Loading...
HomeMy WebLinkAboutWTR2703214.30SELECT CLASS B GRAVEL BACKFILL IN CONFORMANCE WITH WSDOT 9-03.12(1)B, COMPACTED TO 95% OF MAXIMUM DRY DENSITY PER ASTM D1557 (STANDARD PROCTOR), PROCEDURE B OR C. WIDTH AND FINISH GRADE PER SITE PLAN 6" CLEAR ROADWAY OF TREES AND BRUSH, STRIP TOPSOIL TO A MINIMUM DEPTH OF 12". j REMOVE SOIL CONTAINING MORE THAN 5% ORGANICS. COMPLETELY REMOVE LARGE ROOTS OR STUMPS IN THE PROPOSED AREA. / UNDISTURBED NATIVE MATERIAL, PROOF ROLLED TO A FIRM AND UNYIELDING CONDITION WITH A 10-TON VIBRATORY ROLLER OR OTHER METHOD APPROVED BY THE ENGINEER. AREAS THAT ARE SOFT, LOOSE, OR YIELDING SHALL BE COMPACTED TO MEET THESE SPECIFICATIONS OR REMOVED AND REPLACED. IF BACKFILL IS REQUIRED IT SHALL BE SELECT CLASS B GRAVEL BACKFILL IN CONFORMANCE WITH WSDOT 9-03.12(1)B, COMPACTED TO 95% OF MAXIMUM DRY DENSITY PER ASTM D1557 (STANDARD PROCTOR), PROCEDURE B OR C. MAXIMUM LIFT THICKNESS 8". PROOF ROLLING SHALL THEN BE PERFORMED TO VERIFY COMPACTION AND STABILIZATION A G E GRAVELED AREAS DETAIL NOT TO 2" TO 4" QUARRY SPALLS 1 Q 1 A L B L= DISTANCE SUCH THAT ELEVATIONS A & B ARE EQUAL A 2 -B /-k 12 1 4" TO 6" MIN CONTRACTOR TO PROVIDE TEMPORARY BRACING AS NECESSARY TO RESIST 400 LB BUOYANT FORCE ON THE TEE OUTLET STRUCTURE, REMOVE BRACING AFTER BOTTOM ORIFICE IS UNPLUGGED. POND RETAINING WALL 449.5' FICE *. 448.5' 12" OUTLE METAL OUTLET PIPE, SEE NOTES 3 & 4 WALL LEVELING PAD FILL GAP BETWEEN MANHOLE / AND WALL WITH GRAVEL J BACKFILL FOR DRAINS RESTRICTOR PLATE WITH 0.7" ORIFICE PLUG BOTTOM ORIFICE DURING CONSTRUCTION TO CREATE A SEDIMENT POND. UNPLUG ORIFICE FOLLOWING STABILIZATION OF DISTURBED SITE AREAS. r ALIGN CHANNEL WITH CONTOURS AS SHOWN ON PLANS CRUSHED SURFACING (11/4" MINUS) IN CONFORMANCE WITH WSDOT 9-03.9(3), COMPACTED TO o 95% OF MAXIMUM DRY DENSITY PER ASTM D1557 (STANDARD PROCTOR), PROCEDURE B OR C. LIJ 0 pill..I 4' MIN Y Z � Z Q m ' Q m 0 —� 8' MIN o PER PLAN mo 4 2' MIN -- 7.5" MIN --- F ROCK CHECK DAMS CO3 CLEANOUT SHEAR GATES 8" DIA. MIN. CV z_ 54" MIN. DIA A -A SECTION VIEW POND RETAINING WALL PROVIDE RIP -RAP CONFORMING TO APWA/WSDOT SECTION 9-13.2 PROVIDE DITCH LINING GEOTEXTILE FABRIC BETWEEN RIP -RAP AND SOIL B F D B POND CONTROL STRUCTURE C1 C07 C05 CO3 _ . NOT TO SCALE VARIES 6" MIN 12" MIN --' FRONT VIEW Y z zc 0 0 w 0 REMOVABLE WATERTIGHT COUPLING PLATE WITH 141 ORIFICE AS SPECIFIED ELBOW DETAIL NOTES: 1. USE A MINIMUM OF A 54" DIAMETER TYPE 2 CATCH BASIN. 2. OUTLET CAPACITY: 100-YEAR DEVELOPED PEAK FLOW. 3. METAL PARTS: CORROSION RESISTANT. NON -GALVANIZED PARTS PREFERRED. GALVANIZED PIPE PARTS TO HAVE ASPHALT TREATMENT 1. 4, IF METAL OUTLET PIPE CONNECTS TO CEMENT CONCRETE PIPE: OUTLET PIPE TO HAVE SMOOTH O.D. EQUAL TO CONCRETE PIPE I.D. LESS 1/4". 5. PROVIDE AT LEAST ONE 3" X .090 GAGE SUPPORT BRACKET ANCHOR TO POND RETAINING WALL. (MAXIMUM 3'-0" VERTICAL SPACING) 6. LOCATE ELBOW RESTRICTOR AS NECESSARY TO PROVIDE MINIMUM CLEARANCE AS SHOWN. 7. LOCATE ADDITIONAL LADDER RUNGS IN STRUCTURES USED AS ACCESS TO TANKS OR VAULTS TO ALLOW ACCESS WHEN CATCH BASIN IS FILLED WITH WATER. PROVIDE 1' THICK OF QUARRY SPALLS PER WSDOT 9-13.6 FILTER FABRIC LINER UNDER SPALLS Y z Q m 0 44 LLJ o SECTION A -A A B H POND OUTFALL PAD DETAIL C06 CO5 CO3 NOT TO SCALE --- 453.00' _ AX WS ELEV PROVIDE 1-MAN ROCK 12" TO 18" DEEP, SLOPE PER PLAN, SET RIP -RAP PAD SO THAT TOP MATCHES SPILLWAY BLOCK ELEVATION. FILL GAPS IN 1-MAN ROCKS WITH QUARRY SPALLS SO SURFACE VARIES BY NO MORE THAN 4" OVER DITCH LINING WOVEN 1' MIN C F - = PER WSDOT 9-33. FREEBOARD 3 �-- 10 MIN, 453.17' TOP OF WALL AT SPILLWAY PROVIDE DITCH LINING GEOTEXTILE FABRIC _ 18.8' AT RETAINING WALL _ BETWEEN QUARRY 15' AT END OF SPILLWAY SPALLS AND SOIL OVERFLOW SPILLWAY DETAIL NOT TO SCALE PROVIDE ROCK LINED DITCH PROVIDE 1' THICK PER PLANS OF QUARRY SPALLS / PER WSDOT 9-13.6 , 3 t �1 1.25' MIN. �' ` PROVIDE DITCH LINING GEOTEXTILE FABRIC BETWEEl QUARRY SPALLS AND SOIL =A A ROCK LINED DITCH NOT TO SCALE SEE DWG NO. C11 FOR PIPE PENETRATION DETAIL OUTLET PIPE FLOW BEVEL PIPE AND PROVIDE TRASH RACK (NOT SHOWN) 12-INCH ROCK DEPTH, EXCAVATE EXISTING SOIL TO INSTALL SEE DWG NO. C11 FOR PIPE PENETRATION DETAIL POND INLET FROM ACCESS ROAD CATCH BASIN PROPOSED RETAINING WALL PROVIDE RIP -RAP CONFORMING TO % APWA/WSDOT SECTION 9-13.2 2' SEED WITH MIXTURE PER PROVIDE V-DITCH PER PROPOSED TECHNICAL SPECIFICATIONS /� GRADING PLAN, SEE DWG NO. CO3 l 3' MIN. LEVEL BERM 3 MAX �1 /1.5' MIN. IF DITCH IS CONSTRUCTED IN f FILL, THE BERM SHALL BE f COMPACTED TO A MIN OF 90% OF MAXIMUM DENSITY E INTERCEPTOR DITCH DETAIL CO3 NOT TO SCALE 12' 6' 2% 2% MIN. 4 INCHES CRUSHED SURFACING BASE COURSE, IN CONFORMANCE WITH WSDOT 9-03.9(3), COMPACTED TO 95% OF MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D698 (STANDARD PROCTOR) PROOF ROLL IN THE PRESENCE OF THE ENGINEER �- FINISHED GRADE, PER PLAN " EXISTING NATIVE MATERIAL G G POND ACCESS ROAD SECTION__ C1 CO3 NOT TO SCALE OUTFALL PIPE FROM A DECHLORINATION MANHOLE PROPOSED 7.5' RETAINING WALL % OUTLET CHECK VALVE i J / PROVIDE RIP -RAP % CONFORMING TO 12' / APWA/WSDOT SECTION 9-13.2 POND BOTTOM {v.w01 WAS F 16727 / ►,.: IONAL SIGNED. 06 2910 i SIGNED: 06129107 LR PROPOSED of 2"(MIN). PROVIDE SUFFICIENT PROVIDE DITCH LINING RETAINING LL rI A CLEARANCE TO ALLOW GEOTEXTILE FABRIC BETWEEN _ WALL VALVE BILL TO OPEN RIP -RAP AND SOIL WITHOUT INTERFERENCE PLAN SECTION A-A,2 ENGINEERING, IN E C C POND INLET RIP - RAP PAD httP:%www.rh2.com moilbox@rh2.com 1.800.720.8052 POND BOTTOM D p 2' PROPOSED f o ' PROVIDE DITCH LINING RETAINING J �� A GEOTEXTILE FABRIC BETWEEN WALL RIP -RAP AND SOIL PLAN SECTION A -A rD"�V D POND CATCH BASIN INLET RIP -RAP PAD NOT TO SCALE BELLINGHAM OFFICE 360.676.0836 454 West Horton Rood t BOTHELL OFFIC' 425.951.5400 12100 NE 195th Street, Juiie 11, EAST WENATCF-IEE OFFIC 509.886.2900 300 Simon Street, Suite 5 PORT ORCHARD OFFICE 360.876.7960 inn l+gnr C+ppp± C; ;+p 101 W 3 21418 i r. nLC 3r 0 1" 2„ DRAWING IS NOT TO SCALE REVISED TO CONFORM IF BAR IS NOT 2" LONG 7STR7TIO ECORD$ PLOT: 1 DWG NO. 11 06/08/09 C04 ;d7L;41 Re ENGINEERIN6 INC. DATE - - SEP 14 HEFT No REVISED TO C& iPM TO CONSTRUCTION RECORDS DY KJS 06/08/09 CLIENT: REN 12, ADDENDUM / ISSUt- FOR CONSTRUCTION BTE MM 10/09/07 JOB NO.: BY REVIEW DATE FILENAME: HAZEN _