Loading...
HomeMy WebLinkAboutWWP2703255.1kn tn pC4.4 1 a a � � o Q � 0 o 0 o w a a d LL_ Ln CO rn U o � Ld a. �. 0 Y p p m Z� t� Z U Q 0 wQ� M d- O Q J JZO d ~ OQZ o 07 Z O C1 W < 0 Q H m H Z (%co Lu 00w 0 (D 0 o� r � 0 P -0 Q 0 �C) = m m E E O-)N C a Q) G-A. -a-"mn 17+84.24 8.23' LT RIM 469.98- 469.80 IE IN 456.99 (N & W) (CORE DRILL) IE OUT 456.09-457.00(S) RECHANNEL MANHOLE 1023059234 1023059372 SSMH 12 16+14.12 6.14' LT RIM 4;?5.15 475.23 IE IN 466.94 456.03 IE OUT '-.—" 455.93 I I 1023059293 { Ln SSMH 11 I) 14+60.75, 5.00' LT { 4 RIM #�6#7.477.03 1 IE IN 470.02 IE OUT 4699i46�.80 4 SSMH 4 13+82.00, 5.00' LT g = U J U U zz U O N W RIM 4916.675 - Z Z O o IM 476.61 o a IERN 464.55 Q IE OUT 464.45 w IE 6" IN 464.62 1023059215 z O u� w m :� sommom 1023059003 1023059405 SSMH 10 1 1_ 12+58.77 5.00' LT. { RIM 475.33 AS) IE IN 465.38 I IE OUT485.20 �465.31B I I' N L I 30' c I GRAPHIC SCALE 20 0 20 40 80 1 INCH = 40 FT. NE 1 /4 SEC. 10 ,TWP. 23 IRGE. 5 ,W.M. RIM 466.81- 465.75 IE IN 458.eO 457.67 IE OUT -f5;?.96 457.57 Jahn o 60+17.78(KIT), 5.00' RT. RIM 455.e9' 452.91 IE IN 44-3.12 443.56 IE OUT 443.92 443.46 PROPOSED 1 20' TEMPORARY CONSTRUCTION SLOPE EASEMENT NOTE TO CONTRACTOR SEWER STUBS MUST EXTEND AT AT LEAST ONE FOOT BEYOND DRY UTILITIES EASEMENT. DRAWN BY: TRN DATE: 8-3-06 AS BUILT DATE: 9-27-06 THESE RECORD DRAWINGS ARE SUBMITTED FOR REVIEW ON A TRUE COPY OF THE COUNTY APPROVED CONSTRUCTION PLANS SIGNED FOR APPROVAL. BY: PROJECT ENGINEER: LUAY JOUDEH DATE: 09-27-06 WE HEREBY DECLARE THAT THE ROAD, STORM DRAINAGE, GRADING AND OTHER IMPROVEMENTS ARE LOCATED__AS,SWtrWN_"'ON THESE RECORD DRAWINGS. BY: PROJECT ENGINEER ---------- DATE: _'p t j . o• r. i RECOMMENDED FOR APPROVAL BY BY BY M:\04\166\plots\2\AS BUILTS\AB-14-3ESS4166.dwg 9/27/2006 2021 'PP [ST I N I1 I NI NI AI A Ai� 4 ; SGANNED OCT 2 7 2006