Loading...
HomeMy WebLinkAboutTRO4103430.147'_e 9 CD Of Crl it Q0 CD C 0 U 0 0 i cD w 0 Q 0 Ln Ln i z 0 z � L,.1 V) CD a- CL y NUMBER BROWN o WN BEAR CAR WASH �.\ 3/4 a 1 /4 3 \` ` _ LITHIA DODGE 15S-A i - - - -' _ 16S—A 1----- CHRYSL 32'9 19.4 /4 s ........ 3 4„ 2Y„ - - 1 3 41 3/4„ 2 3/4" A>`�,.. „ 1 1 4 m� �_ r _ 3 � 1 Y4„ 1 Y„ 3 4 2 i 3 3 44 \ 2F—A \ \ / 26 .&� 3/4,, 27 „ ADDENDUM #2 BOB BRIDGE SCION REVISION DESCRIPTION 10 2.5 1 1" 3 a 411 RAINIER AVE S \\ 1 1/4„ LG 1 LG =111=1111111111M111 0 1 1 /4 2 1/21 y" 1 y" 1 /4 2 2 -- e _ /4 — __----_- — I --woo! 8 2Y" 01 2 3 4„ 3/4" /4' 3/4 `' .. 14S—A _ 46.1 O — 1 1 2 IHOP / L — — — — — — — — — — — — — — 2 0 5 10 20 40 60 SCALE IN FEET SEE SHEETS 292 AND 293 FOR IRRIGATION SCHEDULE, DETAILS AND GENERAL NOTES. 1 4 s o 1" jJ 8 �y 34, V4" oow--�� KFC i IRRIGATION SCHEDULE CONSTRUCTION NOTES 0 ALL CONTROL VALVES TO BE LOCATED IN PLANTER AREAS, INSTALL VALVE BOX TIGHT TO EDGE OF PAVEMENT TO MAXIMIZE PLANTING AREA. LOCATION SHOWN IS DIAGRAMMATIC. 02 INSTALL MAIN LINE IN PLANTER AREA WHEREVER POSSIBLE, LOCATION SHOWN IS DIAGRAMMATIC. INSTALL LATERAL SUPPLY LINE FOR FILTERRA/TREE GRATE ZONE THROUGH PRECAST HOLES IN FILTERRA UNIT. SEE FILTERRA UNIT IRRIGATION LAYOUT DETAIL. INSTALL LINE IN PLANTER AREA LOCATION SHOWN IS DIAGRAMMATIC. INSTALL LATERAL SUPPLY LINE IN PLANTER AREA. LOCATION SHOWN IS DIAGRAMMATIC. 05 INSTALL POINT OF CONNECTION ASSEMBLY A, IN PLANTER, TIGHT TO EDGE OF PAVEMENT. LOCATION SHOWN IS DIAGRAMMATIC. SEE WATER PLANS FOR METER CONNECTION. 08 COORDINATE MAIN LINE AND LATERAL LINE INSTALLATION WITH JOINT UTILITY TRENCHING AND ILLUMINATION CONDUIT LOCATIONS. INSTALL SLEEVING AND LATERAL SUPPLY LINE FOR SPRAY ZONE BETWEEN FILTERRA UNIT AND SIDEWALK. MANUFACTURER MODEL NO. RAINBIRD BUBBLER SERIES — 1402 EST SST 1800-15 STRIP SERIES (SHRUB m ® RAINBIRD 1800-15 STRIP SERIES (LAWN) 8Q gH RAINBIRD 8 SERIES MPR (SHRUB) ® m RAINBIRD 12 SERIES MPR (LAWN) 12Q 12H 12F 2 ® 12Q 12H ® 12F RAINBIRD 12 SERIES MPR (SHRUB) Ilt ACN C 15Q 15H 15F RAINBIRD 15 MPR SERIES (SHRUB) ( B) 0 o O 15Q 15H 15F RAINBIRD 15 SERIES MPR (LAWN) SEE SHEET 292 FOR COMPLETE IRRIGATION SCHEDULE. T-3430226 CATEGORY SHEET RIGHT OF WAY PLANS 11 EXISTING CONDITIONS 59 SITE PREPARATION & TESC PLAN ---�� 73 , --- ALIGNMENT PLAN - 8 r, ALIGNMENT PROFILE 97 DRAINAGE PLANS 108 DRAINAGE PROFILE 117-119 WATER PLAN 136 WATER PROFILE 150 JOINT UTILITY TRENCH PLAN 168 JOINT UTILITY TRENCH PROFILES 184 PROPERTY RESTORATION PLANS 199 CHANNELIZATION & SIGNING PLAN 221 ILLUMINATION PLANS 232 IRRIGATION PLAN LANDSCAPE PLAN 298 11-14-11 SURVEYED: KPG Q Kph }'- CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 2�6 Z m � � � � DRAWN BY: EM S �' RADY WAY TO 2N , r BID S D ST PROJECT NO. TED4Q 340 o��� DESIGN BY: EM Public Works Department 753 9th Avenue N 2502 Jefferson Avenue FED AID NO.-CM0167 048) a N a Q CHECK BY: EG Seattle, WA 98109 Tacoma, WA 98402 E �aOfQ DOCUMENTS 3�o Q� PROJ MGR: JF (206)286-1640 (253)627-0720 APPROV D FOR CONSTRUCTION IRRIGATION PLAN DATE: NOV 2011 www.kpg,com --- BY: DATE: �. STA 24+50 TO STA 29+00 SHEET NO. 286 OF 304 FILE: 0655DIRR01.dwg /?