HomeMy WebLinkAboutTRO4103430.1485
N
CD
ry
0
L0
Q0
0
U
0
i
Of:
C,
u7
Ln
0
Q
PLAN
0 5 10 20 40 60
SCALE IN FEET
SEE SHEETS 292 AND 293 FOR
i IRRIGATION SCHEDULE, DETAILS
AND GENERAL NOTES.
00
00
w
w
Cn
0
k—
Cn
w
z
v
Q
IRRIGATION SCHEDULE
CONSTRUCTION NOTES
0 ALL CONTROL VALVES TO BE LOCATED IN PLANTER AREAS.
INSTALL VALVE BOX TIGHT TO EDGE OF PAVEMENT TO
MAXIMIZE PLANTING AREA. LOCATION SHOWN IS
DIAGRAMMATIC.
INSTALL MAIN LINE IN PLANTER AREA WHEREVER POSSIBLE,
LOCATION SHOWN IS DIAGRAMMATIC.
� INSTALL LATERAL SUPPLY LINE FOR FILTERRA/TREE GRATE
ZONE THROUGH PRECAST HOLES IN FILTERRA UNIT. SEE
FILTERRA UNIT IRRIGATION LAYOUT DETAIL. INSTALL LINE IN
PLANTER AREA LOCATION SHOWN IS DIAGRAMMATIC.
INSTALL LATERAL SUPPLY LINE IN PLANTER AREA. LOCATION
SHOWN IS DIAGRAMMATIC.
0 COORDINATE MAIN LINE AND LATERAL LINE INSTALLATION WITH
JOINT UTILITY TRENCHING AND ILLUMINATION CONDUIT
LOCATIONS.
<9> INSTALL SLEEVING AND LATERAL SUPPLY LINE FOR SPRAY
ZONE BETWEEN FILTERRA UNIT AND SIDEWALK.
SYMBOL
MANUFACTURER MODEL
NO.
e
RAINBIRD
BUBBLER SERIES - 1402
i
EST
SST
RAINBIRD
1800-15 STRIP
SERIES (SHRUB
d
RAINBIRD
1800-15 STRIP
SERIES (LAWN)
8Q
gH
RAINBIRD
8 SERIES MPR
(SHRUB)
21 m
®
RAINBIRD
12 SERIES MPR
(LAWN)
12Q 12H 12F
2 ® ®
12Q 12H 12F
RAINBIRD
12 SERIES MPR
(SHRUB)
C
RAINBIRD
15 SERIES MP R
(SHRUB) )
15Q 15H
15F
15Q 155HH
155FF
RAINBIRD
15 SERIES MPR
(LAWN)
SEE SHEET 292 FOR COMPLETE IRRIGATION SCHEDULE.
T 3430227
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
12
EXISTING CONDITIONS
60
SITE PREPARATION & TESC PLAN
74
ALIGNMENT PLAN
86
ALIGNMENT PROFILE
98
DRAINAGE PLANS
109
DRAINAGE PROFILE
119,120
WATER PLAN
137
WATER PROFILE
151
JOINT UTILITY TRENCH PLAN
169
JOINT UTILITY TRENCH PROFILES
185
PROPERTY RESTORATION PLANS
I 200
CHANNELIZATION & SIGNING PLAN
222
ILLUMINATION PLANS
233
IRRIGATION PLAN
LANDSCAPE PLAN
299
U
w
CI Zo=
Z Q
01 14-11
Z�
�
SURVEYED: KPG
DRAWN BY: EM
DESIGN BY: EM
KPH
R
BID D
753 9th Avenue N 2502 Jefferson Avenue
'� CITY OF IZENTON
"L
— Public Works Department
RAINIER AVENUE S (SR 167)
S GRADY WAY TO S 2ND ST
DRAWING NO. 27
PROJECT NO. TED403430
FED AID NO.-CM0167 048)
CHECK BY: EG
Seattle, WA98109 Tacoma, WA98402
DOCUMENTS
APPROV D FOR CONSTRUCTION
IRRIGATION PLAN
DATE: 2011
q�
Q 3 U)a
o
J
0
PROJ MGR: JF
0655DIRR01.dwg
(206) 286-1640 (253) 627-0720_,
www,kpg.com
BY: DATE:
STA 29+00 TO STA 33+50
_NOV
SHEET NO. 287 OF 304
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE
FILE:
z
Cn
Cn
a
C�
44,
1
�cn
-A
J ;D
d 1
a ■p
y
0 0
N
z
Cn
y