Loading...
HomeMy WebLinkAboutTRO4103430.1485 N CD ry 0 L0 Q0 0 U 0 i Of: C, u7 Ln 0 Q PLAN 0 5 10 20 40 60 SCALE IN FEET SEE SHEETS 292 AND 293 FOR i IRRIGATION SCHEDULE, DETAILS AND GENERAL NOTES. 00 00 w w Cn 0 k— Cn w z v Q IRRIGATION SCHEDULE CONSTRUCTION NOTES 0 ALL CONTROL VALVES TO BE LOCATED IN PLANTER AREAS. INSTALL VALVE BOX TIGHT TO EDGE OF PAVEMENT TO MAXIMIZE PLANTING AREA. LOCATION SHOWN IS DIAGRAMMATIC. INSTALL MAIN LINE IN PLANTER AREA WHEREVER POSSIBLE, LOCATION SHOWN IS DIAGRAMMATIC. � INSTALL LATERAL SUPPLY LINE FOR FILTERRA/TREE GRATE ZONE THROUGH PRECAST HOLES IN FILTERRA UNIT. SEE FILTERRA UNIT IRRIGATION LAYOUT DETAIL. INSTALL LINE IN PLANTER AREA LOCATION SHOWN IS DIAGRAMMATIC. INSTALL LATERAL SUPPLY LINE IN PLANTER AREA. LOCATION SHOWN IS DIAGRAMMATIC. 0 COORDINATE MAIN LINE AND LATERAL LINE INSTALLATION WITH JOINT UTILITY TRENCHING AND ILLUMINATION CONDUIT LOCATIONS. <9> INSTALL SLEEVING AND LATERAL SUPPLY LINE FOR SPRAY ZONE BETWEEN FILTERRA UNIT AND SIDEWALK. SYMBOL MANUFACTURER MODEL NO. e RAINBIRD BUBBLER SERIES - 1402 i EST SST RAINBIRD 1800-15 STRIP SERIES (SHRUB d RAINBIRD 1800-15 STRIP SERIES (LAWN) 8Q gH RAINBIRD 8 SERIES MPR (SHRUB) 21 m ® RAINBIRD 12 SERIES MPR (LAWN) 12Q 12H 12F 2 ® ® 12Q 12H 12F RAINBIRD 12 SERIES MPR (SHRUB) C RAINBIRD 15 SERIES MP R (SHRUB) ) 15Q 15H 15F 15Q 155HH 155FF RAINBIRD 15 SERIES MPR (LAWN) SEE SHEET 292 FOR COMPLETE IRRIGATION SCHEDULE. T 3430227 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 12 EXISTING CONDITIONS 60 SITE PREPARATION & TESC PLAN 74 ALIGNMENT PLAN 86 ALIGNMENT PROFILE 98 DRAINAGE PLANS 109 DRAINAGE PROFILE 119,120 WATER PLAN 137 WATER PROFILE 151 JOINT UTILITY TRENCH PLAN 169 JOINT UTILITY TRENCH PROFILES 185 PROPERTY RESTORATION PLANS I 200 CHANNELIZATION & SIGNING PLAN 222 ILLUMINATION PLANS 233 IRRIGATION PLAN LANDSCAPE PLAN 299 U w CI Zo= Z Q 01 14-11 Z� � SURVEYED: KPG DRAWN BY: EM DESIGN BY: EM KPH R BID D 753 9th Avenue N 2502 Jefferson Avenue '� CITY OF IZENTON "L — Public Works Department RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST DRAWING NO. 27 PROJECT NO. TED403430 FED AID NO.-CM0167 048) CHECK BY: EG Seattle, WA98109 Tacoma, WA98402 DOCUMENTS APPROV D FOR CONSTRUCTION IRRIGATION PLAN DATE: 2011 q� Q 3 U)a o J 0 PROJ MGR: JF 0655DIRR01.dwg (206) 286-1640 (253) 627-0720_, www,kpg.com BY: DATE: STA 29+00 TO STA 33+50 _NOV SHEET NO. 287 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE FILE: z Cn Cn a C� 44, 1 �cn -A J ;D d 1 a ■p y 0 0 N z Cn y