Loading...
HomeMy WebLinkAboutTED4003230.2' N�Eml To � � m z � Li CDCD � m Ld � LIJ a. m'c- — o� 3:v 0)0 � -- .c- E m E E !4014_141� CN '- cn C cn o_ I __j Li Ir El - CD cD QCL Lij cl"4 co 00 Uj CD CD CD CD co CD CD CD 00 CD 00 Cl- 00 00 cD ACTI'VITY OCCURS, A�PR~'�" '|WUST ""`"^ -'--- �' ' FACILITIES SHALLMEETING BE HE TH THE CITY OF HELD HAVE ASPHALT ENT #1 OR BETTER INSIDE \ \ \ \ __� RENTOW DEVELOPMENT SERVICES DIVISION, PLAN AND OUTSIDE. REVIEW PROJECT MANAGER. 11, STRUCTURES SHALL NOT BE PERMITTED \ 2. ALL CONSTRUCTION SHALL BE IN WITHIN 10 FEET OF THE SPRING LINE OF ANY \zRAt^H1k^ SCALE ACCORDANCE WITH THE LATEST EDITION OF THE STORM DRAINAGE P|PE, OR 15 FEET FROM THE "STANDARD SPECIFICATIONS FOR ROAO, BRIDGE TOP OF ANY CHANNEL BANK. AND MUNICIPAL CONSTRUCT|0N^ PREPARED BY VY.S.D.O.T.. AND THE AMER|CAN PUBLIC WORKS 12 ALL CATCH BASIN GRATES SHALL �E ' ^n ASSOCIATION (APVVA). AS AMENDED BY THE CITY DEPRESSED O1O FEET BELOW PAVEMENT LEVEL ' ' OF RENTON ` IN FEET ' 13. OPEN CUT ROAD CROSSINGS THROUGH 1 inch 20 ft. � THE STORM DRAINAGE SYSTEM SHALL �E EXISTING PUBLIC RIGHT—OF—WAY WILL NOT BE / ' CONSTRUCTED ACCORDING TO THE APPROVED ALLOWED UNLESS SPECIFICALLY APPROVED BY W \ PLANS WHICH ARE ON FILE WITH THE CITY OF CITY OF RENTON' / *Ew|um. ANY oEv/A||um FROM THE *����VE� 14' ROCK FOR EROSION PROTECTION OF PLANS WILL REQUIRE WRITTEN APPROVAL FROM DITCHES, WHERE REQUIRED, SHALL BE u uvROADS|DE ' THE CITY OF RENTON DEVELOPMENT SERVICES OF SOUND QUARRY ROCK PLACED TO A DEPTH O|V|S|DN ' OF 1 FOOT AND MUST MEET THE FOLLOWING � \ \ 4. A COPY OF THESE APPROVED PLANS MUST SPECIFICATIONS: 4"-8"/40%-70% PASSING; BE ON THE JOB SITE WHENEVER CONSTRUCTION 2"-4" RDCK/30%-40% PASSING; AND -2" ' IS IN PROGRESS. ROCK/10%-20%PASS|NG. 1. ACTUAL GNMENT OF AT GRADE HDPE PIPE TO BE FIELD ~-DISSIPATER, 'AT PIPE 5. DATUM SHALL BE U.S.G'S. UNLESS OTHERWISE 15. ALL BU|U}|NQ DOWNSPOUTS AND FOOTINGTH APPROVED BY CITY OF RENTON. REFERENCE DRAINS SHALL BE CONNECTED TO THE STORM 2. AT GRADE PIPE MAY BE SUPPORTED/ANCHOREDTREES 17 WITH INUS QUARRY SPALLS BENCHMARK AND ELEVATION ARE NOTED ON THE DRAINAGE SYSTEM, UNLESS APPROVED BY THE AS FEASIBLE AND WITH APPROVAL OF ENGINEER. PIPE "JiLLED, DETAIL, BELOW PLANS. DEVELOPMENT SERVICES DIVISION. AN ANCHORS MAY BE DELETEDF TREES RN E LATERAL ACCURATELY DIMENSIONED CERTIFIED AS -BUILT SUPPORT. 8. ALL SED|MEN TAT|ON/EROS|0N FACILITIES MUST DRAWING OF THIS DRAINAGE SYSTEM SUBMITTED ' PIPE ANCHOR BE IN OPERATION PRIOR TO CLEARING AND TO THE CITY OF RENTON UPON COMPLETION. 3. ALL HDPE PIPE TO BE BOR 26. BUILDING C0N8TRUCT|0N, AND THEY MUST BE ' SATISFACTORILY MAINTAINED UNTIL 16. ISSUANCE OF THE BUILDING OR 4. STRIP DRAINS AND FITTINGS TO BE ACODRAIN III XHD 475 -' CONSTRUCTION IS COMPLETED AND THE CONSTRUCTION PERMIT BYTHE CITY OF RENTON CHANNEL OR APPROVED EQUIVALENT. POTENTIAL FOR ON -SITE EROSION HAS PASSED. DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY 5. SHADING INDICATES SLOPES GREATER THAN DR EQUAL TO -- -- ------- -- -- ������ 7. ALL RETENTION/DETENTION FACILITIES MUST CONNECTED WITH STORM SURFACE WATER 4O� AND WITH GREATER THAN 1�' |N ELEVATION CHANGE. ' BE INSTALLED AND IN OPERATION PRIOR TO OR DISPOSITION. FURTHER` THE CITY OF RENTON IN CONJUNCTION WITH ALL CONSTRUCTION DOES NOT ACCEPT ANY OBLIGATION FOR THE 61 ACTIVITY UNLESS OTHERWISE APPROVED BY THE PROPER FUNCTIONING AND MAINTENANCE OF THE DEVELOPMENT SERVICES O|NS|0N. SYSTEM pR0\4DEO DURING | | CONSTRUCTION.R-GASK 8. GRASS SEED WAY BE APPLIED BY 2 iNo HYDROSEED|NQ. THE GRASS SEED M|X7DRE, 17. THE CONTRACTOR SHALL BE RESPONSIBLE 5 OTHER THAN CITY OF RENTON APPROVED FOR PROVIDING ADEQUATE SAFEGUARO, SAFETY op %_9�~�_____� STANDARD M|XES, SHALL BE SUBMITTED BY A DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS AND . LANDSCAPE ARCHITECT AND APPROVED BY THE ANY OTHER NEEDED ACTIONS TO PROTECT THE DEVELOPMENT SERVICES DIVISION.L|FE. HEALTH AND �AFETY OF THE PUBL|�. AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE Q. ALL PIPE AND APPURTENANCES SHALL BE CONTRACT. ANY WORK WITHIN THE TRAVELED 0- LAID ON A PROPERLY PREPARED FOUNDATION IN RIGHT—OF—WAY THAT WAY INTERRUPT NORMAL ' ACCORDANCE WITH SECTION 7-02.3( ) OF THE S' �| S9 CURRENT STATE OF WASH|N0TON STANDARD TRAFFIC FLOW SHALL REQUIRE AN APPROVED TRAFFIC CONTROL PLAN BY THE --P-1 SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE TRANSPORTATION Q|N�|ON ALL SECTIONS OF ' NECESSARY LEVELING OF THE TRENCH BOTTOM THE VKS'O'O' T STANDARD SPECIFICATIONS�9 THE TOP OF THE FOUNDATION MATERIAL AS 1-O7-23' TRAFFIC CONTROL, SHALL APPLY. JL WELL AS PLACEMENT AND COMPACTION OF BEDDING MATERIAL TO UNIFORM GRADE 18' SPECIAL DRAINAGE MEASURES WILL �EREOU|RED |F THE PROJECT LOCATION |� WITHIN , 1 �O THAT THE ENTIRE LENGTH OF THE p|pE WILLREQU}RE� THE AQUIFER PROTECTION AREA BE SUPPORTED ON A UNIFORMLY DENSE ' UNYIELDING BASE. ALL PIPE BEDDING SHALL BE | � APV&A CLASS ^C^. WITH THE EXCEPTION OF PVC 3'x8'x3' GABDN BASKET (ENERGY DISSIPATER /SpREADER) � FILLED WITH 4" MINUS QUARRY SPALLS REBAR PIPE ANCHORS PROVIDE SUFFICIENT CLEARANCE TO HDPE PIPE TO ALLOW FOR LONGITUDINAL PIPE MOVEMENT DUE TO EXPANSION / CONTRACTION � 8^ HDPE 0UTFALL PIPE D , LAID AT GRADE. _�_ / PIPE,.A���CHBA�B��A�� �_M|RAR140X - COMPACTED TO MINIMUM Q5% FOR PAVEMENT FILTER FABRIC AND STRUCTURAL FILL AND 90% OTHERWISE PER PLAN ASTM D-1557-70. PEA GRAVEL BEDDING SHALL PROFILE BE G INCHES OVER AND UNDER P.V.C. PIPE. ---'-----' PAVEMENT WARPS TO MATCH GARAGE ENTRIES log _j EDGE OF Li ROW 2,0011 2" CLASS B ASPHALT SUBGRADE PREPARED PER SECTION 5.2 OF PROJECT GEOTECHNICAL REPORT (ABERnEEN AVE APTS; TERRA ASSOCIATES, INC; NOV JO; 1909.) 0 VE � �� N����0�0 ��N �� N��COADR..YSTNAN NN�� ��m m m m�� m m� � m m �� 0�� 0 0�0 N � ���0�° �� � N DETAIL ��U��N��N��N�� ���0 N ����N N `��� ���'�=,��" � ��'`*� = � � ="�"�� SCALE 1~=2' Ct_ OF R0VV A = 12,411291 R = 4�O' . 9° LO 14.28 6+00 389*5[3'59'VV 6+33.69 LO 26"45'02° \_ R = 19.00' T = 4.52' L = 8.87' E AR 0 9 V, PrAkel Z I VAI WA R_ wj I & III 2787- V% EXPIRES 01/19/06 CONCEPT ENGINEERING,INC. 455 Rainier Boulevard North Issaquah, Washington 98027 Copyright o 1999 Concept Engineering. Inc. All rights reserved. CITY OF RENTON APPROVAL FOR SITE CONSTRUCTION Date 5-1 S16C- Date Date Date OCT �700~ ��(�/������"�� ��, w w �""J OCT �700~ ��(�/������"�� ��, w w �""J