HomeMy WebLinkAboutTRO4103430.3 (2)0-
ry
0
N
N
0
0
Q
T)
Q0
0
0
v
s
CP
a
0
i
z
CD
w
0
i
0
Q
�I
I
U0
Q0
c�
LLJ
z
cn
U
w
0
Ily
f
✓ ' mow` ♦ �
01
♦®� '��'
oe�
tiP
SU SEATTLE SUPER
/ P4 ♦ T
C3 C2 ®- 5
-
-- — —
�VQC1J J T J T J T
-
JT
JT G--, U UGP UGP - UGP UGP IGP UGP UGp- ��C CZ
f G P ---- J UGPG
- -. - - - - - -� GP _ P
r� GP_ -UGP- C,�---------_ _ \ UGP U.GP U� UGp
G
_ UGP----_
3 _--`
v --- ------ UGP_
749+78.86 - _ _ - - _UGP —`
s _
® -- ---- ---- 1 - UGp UGP-
L0 11 1 00 — — — UGP`
-� �, 18 6 _
--- — C
LO - 3 W
CD
19 =
cn
Ln
11 1 IER AVE S J ,_ C o
un
0
.cL ao c�1
1 c cn
NJ--- - - -
v I 1 11 _ _--- UGP �1GP -UGP UGP ,-- UGP UGP UGP UGP---- UGP
-
_
� UGP ----- _
- -- UGP-__- UGP � UGP---_-_ UGPU
P UGP GPI UGP — — _ ® P61
__
---_
UGp
- _ -
-
------------------
-- -
SOUNDFORD
C4
1-11
_
WALKER'S RENTON SUBARU P5
GENERAL JOINT UTILITY TRENCH PLAN NOTES I12 2 - -
1.
2.
3.
4.
5.
6.
7
EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
COORDINATION, LAYOUT, SURVEYING, 'TRENCHING, EXCAVATION, BEDDING, BACKFILL
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
GAS, COMCAST, AND CENTURYLINK.
THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
FRANCHISE UTILITIES.
PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
CONVERSION.
THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
THE CITY OF RENTON.
COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
FOR THEIR CONVERSION.
UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
BADE BY THE FRANCHISE UTILITIES.
UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
PROPERTY OWNER FROM THE RIGHT—OF—WAY TO EXISTING PRIVATE METERS.
NUMBER REVISION DESCRIPTION
AND PROFILE SHEETS 174-192. ADJUST THE HORIZONTAL ALIGNMENT AND
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180-192.
9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
STRUCTURES NO LONGER IN USE.
10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
DESIGN.
11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
BY I APP.I DATE
SURVEYED:
KPG
�x GIA cod
�0, WAsy�
DRAWN BY:
SOD
�o
DESIGN BY:
SOD
320
T E
L �lyG
753 9th Avenue N 2502 Jefferson Avenue
Seattle, WA 98109 Tacoma, WA 98402
(206) 286-1640 (253) 627-0720
www.kpg.com
JOINT UTILITY TRENCH LEGEND
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
VAULT SCHEDULE
0 5 10 20 40 60
SCALE IN FEET
CONSTRUCTION NOTES
f L \ 4" DIAME-i ER CONDUIT—CENTURYLINK (1 CONDUIT)
A3" DIAMETER CONDUIT—COMCAST (1 CONDUIT)
A 4" DIAMETER CONDUIT—PSE POWER (1 CONDUIT)
ID
CITY
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT
IN/FROM LEFT
CONDUIT OUT/TO
RIGHT
P4
THREE PHASE J—BOX _
J08
'PSE
PSE
CONTRACTOR
5p,6p
7p,8p,9p,10p
C3
2436 MEDIUM DUTY VAULT
—
COMCAST
COMCAST
CONTRACTOR
5c,6c
7c,8c
P5
5106 DEEP VAULT
VO4
PSE
PSE
CONTRACTOR
— —
11p
Q5
264 TA
#917
CENTURYLINK
CENTURYLINK
CONTRACTOR
—
11 q
C4
17"x30"
—
COMCAST
COMCAST
CONTRACTOR
1-3"
—
P32
INTERCEPT POINT
IP03
PSE
—
CONTRACTOR
1-4"
—
P33
INTERCEPT POINT
IP02
PSE
—
CONTRACTOR
2p,4p
—
P59
REMOVE VAULT
V02
PSE
—
CONTRACTOR
—
—
P60
REMOVE VAULT
J09
PSE
—
CONTRACTOR
—
—
P61
REMOVE VAULT
V05
PSE
—
CONTRACTOR
—
—
TY OF REN
TON
BID =�
Public Works Department
DOCUMENTS APPROVED FOR CONSTRUCTION �
BY DATE:
T-3430106
CALL 2 DAYS
BEFORE YOU DIG
1-800-424-5555
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS�9
EXISTING CONDITIONS
_
57
SITE PREPARATION & TESC PLAN
71
ALIGNMENT PLAN
83
ALIGNMENT PROFILE
95
DRAINAGE PLANS
106
DRAINAGE PROFILE
115,116
WATER PLAN
134
WATER PROFILE
148
JOINT UTILITY TRENCH PLAN
-
JOINT UTILITY TRENCH PROFILES
182
PROPERTY RESTORATION PLANS
197
CHANNELIZATION &SIGNING PLAN
219
ILLUMINATION PLANS
230
IRRIGATION PLAN
284
LANDSCAPE PLAN
296
RAINIER AVENUE S (SR 107)
S GRADY WAY TO S 2ND ST
JOINT UTILITY TRENCH PLAN
STA 15+50 TO STA 20+00
DRAWIN6 NO.
6 J_
PROJECT NO.
TED403430
FED AID NO.
-CM0167(048)
DATE:
NOV 2011
SHEET NO. 166 OF 304