Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WTR2703142.9
CONCRETE BLOCK SEE SHEET 10 OF 13 MATCHLINE STA. 41 + 0 0 �'3142Q9 .................................... ........... ................. ........ ...... ............ ...... ........... ................. ...... HORIZ. = 1:20 VERT. = 1:5 ........40+00. .............. ....... I ....... 41+00... .... ...... ......... ...... ...... ............................... ....... ...... MAINTAIN MIN. 9" VERT. SEPARATION ...... .... ... ......... STA. 40+08, RT. 37 .... ....... ...... ............. 36+25- .37+00 ...... .38+00 ....... ..39+00..-., .......... POWER POLE :GRADE @ :GRA STA. .36+25,- LT. 12 BEGIN VERT. 'DEFLECTION .... :�90 ....... I .............. ........ ............ ...... .............. �8-5.... .8"6SD...... ........ GRADE @ C.L. 298 LF 8„. DIP 5 9�( F-y �nl 'yI �Al 11 A �1_— �—_ CL .., 52.. (PO�YWRAPPED)... 8-0 ...... ......... ............................... ... STA. 36+38, LT. 16 0 POWER- POLE SEE UTILITY CROSSING 8 SID ...... ..................... ...... DETAI E ......... .............. wrO.- j7 -*?iVa N THM STA... .39 + I 8,.L— T5'.,__'90. DEPTH '-UNK-NOWN'* .............. EX. 6 WATER (MAINTAIN MIN., 6 3 FT. *MIN. COVER STA. 39+25- LT. VERT. SEPARATION) 5 (TYPICAL) 0* BEND . .... ............ .1.......... ............ .............. ... _— 1 — Ill ...... ... ... ....... ...... ... �85 - 12 �,SD u soup ........ ............... ........ 8 ............ �80 ...... --- .177 LF 8" DIP,: CIL 52: STA. 38+85' LT. 15 STA.39+25 LT. 5 FH TEE 8 90* BEND AS —BUILT INFORMATION PROVIDED SUMAM BRH BY FIELD NOTES MEASUREMENTS RLM o RLM clumm AG NO. REVISION BY DATE APPR M LH 1 sp=200 aw em a ML nu r mw am em mu Acmmmw ww�m- me "If—. Wo IlEv"m DATU M CITY OF RENTON Planning/Building/Public Works Dept. WATER MAIN REPLACEMENT TALBOT HILL PHASE 1 (AS -BUILT) 1/15/04 mm avow m W-3142 Wom. ap 9 14 F CD c:> > > > SCANNED OCT 0 8 � , i &/ - ? / � So 9 .?_ dc* mom, NEED,