JOINT UTILITY TRENCH LEGEND
JT
P
T
C
G
X# X#
JOINT UTILITY TRENCH
INSTALL X" DIAMETER
CONDUIT - PSE
POWER
INSTALL X" DIAMETER
CONDUIT -
CENTURYLINK
INSTALL X" DIAMETER
CONDUIT -
COMCAST
INSTALL X" DIAMETER
CONDUIT - PSE
GAS
TRENCH SECTION X#,
SEE SHTS 175-179
®
INSTALL 264 TA VAULT - CENTURYLINK
®
INSTALL PEDESTAL - CENTURYLINK
o
EX. SERVICE WIRE BOX - COMCAST
INSTALL 5106 DEEP VAULT - PSE
®
INSTALL. J-BOX - PSE
•
INSTALL SECONDARY HANDHOLE - PSE
❑�
INSTALL ABOVE GROUND TRANSFORMER -
PSE
•
INSTALL INTERCEPT POINT - PSE
I�
INSTALL TOTAL UNDERGROUND
TRANSFORMER - PSE
rg
INSTALL 2436 VAULT - COMCAST
®
INSTALL 2424 VAULT - COMCAST
INSTALL 17"x3O" VAULT - COMCAST
0
INSTALL ROUND VAULT - COMCAST
W-A
INSTALL 253 TA - COMCAST
- — — — — — — —
— - APPROXIMATE CONSTRUCTION LIMITS
— —
PERMANENT EASEMENT
ROW LINE
- -
PROPERTY LINE
CALL 2 DAYS
BEFORE•
1-800-424-5555
C
CD
C
PLAN
0 5 10 20 40 60
SCALE IN FEET
cw"k
753 9th Avenue N 2502 Jefferson Avenue
Seattle, WA 98109 Tacoma, WA 98402
(206) 286-1640 (253) 627.0720
www,kpg.com
GENERAL JOINT UTILITY TRENCH PLAN NOTES
1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
GAS, COMCAST, AND CENTURYLINK.
2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL.
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
FRANCHISE UTILITIES.
3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
CONVERSION.
4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR.
LO
THE CITY OF RENTON.
cfl
5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
w
FOR THEIR CONVERSION.
w
6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
CD
MADE BY THE FRANCHISE UTILITIES.
N7.
UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
PROPERTY OWNER FROM THE RIGHT—OF—WAY TO EXISTING PRIVATE METERS.
8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND
z
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
_►
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
Q
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192.
9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
STRUCTURES NO LONGER IN USE.
10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
DESIGN.
11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
VAULT SCHEDULE
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT
IN/FROM LEFT
CONDUIT
OUT/TO RIGHT
P1
5106 DEEP VAULT
PV01
PSE
PSE
CONTRACTOR
6-6"
2p,4p
Q1
264 TA
#913
CENTURYLINK
CENTURYLINK
CONTRACTOR
1q
2q,3q
C1
2436 MEDIUM DUTY VAULT
-
COMCAST
COMCAST
CONTRACTOR
1c,2c
3c,4c
P2
THREE PHASE J-BOX
J03
PSE
PSE
CONTRACTOR
4-4"
1p,3p,1-4"
Q2
C2
264 TA
2436 MEDIUM DUTY VAULT
-
-
CENTURYLINK
COMCAST
CENTURYLINK
COMCAST
CONTRACTOR
CONTRACTOR
-
-
1q
1c2c
P27
INTERCEPT POINT
IP01 A
PSE
-
CONTRACTOR
-
2-4"
P28
INTERCEPT POINT
IP01 A
PSE
-
CONTRACTOR
-
2-6"
P29
INTERCEPT POINT
IP01A
PSE
-
CONTRACTOR
-
2-6"
P30
INTERCEPT POINT
IP01 A
PSE
-
CONTRACTOR
-
2-4" 1
P55
REMOVE VAULT
PV01A
PSE
-
CONTRACTOR
-
-
P56
REMOVE VAULT
J04
PSE
-
CONTRACTOR
-
-
P82
SECONDARY HANDHOLE
H1A
PSE
PSE
CONTRACTOR
-
-
P84
INTERCEPT POINT
IP01 A
PSE
-
CONTRACTOR
-
2-6"
j"al- CITY OF RENTON
BID
Public Works Department
DOCUMENTS APPROVED FOR CONSTRUCTION
BY: DATE: ! 44�/
T=3430104
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
7
EXISTING CONDITIONS
55
SITE PREPARATION & TESC PLAN
69
ALIGNMENT PLAN
81
ALIGNMENT PROFILE
_DRAINAGE PLANS
93
104
_ _
DRAINAGE PROFILE
_
114
WATER PLAN
132
If WATER PROFILE
146
JOINT UTILI"f'Y TRENCH P`=_AN�
JOINT UTILITY TRENCH PROFILES
180
PROPERTY RESTORATION PLANS
195
CHANNELIZATION & SIGNING PLAN
217
ILLUMINATION PLANS
228
—
IRRIGATION PLAN
282
LANDSCAPE PLAN !
294