Loading...
HomeMy WebLinkAboutTED4003243.3- . � � ^«� � � �� �� m � �� � &� V.) 0 �U _ _ � m � C: c a � � � e � z. � � GO ..—".`" ,`.". )..`u%-./um vn ucvr_Lurmcm/ *�,nw/y A Pt�L- CONSTRUCTlON MEETING MUST BE HELD WITH THE CITY OF RENTON DEVELOPMENT SERVICES 0N3|0N' PLAN REVIEW PROJECT MANAGER. 7.ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. IALL REQUIRED SED|WENTATl(}N/ERU80N FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS Pf\S5EO. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO ERO3|0N/S[D|MENTATlON CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERk4|TTEE. 4.THE EROSION AND SEDIMENTATION CONTROL SYSTEMS ON THIS DRAWING ARE INTENDED TO BE k4|N|KJUkJ REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE P[RM|TTEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, /T SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE P[RM|TTEE TO ADDRESS ANY NEW CONDITIONS THAT WAY BE CREATED BY THIS ACTIVITIES AND TO PROVIDED ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5,APPR0VAL OF THIS PLAN IS FOR EROS|ON/SED/k4ENTAT/ON CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DES|GN, SIZE NOR LOCATION OF PIPES, RESTR|CTORS . CHANNELS. OR RETENTION FACILITIES. S.DUR|NG THE TIME PERIOD OF NOVEWBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE LEFT UNM0RKED FOR MORE THAN TWELVE '12\ HOURS' SHALL BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING. 7.|N ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE FURTHER WORK IS ANDC|PATED FOR PERIOD OF 30 DAYS OR K40RE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR /N QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DUR!NG THE MONTHS OF APR|L THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PR()CEED, HOWEVER. WHENEVER IT IS /N THE INTEREST OF THE PERW|TTEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON' OUTSIDE THE SPECIFIED T!ME PER/OD. }.FOR ALL EROS|(JN/SED/MENTAllON CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS O INCHES, A FENC[, A M|N|KJUW OF 3 FEET HIGH IS REQUIRED WITH 3:1 SLOPES. ).A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 24' x 50' x 8" OF 4- TO O- INCH QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE CONSTRUCTION SITE. t Use 4^ t�� �b cm�� m� for surfacing oy �m� Wvie/�| with 'fines � not acceptable. t� � ou�po e 2. The 100minimum length uhoU he lengthened as necessary to |nevro material is not tracked m<o the public right-or-woy. X|STING GROUND EXISTING GROUND (MAY BE REDUCED TO 50' MIN FOR SITES WITH LESS THAN 1 ACRE OF EXPOSED SOIL.) R=251M|N EXISTING DRIVEWAY -/ RAMP OR SITE ACCESS ROAD � � �5 > T[�K6[)/�[}�[»\/ /�����«�T[)U/�T|/�hJ [�JT[��hJr�[ TEMPORARY ^ `^��/�~�//»����//��/v ENTRANCE Ld cr_ F�[�A|| hJy� ��[]r]� DETAIL /���. ��/�����NOT TO SCALE � � FILTER FABRIC MATERIAL 80^ WIDE ROLLS USE STAPLES OR WIRE R|NGS TO ATTACH FABRIC TO WIRE, FABRIC OR EOUIV N DIL L _S - 1� FOR SHEET RUNOFF OR FOLLOWING DISCHARGE FROM A | SEDIMENT TRAP OR POND. 5-O' | --� ---~-' - -- BURY BOTTOM OF FABRIC 2, MAXIMUM SLOPE STEEPNESS PERPENDICULAR TO FENCE -~--� �ATER|AL /N 8^ BY �2^ TRENCH LINE |� ��� . 6' -VAX J MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO �HE FENCE OF 100 FT. 4. IF 50% OR LESS OF THE SOIL, BY WEIGHT, IS FINE PARTICLES SMALLER THAN THE U.S. STANDARD SIEVE NO. 200. THE EOS SHOULD BE EQUAL TO OR SMALLER THAN THE SIEVE SIZE THAT 85% OF THE SOIL CAN PASS THROUGH. F|LTER F�8R|C MATERIAL .. O 5. THE TRENCH SHALL BE BACKF|LLED WITH 3/4" W|N|WUW , , DIAMETER WASHED GRAVEL. 2BY 14 GA. WIRE �BY *or/� OF Euu/v / 5. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE � SERVED THEIR USEFUL PURPOSE,BUT NOT BEFORE THE | UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. | PROVIDE .- -C~ 5� FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY ' o�^^r/�� ! � AFTER EACH RAINFALL AND AT LEAST DAILY DURING IN TRENCH m /xEm H AND ON Bo/� SIDES ` PROLONGED �A!NFALL ANY REPAIRS SHALL BE MADE ' OF FILTER FENCE F�8R|C ON IMMEDIATELY, THE SURFACE. 2^ BY 4^ N00D POST ALT: STEEL FENCE POSTS. BRUSH BARRIER NZ EXPIRES: 3/1/2Q06 FILTER [�J�����|�� [-���J��[� ��[�����A� . /�_ v �_` � FABRIC �;�� | �_/���DETO , �_ DE-1-AIL �J�� ����'�� ���_ | r�Y�_ }��/- L�. ��� � N[lT To SCALE 2:1 MAX, SLOPE DIKE MATERIAL COMPACTED 2� �!M ' DIKE9O% Nt!0D!FIED PROCTOR DIKE SPACING DEPENDS ON SLOPE GRADIENT |NTFP(`EPTOR DIKE MAINTENANCE STANDARDS 1. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE THIRD OF THE AVAILABLE STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY. 2. REGULAR MAINTENANCE IS CRITICAL FOR CATCH BASIN PROTECTION. UNLIKE MANY FORMS OF PROTECTION THAT FAIL GAROU4LLY' CATCH BASIN PROTECTION WILL FAIL SUDDENLY AND COMPLETELY IF NOT MAINTAINED PROPERLY. NOTE: THIS O[T/uL IS ONLY SCHEMATIC. ANY INSERT IS CATCH BASIN GRATE ALLOWED THAT HAS A MIN. 0.5 C.F. OF STORAGE. THE MEANS TO DEWATER THE STORED � — Z SEDIMENT, AN OVERFLOW. AND UaEanuuala CAN BE EASILY MAINTAINED. SOLID -I I FE OVERFLOW WALLS FILTER MEDIA FOR DIEWATERING P0LYETHYL[NE CAP PROVIDE ADEQUATE STRAPPING -` / r|' 47Rn PERFORATED P0LYETHY DRAINAGE TU8|NC, 8^ C TUBING SHALL COMPLY WITH ABTw F867 AND AASHTO kJ294. KJX|NT�N�N[`� �T�����Fl� .v.r`//"/�-/vr`/�`��- ./`r`/v��r`/`�/./ SWALE SPACING DEPENDS ON SLOPE GRADIENT 1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION INTERCEPTOR SVVA| E ACTIVITY -SHALL BE REPAIRED IMMEDIATELY. 2. IF THE FACILITIES DO NOT REGULARLY RETAIN STORM RUNOFF' THE CAPACITY AND FREQUENCY OF |�T | ^ ���-�- �� | � }�� DIKE" THE D|KES/5WALES SHALL BE INCREASED. / | � � ��o � ���_v / �/< � �� | �� �_~J A �J0 SNJAf [-�� _-----2X RISER D|A, MIN. SEDIMENT k 6 [_K] 7- POND �� �}[-[J||Y|[�|� � [-��|�J�� []|��[-R DETAIL 12" CMP RISER PIPE (PRINCIPAL EULLYVAY\ OPEN AT TOP WITH TRASH RACK DEWATER|NG DENCE � \ (SEE RISER D[TA|L\ ` EL 42O.O | !|| ||| || | [ ~ ||| WIRE -BACKED SILT FENCE. DIEWATERING --I I E STAKED HAYBALES WRAPPED ORIFICE WITH FILTER FABRIC OR EQUIVALENT DIVIDER POROUS BOTTOM CATCH BASIN INSERT -WATERING 1.75^ D|A. ORIFICE, SCHEDULE ) STEEL STUB MIN. -TERNATVEL\, METAL STAKES ID WIRE WAY BE USED TO REV[NT FLOATATION CREST OF EMERGENCY SPILLWAY 5" kJ|N. WIDTH - EL: 428.5 6 MIN. EMBANKMENT COMPACTED 95% �PREMOUS MATERIALS SUCH AS 13RAVEL OR CLEAN SAND SHALL NOT BE USED. | `r/---------����� CONCRETE BASE (SEE RISER DETAIL) ��F-�l(��[_&]l- ����KJ�� SEDIMENT [-L�|^�L� CROSS S[_C7-|OKJ \/|[-W TEMP 12" CPEP PIPE ---/' D|SCHARGE TO DOWNSTREAM ' DRAINAGE CATCH BASIN #2 - ^ DEPARTMENT OF PUBLIC WORKS JAEGER ENGINEERING SUNSFT CREST SHORT PLAT DESIGNED: D ATE: 2/10/05 FILE NAME: BY: r11A TL_.1 Phone No, (253) 850-0934 CHECKED: SCALE: FIELD BOOK: PAGE: NO. REVISION BY APPR, DAIE Fox No. (253) 8,50-0155 APPROVED: SHEET: SCANNED OCT 28 2005 /l �Tl �/l{] APPROVAL RECOMMENDED FOR � /�/ / /��/v/�/- �y| DATE: N� -----'------------------------ �� `�m 2431