Loading...
HomeMy WebLinkAboutWWP2703230.2LO 0 N.. 0 U N O z m 0 0 0 a Lal Z J Lt• �I v C L'i CD � d d W � I w C Q W n H � rn W ~ O Q O C N H O N d tl w n N w F_. O z v, cv O m 0 m C 0 0 CV W U Q / 0 d 0 0 U z W Elf _.J Z 00 0 CD CD Q o z I— w d 0 0- 0- z W W 0 C a «> CD 7 w 0 X IU1 0 N 0 1 -a1 U) -Y.- L_ E 0 �-0 Q U . �W :3CL Q_ \ C 0~ 0 — 0 m E \ E �N c C p, C 0 FL D N p z U_ W 0 QQ C o Q = U Q y asa 4 Q 0 � O Ld w W w >>> w w w N M V) U) V) I- r U U U w w w a_ a- D_ o o 0 L V) V) W W W cr_ I a I ry Iemm z O U) W ry 2'— s" LOCKING CLEANOUT COVER OLYMPIC FOUNDRY EXISTING GRADE SQUARE NO. M--1025 MARKED '%EWER - PAVEMENT v+r{ 2` # CU ICR PLUG OR 'CAP AT END ETE APPROVED WATERTIGHT �" PIPE #I 6- PVC - 12" TRACER WIRE FIRK JOINT PACKING (OAKUM) ` COILED INSIDE COVER TRACER WIRE 6" TEE t� 6' 00* SEND PRESSURE : LINE ` CONNECTION 6' PVC SIDE SEWER SEE £DETAIL. THIS SHEET * PVC CONCRETE BLOCK — (SIZE TO T) PRESSURE LINE CONNECTION TO GRAVITY SANITARY SEWER DETAIL PVC SIDE SPSWER FLEXIBLE COUPLING, COMPRESSION COUPLING SCHEDULE 40 PVC 12- MAX. 6" DUCTILE MJ CAP W/2- THREAT; 2- X 1-1/4" BRASS BUSHING, POLYETHYLENEREDUCE TO 1-1/4" PVC SCH 80 NIPPLE SE PRESWJK 6--8" LONG W LINE PRESSURE LINE C NECTION DETAIL glow oil N12 JFT STATION SHALL BE ENVIRONMENT" ONE MODEL 2010 4# x 4# PRESSURE )RRECT EQUIPMENT, INC., 14576 NE 9571I STREET, REDMOND. TREATED POST CT HOWARD TAUS AT (425) 369-1233. E-DIE SUPPLIED (k INCLUDE THE FOLLOWING: BREAKER PANEL F?'4. mp, xmi-PostTIVE DISPLACEMENT'TYPE. (SEE NOTE 5) E PROGRESSING ;CAVITY WITH A 1 HP, 1800 RPM r • a • ! l� a ♦ a • • I wwwwomwom i �I s • •# • at' e' u DETAIL Q Q (�ALARM PC .• • r P � ' t PUSH ... TO RUN J f i+n �►i®� s ti • • - #et s s # wr' R _ ♦ -. R ! # - .�. R rt i # # # # a. # a R � # • # .� .. c GRINDER PUMP NOTES PUMP INSTALLATIONS MUST MEET ALL BUILDING, PLUMBING, AND ELECTRICAL CODES, AND SHALL HAVE THE CITY'S APPROVAL PRIOR TO INSTALLATION. PIPE PRESSURE SIDE SEWER PIPE SHALL BE HIGH -DENSITY POLYETHYLENE PLASTIC PIPE (HDPE SDR 11) AND MEET THE FOLLOWING SPECIFICATIONS. 1) BASE RESIN: CONFORM TO ALL REQUIREMENTS OF ASTM D 48, TYPE III, CLASS C, CATEGORY 5, GRADE P34, WITH A PPI RATING OF PE 3408. 2) MELT INDEX: LESS THAN 0.25 GRAMS/10 MIN. AS DETERMINED BY ASTM D 1238, CONDITION E. 3) ENVIRONMENTAL STRESS CHECK RESISTANCE: NO CRACKS AFTER 192 HOURS AT 100 C AS DETERMINED BY ASTM D 1693, CONDITION C. 4) RATING: LONG-TERM HYDROSTATIC STRENGTH OF 1450 PSI AND HYDROSTATIC DESIGN STRESS OF 730 PSI AS DETERMINED BY ASTM D 2837. 5) WORKING PRESSURE RATING: 145 PSI. 6) LABORATORY TEST REQUIREMENTS: WITHSTAND WITHOUT FAILURE A MINIMUM BURST PRESSURE OF 560 PSI WHEN APPLIED IN 60 TO 70 SECONDS WITH WATER AT 730 F. TEST IN ACCORDANCE WITH ASTM D 1599. TEST ONE PERCENT BUT NOT MORE THAN THREE LENGTHS. FITTINGS AND JOINTS JOINTS SHALL BE FLANGED, OR THERMAL FUSION BUTT -WELDED. JOINTS SHALL BE MADE ONLY AT PUMP BASINS, VALVES, FITTINGS AND CHANGES IN PIPE DIAMETER. ALL FLANGES AND FITTINGS SHALL BE THERMAL FUSION BUTT WELDED TO THE PIPE. INTERNAL BEADS FROM WELDING AT FLANGES AND FITTINGS SHALL BE REMOVED. OPERATORS OF FUSION WELDING EQUIPMENT SHALL BE TRAINED BY THE PIPE MANUFACTURER, WHO SHALL CERTIFY THAT OPERATORS ARE QUALIFIED. ALL FITTINGS WILL BE HDPE SDR 11 OR SCH 80 PVC WHERE NOTED, LAYING OF PIPE BETWEEN GRINDER TANK AND GRAVITY MANHOLE THE PRESSURE SIDE SEWER FROM THE GRINDER VALVE BOX TO THE GRAVITY MANHOLE SHALL HAVE A MINIMUM COVER OF 24-INCHES AND SHALL BE HDPE SDR 11 PIPE AND SHALL BE EQUIPPED WITH TRACER WIRE FOR LOCATING PURPOSES. TRACER WIRE SHALL BE INSULATED 12-GAUGE WIRE (SOLID CORE) WRAPPED AROUND THE PIPE FROM THE GRINDER CLEANOUT TO THE GRAVITY MANHOLE. IT IS UNNECESSARY TO BED THIS SIDE SEWER. GRINDER PUMP INSTALLATION THE GRINDER SEWER PUMP SHALL BE AN ENVIRONMENT ONE MODEL 2010 AS SUPPLIED BY CORRECT EQUIPMENT, INC., 14576 NE 95TH STREET, REDMOND, WA 98052. CONTACT HOWARD TAUB AT (425) 869-1233. CONTACT THE CITY FOR A PRE -CONSTRUCTION MEETING FOR PUMP TANK AND CONTROL PANEL LOCATIONS BEFORE ANY INSTALLATION. CONTRACTOR SHALL DETERMINE THE DEPTH OF THE EXISTING BUILDING SEWER DISCHARGE BEFORE ANY INSTALLATION, TO DETERMINE IF A 58-INCH OR 74-INCH DEEP TANK WILL BE SUITABLE. GRINDER PUMP INSTALLATION (CONT.) THE GRINDER PUMP LIFT STATION PACKAGE SHALL INCLUDE THE FOLLOWING ITEMS: A) SEWAGE GRINDER PUMPS, SEMI -POSITIVE DISPLACEMENT TYPE, EQUAL TO ENVIRONMENT ONE PROGRESSIVE CAVITY WITH A 1 HP, 1800 RPM MOTOR. B) CORRUGATED HDPE TANK WITH SINGLE COMPLETE PUMP UNIT, READY FOR INSTALLATION. THE TANK WILL HAVE A 1-1/4 NPT DISCHARGE CONNECTION AND A 4-INCH INLET GROMMET FOR DWV (DRAIN WASTE AND VENT) PIPE. C) THE TANK SHALL INCLUDE AN INTERNAL CHECK VALVE ASSEMBLY. D) A BREAKER PANEL AS SUPPLIED BY ENVIRONMENT ONE, WITH TWO 15 AMP BREAKERS FOR PUMP OPERATIONS, ONE 15 AMP BREAKER FOR THE ALARM SYSTEM, A PUSH TO RUN BUTTON, AN AUDIBLE ALARM WITH SILENCE BUTTON, AND A RED LIGHT ALARM. ALL WIRES AND CONNECTORS ARE TO BE COLOR CODED AND LABELED FOR EASE OF INSTALLATION. E) A MINIMUM OF 25-FEET OF DIRECT BURY CABLE (SUPPLY CABLE) BETWEEN THE TANK AND BREAKER PANEL. F) THE PUMP SYSTEM OPERATES ON TWO PRESSURE SWITCHES. ONE SWITCH OPERATES THE PUMP ON/OFF AND THE SECOND OPERATES THE ALARM. G) THE PACKAGE SYSTEM SHALL MEET THE REQUIREMENTS OF THE WASHINGTON STATE DEPARTMENT OF LABOR & INDUSTRIES, DIVISION FOR RESIDENTIAL, GRINDER PUMP SYSTEMS. H) THE ELECTRICAL SUPPLY TO THE BREAKER PANEL SHALL BE 240-VOLT SINGLE-PHASE POWER. 1) THE TANK LOCATION SHALL BE ACCESSIBLE FOR MAINTENANCE AND REPAIR. THE TANK COVER SHALL BE APPROXIMATELY 3 INCHES ABOVE FINISHED GRADE. FINISH GRADE SHALL SLOPE AWAY FROM THE STATION AND THE STATION SHALL NOT BE INSTALLED WITHIN A "POT HOLE". NO PLANTS ARE TO BE LOCATED WITHIN 5 FEET OF THE TANK AND THE PROPERTY OWNER SHALL MAINTAIN A 3 FOOT CLEAR ZONE AROUND THE TANK. J) THE LOCATION OF THE BREAKER PANEL SHALL BE: (1) ACCESSIBLE FOR MAINTENANCE AND REPAIR, (2) IN SIGHT OF THE TANK, (3) THE BOTTOM OF THE PANEL MUST BE 5 FEET FROM FINISHED GRADE, AND (4) THE ALARM LIGHT SHALL BE VISIBLE FROM 50 FEET AND MUST BE VISIBLE IN A 180-DEGREE RADIUS. K) THE MAXIMUM DISTANCE BETWEEN THE BREAKER PANEL AND THE GRINDER TANK SHALL BE 25 FEET, AND WITH SIGHT AND EASY ACCESS. L) THE BREAKER PANEL SHALL BE EQUIPPED WITH A KNIFE -TYPE LOCK OUT SWITCH. THE LOCKOUT SWITCH SHALL BE VISIBLE FROM THE TANK, M) FENCES, BUSHES, OR ANY OTHER OBJECT SHALL NOT HIDE THE ALARM LIGHT OR HINDER IN THE MAINTENANCE AND/OR REPAIR OF THE SYSTEM. N) THERE SHALL BE NO ADDITIONAL JUNCTION BOXES OR SPLICES MADE ONCE THE SYSTEM HAS BEEN INSTALLED AND INSPECTED BY CITY PERSONNEL. !TqftqT21T40042 F STEM �� 1. EXPIRES 01 /19/06 CONCEPT ENGINEERING, INC. 455 Rainier Boulevard North Issaquah, Washington 98027 (425) 392-8055 FAX (425) 392-0108 Copyright c 1999 Concept Engineering, Inc. All rights reserved. ALL WORK SHALL COMPLY WITH CITY OF RENTON STANDARD PLANS FOR ROAD, BRIDGE AND MUNICIPAL CITY OF RENTON APPROVAL FOR SITE CONSTRUCTION lty-�&L �/ZAfo Date Comments: ,CANNED OCT 2 8 200' S