GENERAL JOINT UTILITY TRENCH PLAN NOTES
2 �
EXISTING 1. UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
ALIGNMENT
TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
/® J P41 "`� _ COORDINATION, LAYOUT,
SURVEYI
NG, TRENCHING, EXCAVATION, BEDDING, BACKFILL
8 ® Gp AND RESTORATION FORTHE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
/ 17 // v PLAN THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
/® F _ — _ 19 9-- FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
0 5 10 20 40 60 GAS, COMCAST, AND CENTURYLINK.
3 r 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
/ / f � � SCALE IN FEET
/ J2 / / 3 APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
co CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
I I J TOR SHALI BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
{ /® /� 4 � � � \ � � � � � `� WALGREEN'S CONTRACTOR � � REQUIREMENTS ,
REILLY S 1 / , / FRANCHISE UTILITIES.
3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
J3 f CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
CONVERSION.
4. THE CONTRACTOR CONDUITS M
/ �� , / / ' •' � ... ) / C WILL FURNISH AND INSTALL ALL VAULTS AND „ONDI�ITS FOR
THE CITY OF RENTON.
�'co 5. COMC.AST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
� 1
FOR THEIR CONVERSION.
\1— ® — — — _ _ J 1 - _ v L- G _ G—�� �c�! 1 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
� ✓ MADE
MA�E. BY THE FRANCHISE UTILITIES
- — -- — .
7. UNDERGROUND SERVICE CONNECTI
ONS FOR POWER SHALL BE MADE BY THE
a
„r jT 4 `�. ` ®` PROPERTY OWNER FROM THE RIGHT-OF-WAY TO EXISTING PRIVATE METERS.
8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
C2 AND 7 -
PROFILE SHEETS 1.4 192. ADJUST THE HORIZONTAL ALIGNMENT AND
J 1 Imo- ��,P - u UG VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
G G GP UGP-- —UGP UGP UGP -�� ��� `
w ��p-- u I _ /` \ `� ` PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
w — — — sWG UGP -a �- I — / \ ®a COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
/ UGP U- UGP---}- UhP GP UGP--- U -- Z— / _ \\ �'` UNDERGROUND UTILITIES, T (' T T
GP . UGP UZP Q14 e DERGRO_ ND HE CONTRACTOR RACTQR SHALL VERTICALLY ICALLY TRANSITION THE
e
® // // // / • •... •, , \ ®� TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
_ UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE T
/ / 1 / UGp e U E 0
/ / 1+ I I // // °::'•:`•••GN\\ '� AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192.
o /23
// �G �� \ 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
Cn / �, EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
_;7,; / / , , , ,,•,, • „ ' 46CL I I //UGp ��� •,� COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
oc,, 47 / ::::....,, ``� �Go CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
STRUCTURES NO LONGER IN USE.
• 10 INCLUDE ILLUMINATION AND SIGNAL. CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
f/ RAINIER AVE S f I I / \� �G SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
> o :::.•:::::•::•::. °:::.. I p'4--. �y DESIGN.
CALL 2 DAYS
BEFORE YOU DIG
1-800-424-5555
JOINT UTILITY TRENCH LEGEND
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
WALKER'S RENTON SUBARU
CONSTRUCTION NOTES
4" DIAMETER CONDUIJ-CENTURYLINK (2 CONDUIT)
3" DIAMETER CONDDPIT-COMCAST (1 CONDUIT)
3" DIAMETER C09DUIT-COMCAST (3 CONDUIT)
A6" DIAMETER CONDUIT-PSE GAS (1 CONDUIT)
A6" DIAMETER CONDUIT-PSE POWER (2 CONDUIT)
AEND INSTALLATION OF 6" DIAMETER CONDUIT-PSE GAS - APPROXIMATE STA
47+40, LT
753 9th Avenue N 2502 Jefferson Avenue
Seattle, WA 98109 Tacoma, WA 98402
(206) 286-1640 (253) 627.0720
www,kpg.com
11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TC RE- AIN.
VAULT SCHEDULE
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT IN/FROM
LEFT
CONDUIT
OUT/TO RIGHT
Q13
264 TA
#925
CENTURYLINK
CENTURYLINK
CONTRACTOR
29q,30q
31 q,32q
C24
2436 MEDIUM DUTY VAULT
-
COMCAST
COMCAST
CONTRACTOR
40c,41 c,50c
43c,44c,45c
Q14
264 TA
#926
CENTURYLINK
-
CENTURYLINK
CONTRACTOR
31q,32q
-
C25
2436 MEDIUM DUTY VAULT
-
COMCAST
COMCAST
CONTRACTOR
43c,44c,45c
-
C28
17" 00"
-
COMCAST
COMCAST
CONTRACTOR
50c
1-3"
P41
CONNECT TO EX. VAULT
PV03
PSE
-
CONTRACTOR
-
42p,43p
P42
CONNECT TO EX. VAULT
SW04
PSE
-
CONTRACTOR
-
40p,41p
P43
CONNECT TO EX. VAULT
J24
PSE
-
CONTRACTOR
40p,41 p,42p,43p
-
P83
CONNECT TO EX. VAULT
SWO3
PSE
-
CONTRACTOR
38p,39p
-
C39
INTERCEPT POINT
-
COMCAST
-
CONTRACTOR
1-3"
-
CITY OF RENTON
B i D
Public Works Department
DOCUMENTS APPRXR CONSTRUCTION
BY: DATE: 41" ,/-.
T-3430113
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
16
EXISTING CONDITIONS
64
SITE PREPARATION & TESC PLAN
78
ALIGNMENT PLAN
90
ALIGNMENT PROFILE _
DRAINAGE PLANS
102
113
DRAINAGE PROFILE
123,124
WATER PLAN
141
WATER PROFILE -
155
JOINT UTILITY TRENCH PLAN
-
JOINT UTILITY TRENCH PROFILES
189
PROPERTY RESTORATION PLANS
204
CHANINELIZATION & SIGi'�ING PLAN
22:�
ILLUMINATION PLANS
237
IRRIGATION PLAN
291
LANDSCAPE PLAN
303