Loading...
HomeMy WebLinkAboutTRO4103430.27FULL DEPTH rV- i ¢ +el' ' JOINT \fop FULL DEPTH EXPANSION JOINT (TYP) - CEMENT (sONCRt TE SIDEWALK CD o U Ln Q0 z 0 z w � NL;NBER - o � 0 I a A a C1 6'-1 1 /4" a Q <� a I as ELECTRICAL COgUIT STUB -UP a SEE DETAIL, THIS SHEET. a a a a a a a a ° a a a 20'-O" v _ Q. a a. a � n . L_J 4 FUTURE SHELTER ;(- _ _ J a MOUNT!IG PLATE TO BE INSTALLED BY OTH' (TYP) a a a. a PLAN VIEW a a a, a a � a a PLACEMENT REFERENCE POINT SEE PLACEMENT SCHEDULE, THIS SHEET c a a xn 0 A Ln I N ELECTRICAL CONDUIT I i r STUB -UP, SEE DETAIL, I I > I I THIS SHEET I I CD #5 ® 12" MAX EACH WAY I I I z TOP AND BOTTOM. I I I I SPACE REBAR TO MISS I I FUTURE ANCHOR RODS I Tr4. I �'— -iir. �. n ® o ° ° 'd�� a •e" —!- .'a -mi' �� '.� a. e°. u .. ° d .a .a U a ° n e °.. '� -. °. d 4 ° .4. ° d II ° _ d n a Lle L.r a' �. • �. ° e d ° a (L!E LIJ 0 4" CSBC U SECTION A -A RAPID RIDE BUS SHELTER FOUNDATION N TS FUTURE SHELTER LEG TO BE INSTALLED BY OTHERS �- 1" GRS COUPLING RAPID RIDE BUS SHELTER FOUNDATION e .3" PVC .CAP',, a ' 4° ° a. . 1" 0 THREADED GRS TO ELECTRICAL HAND HOLE SEE ILLUMINATION AND INTERCONNECT PLANS FOR SPECIFIC LOCATION ELECTRICAL CONDUIT STUB -UP N TS 5'-9" (X 5'-9„) ELEVATION VIEW FUTURE SIGN TO BE INSTALLED BY OTHERS RAPID RIDE BUS SHELTER FOUNDATION NOTES: 1. MATCH TO EXISTING SIDEWALK SLOPE TO ASSURE PROPER DRAINAGE OF SURFACE WATER; 2% MAX CROSS SLOPE. 2. PROVIDE TEN (10) DAYS PRIOR NOTICE FOR ANY CONSTRUCTION IMPACTS TO BUS STOPS OR BUS SERVICE. CONTACT RICHARD GARCIA, KING COUNTY METRO'S CONSTRUCTION COORDINATOR AT (206) 684-2732, 3. CONTACT METRO INSPECTOR PAUL MILLER AT (206) 684-2224, 48 HOURS BEFORE FORMING AND POURING CONCRETE FOR THE BUS SHELTER FOUNDATION. 4. ANY CONSTRUCTION OR INSTALLATION ACTIVITIES AFFECTING TRANSIT OPERATIONS OR FACILITIES MUST BE COORDINATED THROUGH METRO TRANSIT CONSTRUCTION INFORMATION CENTER. FOR NOTIFICATION INFORMATION AND GUIDELINES, PLEASE VISIT: HTTP: //WWW.KING000NTY.GOV/TRANSPORTATION/ KCDOT/METROTRANSIT/CONSTRUCTION. ASPX. RAPID RIDE BUS SHELTER FOUNDATION PLACEMENT SCHEDULE STATION OFFSET ?_ 11+89.19 60.50' RT 2 20+07,05 60.50' LT 3 25+74.69 60.40' RT 4 36+16.88 54.50' RT 5 38+78.84 54.50' LT SECTION C-C METRO SIGN FOUNDATION N TS #4 @ 12" O.C. FUTURE 6" HIGH STEM WALL TO BE INSTALLED BY OTHERS B JF CD as N 7" 3-9 1 /2" S-0„ B _]�O O STATION I OFFSE'1 11+61.29 60.50' RT 2 20+29.55 60.50' LT 3_25+58.91 I 60.50' RT_05 ! 39+05.53 54,5 A', O O a ELECTRICAL CONDUIT STUB -UP a SEE DETAIL, THIS SHEET NCONDUIT 9 1/2" ... ° ° a 2,— 6" 5'--0" FUTURE 6" HIGH STEM WALL TO BE INSTALLED BY OTHERS FLUSH WITH ADJACENT FLAT SURFACE T FULL DEPTH EXPANSION JOINT (TYP) NENERAL NOTE NUMBER. EE GENERAL NOTES. METRO SIGN FOUNDATION PLACEMENT SCHEDULE # A', O O a ELECTRICAL CONDUIT STUB -UP a SEE DETAIL, THIS SHEET NCONDUIT 9 1/2" ... ° ° a 2,— 6" 5'--0" FUTURE 6" HIGH STEM WALL TO BE INSTALLED BY OTHERS FLUSH WITH ADJACENT FLAT SURFACE T FULL DEPTH EXPANSION JOINT (TYP) NENERAL NOTE NUMBER. EE GENERAL NOTES. METRO SIGN FOUNDATION PLACEMENT SCHEDULE # STATION OFFSET 1 12+09.19 1 52.88' RT 2 1 19+81.17 52.88' LT 3 25+93.11 52.78' RT 4 36+31.38 _ 46.88' RT 5 38+58.34 46.88' L I PLAN VIEW PLACEMENT REFERENCE POINT SEE PLACEMENT SCHEDULE, THIS SHEET ELECTRICAL CONDUIT STUB -UP (EE DETAIL, THIS SHEET a C 4 d #5 ® 12" MAX 4" CSBC EACH WAY 1 2 BOTH TOP AND BOTTOM 1" 00 GRS (PLUGGED UNTIL SECTION B-B PYLON READY FOR INSTALLATION) METRO TECH PYLON FOUNDATION N TS METRO TECH PYLON GENERAL NOTES 1. ALL NEW CONDUIT INSTALLED UNDERGROUND SHALL HAVE A MINIMUM COVER OF 24 INCHES. 2, PLACE 6 INCH WIDE MAGNATEK WARDING TAPE, OR APPROVED EQUAL, 12 INCHES BELOW GRADE OVER ALL C30NDUIT RUNS, 3. STUB UP THE CONDUIT AS INDICATED WITH A COUPLING INSTALLED ON THE STUBBED UP END WITH THE TOP OF THE COUPLING FLUSH WITH FINISHED SURFACE. A T HREADED MALE PLUG SHALL BE INSTALLED IN THE TOP OF THE COUPLING AT THE TIh F �O� �HE O�.J'�D.�T'Oh1'�;Tlr_ WALL PLACEM� IT. WRAi� P° ;�� �"")(; �' IN(" ����,D TCP n :N :, ,E. CONDUIT WITH DUCT TAPE PRIOR TO POURING CONCREI E. 4. EPDXY ALL JOINTS TO ENSURE WATER CANNOT ENTER THE CONDUIT THROUGH THE CONNECTION. DO NO-_ EPDXY THE PLUG. T 343027 11-14-11 ti�� G�IA�O�� _ �Go �E20320w� � crsTE� � � �rsIpNAL E� SURVEYED: KPG DRAWN BY: JMDp� DESIGN BY: KPG CHECK BY: JLF PROJ MGR: JF FILE: 0655DDET01.dwg 753 9th Avenue N 2502 Jefferson Avenue BID Seaftle; WA 98109 Tacoma, WA 98402 DOCUMENTS , 206 2861640 253 627 0 20 www.kpg,com Ad CITY OF RENTON Public Works Department APPROVED FOR CONSTRUCTION BY: DATE: RAINIER AVENUE S (S R 167) S G RAD`Y WAY TO S 2N D ST DETAILS DRAWING NO. 27 - PROJECT NO. TED403430 FF-D AID NO.-Ck4rj1 6 s ;,ri/_b; DA i E: 2011 —NOV SHEET NO. 27 OF 304 ---- REVISION DESCRIPTION ` u ' APP. DATE