VALVES: KENNEDY
FITTINGS: TYLER
CORE DESIGN ORIGINAL DRAWINGS:
SHEET C6.31 & C6.32
NOT A PART OF CRD SET.
w'w"Q6&3
DESIGN ONLY
ER I C C,q
o� 33 3
- SS/ONAL
2
ExPiRES 6 12—OJ
4205 148th Ave. N.E. Suite 200
Bellevue, Washington 98007
425.885.7877 Fax 425.885.7963
ENGINEERING
DESIGN PLANNING
SURVEYING
BASE MAP: E-2
DRAWING N0. E2.014
1
s..r►���v�U MAR 2 8 �—' W -,,'e 1 " Q3